ML20272A151
| ML20272A151 | |
| Person / Time | |
|---|---|
| Site: | 99900003 |
| Issue date: | 09/28/2020 |
| From: | NRC |
| To: | NRC/NRR/DNRL/NRLB |
| References | |
| Download: ML20272A151 (4) | |
Text
From:
Franovich, Rani Sent:
Monday, September 28, 2020 9:34 AM To:
GEH-BWRX-300MtgSumPEm Resource
Subject:
GEH BWRX-300 Public Meeting Summary March 12, 2020 Attachments:
2 GEH BWRX-300 Public Meeting Summary March 12, 2020.docx Rani Rani Franovich GE-Hitachi BWRX-300 Design Review
Hearing Identifier:
GEH_BWRX300_Mtgs_Public Email Number:
4 Mail Envelope Properties (BY5PR09MB4358D3676FD2EC7ACF7A3B8D8F350)
Subject:
GEH BWRX-300 Public Meeting Summary March 12, 2020 Sent Date:
9/28/2020 9:33:35 AM Received Date:
9/28/2020 9:33:37 AM From:
Franovich, Rani Created By:
Rani.Franovich@nrc.gov Recipients:
"GEH-BWRX-300MtgSumPEm Resource" <GEH-BWRX-300MtgSumPEm.Resource@nrc.gov>
Tracking Status: None Post Office:
BY5PR09MB4358.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 96 9/28/2020 9:33:37 AM 2 GEH BWRX-300 Public Meeting Summary March 12, 2020.docx 22296 Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
U.S. Nuclear Regulatory Commission Public Meeting Summary
Title:
General Electric Hitachi (GEH) public teleconference to discuss technical issues related to Containment Performance and Reactivity Control.
Meeting Notice: ADAMS accession number: ML20071K456 Date of Meeting: Thursday, March 12, 2020 Location: Via teleconference Type of Meeting: Category 1 Purpose of the Meeting:
To discuss the technical merits of Licensing Topical Report (LTR) NEDC-33910P, BWRX-300 Reactor Pressure Vessel Isolation and Overpressure Protection (ADAMS Accession number ML19364A212) and pre-application matters related to construction permitting of the GEH BWRX-300 power reactor design.
Summary of Meeting:
The meeting started with a brief introduction by NRC licensing project manager (PM) Rani Franovich, who explained the purpose of the meeting, asked participants to introduce themselves and described how the meeting would be conducted (including discussion of proprietary information on a separate, closed bridge-line).
Because the discussions involved proprietary information, the public portion of the meeting adjourned and detailed discussions of the LTR were resumed on the closed bridge-line.
After these closed discussions, the meeting was adjourned.
Meeting participants: See the following page.
March 12, 2020, Meeting Attendees Open Closed Name Affiliation X
X Rani Franovich NRC X
X Renee Li NRC X
X Ryan Nolan NRC X
X Rebecca Patton NRC X
X Andrew Proffitt NRC X
X Tom Scarbrough NRC X
X Christer Dahlgren GEH Wilmington X
X David Hinds GEH Wilmington X
X Douglas McDonald GEH Wilmington X
X Martin Owens GEH Wilmington X
X George Wadkins GEH Wilmington