OMB-3150-0011 Draft 2021 Collection Renewal, 10 CFR Part 50 Domestic Licensing of Production and Utilization Facilities - Burden Tables
ML20264E688
Person / Time
Issue date: 02/09/2021
From:
Office of Nuclear Reactor Regulation
To:
NRC/OCIO
Shared Package
ML20244A279 List:
References
3150-0011, NRC-2020-0204
Download: ML20264E688 (14)


Text

Supporting Statement Section Rule Section Description Number of Respondents Responses per Respondent Total Number of Responses Burden per

Response

Total Annual Burden Hours Total Cost @

$279/Hour 50.33(a)-(d), (j)

Early Site Permit application - general information

- - - 360.0 - $ -

50.33(a)-(d), (j)

Standard Design Certification application -

general information 1.0 0.3 0.3 450.0 148.5 $ 41,432 50.33(a)-(d), (g)

Combined OL application - general information

- - - 2,700.0 - $ -

50.33(a)-(d), (f)-(j)

Standard Design Approval application -

general information 1.0 0.3 0.3 450.0 148.5 $ 41,432 50.33(a)-(d), (f)-(j)

Manfacturing License application - general information

- - - 450.0 - $ -

50.33(a)-(d), (f)-(j)

NPUF Construction Permit application -

general information

- - - 2,700.0 - $ -

50.33(a)-(d), (f)-(j)

NPUF Operating License application -

general information

- - - 2,700.0 - $ -

50.33(a)-(d), (f)-(j)

Nuclear Power Plant Construction Permit application - general information

- - - 2,700.0 - $ -

50.33(a)-(d), (f)-(j)

Nuclear Power Plant Operating License application - technical information

- - - 2,700.0 - $ -

50.33(f)

Financial qualification information as requested by the Commission 104.0 - - 3,580.0 - $ -

50.34 NPUF Construction Permit application -

general information (PSAR)

- - - 14,000.0 - $ -

50.34 NPUF Operating License application -

technical information (FSAR)

- - - 7,000.0 - $ -

50.34 Nuclear Power Plant Construction Permit application - general information (PSAR)

- - - 90,000.0 - $ -

50.34 Nuclear Power Plant Operating License application - technical information (FSAR)

- - - 40,000.0 - $ -

50.54(bb)

Decommissioned plants submit program for managing and funding irradiated fuel following permanent cessation of operation of the reactor

- - - 250.0 - $ -

50.59(c), 50.90, 50.91(a), (b)

License Amendments 159.0 6.0 954.0 313.0 298,602.0 $ 83,309,958 50.59(c), 50.90, 50.91(a), (b)

License Amendments - Topical Reports 15.0 1.0 15.0 400.0 6,000.0 $ 1,674,000 50.74 Notification within 30 days of a change in status of a licensed reactor operator or senior operator.

201.0 1.0 201.0 1.0 201.0 $ 56,079 50.80(b)

License Transfers 8.0 1.0 8.0 540.0 4,320.0 $ 1,205,280 50.36,50.36A, 50.36B &

Appendix I Technical Specifications 159.0 5.0 795.0 168.0 133,560.0 $ 37,263,240 50.36,50.36A, 50.36B, 50.36C &

Appendix I Technical Specifications - Risk Informed Completion Times (RICT) Program 5.0 1.0 5.0 60.0 300.0 $ 83,700 ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements) 2

Supporting Statement Section Rule Section Description Number of Respondents Responses per Respondent Total Number of Responses Burden per

Response

Total Annual Burden Hours Total Cost @

$279/Hour ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements) 50.34(c) & (d) & 50.54(p) -

Burden covered under 10 CFR 73.67 approved by OMB under Clearance No. 3150-0151 Physical security and safeguards contingency plans (operating power reactors)

- 1.0 - 29.0 - $ -

50.34(c) & (d) & 50.54(p) -

Burden covered under 10 CFR 73.67 approved by OMB under Clearance No. 3150-0151 Physical security and safeguards contingency plans (decommissioned/shutdown power reactors)

- - - 29.0 - $ -

50.34(c) & (d) & 50.54(p) -

Burden covered under 10 CFR 73.67 approved by OMB under Clearance No. 3150-0151 Physical security and safeguards contingency plans (nonpower reactors)

