ML20265B648
From kanterella
Jump to navigation
Jump to search
ML20265B648 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 06/20/1980 |
From: | STONE & WEBSTER ENGINEERING CORP. |
To: | DUQUESNE LIGHT CO. |
References | |
CON-12690.85 11700-LSK-20-1C, NUDOCS 8701060046 | |
Download: ML20265B648 (1) | |
Similar Documents at Beaver Valley | |
---|---|
Category:DRAWINGS
MONTHYEARML20266B0631997-07-23023 July 1997
[Table view]Flow Diagram Reactor Coolant System.Sheet 2 ML20266B1181997-06-0404 June 1997 Flow Diagram River Water System ML20266B1031997-04-22022 April 1997 Flow Diagram River Water System ML20266B0771997-03-26026 March 1997 Flow Diagram Safety Injection System ML20266B0581997-02-13013 February 1997 Flow Diagram Reactor Coolant System.Sheet 1 ML20266B0821997-01-14014 January 1997 Flow Diagram Safety Injection System ML20266B1001996-12-0404 December 1996 Flow Diagram River Water System ML20266B0531996-10-16016 October 1996 Flow Diagram Vent & Drain Systems.Sheet 1 ML20266B0951996-08-26026 August 1996 Flow Diagram Fuel Pool Cooling & Purification Sys ML20266B0901996-08-22022 August 1996 Flow Diagram Containment Depressurization Sys ML20266B1131996-07-31031 July 1996 Flow Diagram River Water System ML20266B0301996-07-23023 July 1996 Flow Diagram Feed Water ML20266B1081996-07-15015 July 1996 Flow Diagram River Water System ML20266B0671996-07-0909 July 1996 Flow Diagram Charging & Volume Control Sys.Sheet 2 ML20266B0351996-04-22022 April 1996 Flow Diagram Component Cooling Water.Sheet 1 ML20266B0441996-04-22022 April 1996 Flow Diagram Component Cooling Water.Sheet 3 ML20266B0871996-02-28028 February 1996 Flow Diagram Containment Depressurization Sys ML20266B0481995-10-0202 October 1995 Flow Diagram Component Cooling Water ML20266B0721995-08-0909 August 1995 Flow Diagram Residual Heat Removal System ML20262E1861993-12-14014 December 1993 Valve Oper No Diagram Recirculation Spray System ML20266B0391990-01-19019 January 1990 Flow Diagram Component Cooling Water.Sheet 2 ML20266F5691987-03-0909 March 1987 Partially Illegible Elem Diag of Control Room Ventilation Sys ML20266F5971987-02-0505 February 1987 Front View,Altn Shutdn Pnl Sect 1 & 2 ML20260G7991985-12-17017 December 1985 Beaver County PA Waste Water Diagram ML20261M6041985-11-0707 November 1985 Elem Diag Reactor Trip Switchgear 52/RTA,52/RTB,52/BYA & 52/BYB ML20261M6181985-07-0909 July 1985 Westinghouse Wnes Monroeville PA Lyme Ds Reactor Trip SWGR DMW 260V 3PH 58 3 Hz ML20261M6111985-07-0909 July 1985 Westinghouse Wnes Monroeville PA Lyme Ds Reactor Trip SWGR DMW 260V 3PH 58 3 Kz ML20261M6141985-07-0909 July 1985 Westinghouse Wnes Monroeville PA Lyme Ds Reactor Trip SWGR DMW 260V 3PH 58 3 Hz ML20266G8671985-04-0808 April 1985 Westinghouse Whes Monroeville PA Lyme Ds Reactor Trip SWGR DMW 260V 3PH 58.3 Hz ML20266G8701985-04-0808 April 1985 Westinghouse Whes Monroeville PA Lyme Ds Reactor Trip SWGR Dhw 260V 3PH 58.3 Hz ML20266G8741985-04-0808 April 1985 Westinghouse Whes Monroeville PA Lyme Ds Reactor Trip SWGR Dhw 260V 3PH 58.3 Hz ML20260G0661985-02-0505 February 1985 4160V One Line