- 1.0 - 29.0 - $ -

50.35(b)

Periodic reports of the progress and results of research and development programs designed to resolve safety questions

- - - 100.0 - $ -

50.54(w)(3)

Annual report on the source of property and damage insurance 113.0 1.0 113.0 4.0 452.0 $ 126,108 10 CFR 50.54(w)(4)

Cleanup plan outlining the steps and costs needed to complete decontamination and cleanup following an accident

- - - 2,000.0 - $ -

50.33(k)

Contents of applications 1.0 1.0 1.0 200.0 200.0 $ 55,800 50.75 Decommissioning planning 89.0 1.0 89.0 5.0 445.0 $ 124,155 50.82 Termination of license 5.0 1.0 5.0 680.0 3,400.0 $ 948,600 50.71(b)& Appendix C Annual financial reporting 53.0 1.0 53.0 1.0 53.0 $ 14,787 50.76 Submission of financial qualifications information within 75 days prior to ceasing to be an electric utility

- - - 33.0 - $ -

50.71(e)

Updated FSAR (operating reactors) 56.0 1.0 56.0 900.0 50,400.0 $ 14,061,600 50.71(e)

Updated FSAR (power reactors that have ceased operating) 16.0 1.0 16.0 225.0 3,600.0 $ 1,004,400 50.72 & 50.54(z)

Notification of Events 91.0 2.0 182.0 1.00 182.0 $ 50,778 10 CFR Part 50, Appendix E, Paragraph E.9.d Daily testing of the ENS system by the HOO, submission of voluntary reactor status and grid information 91.0 365.0 33,215.0 - 2,848.0 $ 794,592 Appendix E, VI.1 Periodic Testing Quarterly testing of Emergency Response Data System 91.0 4.0 364.0 2.0 728.0 $ 203,112 Appendix E, VI.3 a&b HW/SW changes affecting ERDS DPLs and communication 9.0 1.0 9.0 4.0 36.0 $ 10,044 4

3

Supporting Statement Section Rule Section Description Number of Respondents Responses per Respondent Total Number of Responses Burden per

Response

Total Annual Burden Hours Total Cost @

$279/Hour ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements) 50.72(a)

Emergency Response Data System reports 7.0 1.0 7.0 4.0 28.0 $ 7,812 50.70 Team Inspections 59.0 1.0 59.0 160.0 9,440.0 $ 2,633,760 50.70 Other Inspections (e.g. Resident, Supplemental, Special and Infrequently Performed, Temporary Instructions, and Reactive) 59.0 1.0 59.0 45.0 2,655.0 $ 740,745 50.69(g)

Submission of event report to submit a licensee event report for any event or condition that would have prevented RISC-1 and RISC-2 structures, systems, and components from performing a safety-significant function 10.0 1.0 10.0 600.0 6,000.0 $ 1,674,000 50.54(cc)

Bankruptcy Notifications

- - - 1.0 - $ -

50.55(e) 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> notification (Design and Construction Deficiencies) 2.0 1.0 2.0 10.0 20.0 $ 5,580 50.55(e) 30-day reports (Design and Construction Deficiencies) 2.0 1.0 2.0 70.0 140.0 $ 39,060 50.55(f), Appendices A & B Quality Assurance reports (operating reactors) 89.0 1.0 89.0 160.0 14,240.0 $ 3,972,960 50.55(f), Appendices A & B Quality Assurance reports (reactors under construction) 2.0 1.0 2.0 160.0 320.0 $ 89,280 50.55(f), Appendices A & B Quality Assurance reports (Part 52 applicants) 2.0 1.0 2.0 667.0 1,334.0 $ 372,186 50.55a(z)

Alternatives submitted by COLs 2.0 1.0 2.0 230.0 460.0 $ 128,340 50.55a(z)

Alternatives submitted by Power Reactors 89.0 3.0 267.0 230.0 61,410.0 $ 17,133,390 50.55a(z)

Alternatives submitted for I&C 0.0 0.0 230.0 50.55a(z)(1) and 50.55a(z)(2) -

Burden covered under 50.55a(z)(1) and 50.55a(z)(2),

approved by OMB under Clearance No. 3150-0244 Request for Alternatives (Online portal) 89.0 2.4 218.0 230.0 50,140.0 $ 13,989,060 50.55a(f)(5) and (g)(5)