Diagram. Sheet 3.Rev Date Illegible ML20259E3591984-11-0808 November 1984 Marked-up Finished Paving & Grading Plan. Sheet 2.Rev Date Illegible. Actual Rev STATUS:7A ML20266B0261984-10-24024 October 1984 Flow Diagram Main Steam ML20264E2631984-09-0707 September 1984 Concealed Conduit & Sleeves Diesel Gen Bldg. Sheet 1. Rev Date Illegible. Actual Rev STATUS:4B ML20264E2641984-09-0707 September 1984 Concealed Conduit & Sleeves Service Building. Sheet 4. Rev Date Illegible. Actual Rev STATUS:12B ML20264E2621984-09-0707 September 1984 Conduit Plan Service Building Purple Swgr Room El 730 Ft 6 Inches. Rev Date Illegible. Actual Rev STATUS:7G ML20264E2611984-09-0707 September 1984 Conduit Plan - Service Building Cable Tray Area El 745 Ft 6 Inches. Sheet 2.Rev Date Illegible. Actual Rev STATUS:5D ML20264E2581984-09-0707 September 1984 Arrangement 5 Kv Cabl-Bus. Rev Date Illegible. Actual Rev STATUS:8B ML20264E2601984-09-0707 September 1984 Conduit Plan - Service Building Cable Tray Area El 745 Ft 6 Inches. Sheet 1.Rev Date Illegible. Actual Rev STATUS:4H ML20264E2591984-09-0707 September 1984 Conduit Plan Service Building Orange Swgr Room El 730 Ft 6 Inches. Rev Date Illegible ML20259E4511984-07-19019 July 1984 Flow Diagram:Nuclear Eqpt Vent & Dr Pp. Sheet 1. Actual Rev STATUS:16B ML20264E2661984-07-0303 July 1984 Elementary Diagram:480V MCC Ckts Safety Inj Accum Outlet Isolation Vv ML20264E2721984-07-0303 July 1984 Elementary Diagram:480V MCC Ckts Safety Injection System Valves ML20259E4371984-06-28028 June 1984 Flow Diagram:Chemical & Volume Control Piping. Sheet 4. Actual Rev STATUS:10B ML20259E4181984-05-31031 May 1984 Flow Diagram:Reactor Coolant Piping. Sheet 2. Actual Rev STATUS:13A ML20259E4421984-05-29029 May 1984 Flow Diagram:Safety Injection Piping. Sheet 1.Rev Date Illegible. Actual Rev STATUS:13A ML20264E2811984-05-24024 May 1984 Elementary Diagram:480V MCC Ckts Charging Pp to Hot Leg Isol Valve ML20263T4251984-05-23023 May 1984 Cable Tray Arrangement:Auxiliary Building El 755 Ft 6 Inches. Rev Date Illegible. Actual Rev STATUS:9C ML20263T4221984-05-23023 May 1984 Cable Tray Arrangement:Auxiliary Building El 735 Ft 6 Inches. Rev Date Illegible. Actual Rev STATUS:11A 1997-07-23 Category:INSTRUMENTATION DRAWINGS-APPLICANT'S FACILITY MONTHYEARML20266F5971987-02-0505 February 1987
[Table view]Front View,Altn Shutdn Pnl Sect 1 & 2 ML20262D1391982-07-26026 July 1982 Valve Oper No Diag Post-Accident Sampling Sys ML20262B9501982-07-0707 July 1982 Valve Oper No Diag Intake Structure ML20262B9541982-07-0101 July 1982 Valve Oper No Diag River Water System ML20262D1301982-06-26026 June 1982 Valve Oper No Diag Containment Vac & Leakage Monitoring ML20262D1351982-06-26026 June 1982 Valve Oper No Diag Sample System. Sheet 1 ML20262B9771982-06-23023 June 1982 Valve Oper No Diag Chemical & Volume Control Sys. Sheet 1 ML20262B9721982-06-17017 June 1982 Valve Oper No Diagram Safety Injection System. Sheet 1 ML20262B9631982-02-0909 February 1982 Valve Oper No Diag Containment Depressurization System ML20260K4211980-10-15015 October 1980 Elementary Diagram Annunciator A4. Sheet 3 of 4 ML20260K3901980-09-15015 September 1980 Elementary Diagram Feed Water (Fw). Sheet 7 of 7 ML20260K3891980-09-15015 September 1980 Elementary Diagram Feed Water (Fw). Sheet 6 of 7 ML20260K3951980-09-15015 September 1980 Annunciator A5 Window Arrangement ML20260K3841980-09-15015 September 1980 Elementary Diagram Feed Water (Fw). Sheet 5 of 7 ML20260K3811980-09-15015 September 1980 Elementary Diagram Feed Water (Fw). Sheet 2 of 7 ML20260K3771980-09-15015 September 1980 Elementary Diagram Feed Water (Fw). Sheet 1 of 7 ML20260K4191980-08-0101 August 1980 Annunciator A4 Window Arrangement ML20265B6171980-07-30030 July 1980 Logic Diagram:Fire Detection System, as-built. Actual Drawing NUMBER:11700-LSK-20-5A-3A-3. Actual Rev STATUS:3A-3 ML20265B6341980-07-30030 July 1980 Logic Diagram:Water Fire Protection System Deluge, as-built. Actual Drawing NUMBER:11700-LSK-20-1G-4A-2. Actual Rev STATUS:4A-2 ML20265B6541980-06-20020 June 1980 Logic Diagram:Water Fire Protection System Sprinklers, as-built. Actual Drawing NUMBER:11700-LSK-20-1A-4A-2. Actual Rev STATUS:4A-2 ML20265B6481980-06-20020 June 1980 Logic Diagram:Water Fire Protection System Deluge, as-built. Actual Drawing NUMBER:11700-LSK-20-1C-4A-2. Actual Rev STATUS:4A-2 ML20265B6521980-06-20020 June 1980 Logic Diagram:Water Fire Protection System Deluge, as-built. Actual Drawing NUMBER:11700-LSK-20-1B-4A-2. Actual Rev STATUS:4A-2 ML20265B6431980-06-20020 June 1980 Logic Diagram:Water Fire Protection Deluge, as-built. Actual Drawing NUMBER:11700-LSK-20-1D-4A-2. Actual Rev STATUS:4A-2 ML20265B6401980-06-20020 June 1980 Logic Diagram:Water Fire Protection System Deluge, as-built. Actual Drawing NUMBER:11700-LSK-20-1E-4A-2. Actual Rev STATUS:4A-2 ML20265B6351980-06-20020 June 1980 Logic Diagram:Water Fire Protection System Deluge, as-built. Actual Drawing NUMBER:11700-LSK-20-1F-4A-2. Actual Rev STATUS:4A-2 ML20260K4031980-05-0808 May 1980 Elem Diag - Instr Loop Fuel Storage Pool,Stm Gen Fd Manifold,Stm Gen Aux Fd Line ML20260K4151979-03-27027 March 1979 Elementary Diagram Main Steam (Ms). Sheet 2 of 7 ML20262B9231977-10-27027 October 1977 Valve Oper No Diag Post DBA Hydrogen Control Sys ML20260K3741976-09-22022 September 1976 Elem Diag Diesel Gen 1 & 2 Auto Loading Sequence ML20262B9671976-05-27027 May 1976 Valve Oper No Diag Safety Injection System, as-built. Sheet 2 ML20260K3131975-08-13013 August 1975 Logic Diagram Pressurizer Control ML20260K3111975-08-13013 August 1975 Logic Diagram Pressurizer Control ML20260K3061975-08-13013 August 1975 Logic Diagram Pressurizer Control ML20260K3251974-09-10010 September 1974 Logic Diagram Auxiliary Feed Water Control & Stop Valves ML20260K3201974-09-10010 September 1974 Logic Diagram - Steam Generator Auxiliary Feed Pump - Turbine Driven ML20260K3181974-04-10010 April 1974 Logic Diagram - Steam Generator Auxiliary Feed Pump - Motor Driven ML20262H3101972-09-26026 September 1972 Charging & Volume Control High Head Safety Injection System Cable Vault Area El 722 Ft - 6 Inches 1987-02-05 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20265B648&oldid=3123036"