Relief requests (traditional submission) 89.0 2.0 178.0 230.0 40,940.0 $ 11,422,260 50.55a Codes and Standards 89.0 2.0 178.0 58.0 10,324.0 $ 2,880,396 5

Supporting Statement Section Rule Section Description Number of Respondents Responses per Respondent Total Number of Responses Burden per

Response

Total Annual Burden Hours Total Cost @

$279/Hour ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements) 50.59(c) and (d)

Power reactors - Reports changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each 113.0 1.0 113.0 380.0 42,940.0 $ 11,980,260 50.59(c) and d Non-power reactors - Reports changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each 35.0 1.0 35.0 120.0 4,200.0 $ 1,171,800 Appendices G & H, 50.60 Fracture Toughness 22.0 1.0 22.0 102.0 2,244.0 $ 626,076 50.61 Pressurized Thermal Shock 4.0 1.0 4.0 24.0 96.0 $ 26,784 50.64(c)(1)

Unique purpose application for highly enriched uranium 2.0 1.0 2.0 10.0 20.0 $ 5,580 50.64(c)(2)(i)

Highly enriched uranium - updated documentation 4.0 1.0 4.0 10.0 40.0 $ 11,160 50.64(c)(2)(ii)

Highly enriched uranium - updated documentation 4.0 1.0 4.0 10.0 40.0 $ 11,160 50.64(c)(2)(iii)

Highly enriched uranium, safety analyses 3.0 1.0 3.0 333.3 1,000.0 $ 279,000 50.66 Thermal Annealing

- - - 6,400.0 - $ -

6 50.12 Exemptions 30.0 1.0 30.0 360.0 10,800.0 $ 3,013,200 50.34(i)

Part 50 applicants provide plans for implementing rule requirements in application

- - - 300.0 - $ -

50.44(c)

Hydrogen Control Requirements

- - - 203.0 - $ -

50.46(a)(3)(ii)

Annual report of changes to change evaluation model 104.0 1.0 104.0 20.0 2,080.0 580,320.0 50.46(a)(3)(ii) 30-day report of significant change or error to evaluation model 52.0 1.0 52.0 20.0 1,040.0 290,160.0 50.46, Appendix K Realistic evaluation model submittal 1.0 1.0 1.0 2,500.0 2,500.0 697,500.0 50.46, Appendix K Modified evaluation model submittal 0.6 1.0 0.6 1,750.0 1,050.0 292,950.0 50.46, Appendix K Schedule for completing actions associated with 10 CFR 50 Appendix K and 10 CFR 50.46(b) 1.6 1.0 1.6 16.0 25.6 7,142.4 Appendix K, 50.46 ECCS 104.0 2.0 208.0 40.0 8,320.0 2,321,280.0

Supporting Statement Section Rule Section Description Number of Respondents Responses per Respondent Total Number of Responses Burden per

Response

Total Annual Burden Hours Total Cost @

$279/Hour ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements) 50.47, 50.54(q & t), Appendix E Emergency plans (operating power reactors) 57.0 25.0 1,425.0 81.0 115,425.0 $ 32,203,575 50.54(q)(4)

Submission of proposed changes that would reduce the effective of approved emergency plans (operating power reactors) 12.0 1.0 12.0 40.0 480.0 $ 133,920 App. E.IV.F.2.a,b Participation Exercise - exercise scenario submission 28.5 1.0 28.5 40.0 1,140.0 $ 318,060 50.47, 50.54(q & t), Appendix E Emergency plans (operating non-power reactors) 31.0 10.0 310.0 2.0 620.0 $ 172,980 50.47, 50.54(q & t), Appendix E Emergency plans (power reactor sites being decommissioned) 24.0 15.0 360.0 34.0 12,240.0 $ 3,414,960 50.47, 50.54(q & t), Appendix E Emergency plans (non-power reactors being decommissioned and possession only) 4.0 5.0 20.0 1.0 20.0 $ 5,580 50.47, 50.54(q & t), Appendix E Emergency Planning 116.0 18.0 2,088.0 60.0 125,280.0 $ 34,953,120 Appendix S and 50.54(ff)

Earthquake Engineering Criteria, DC applicants 1.0 1.0 1.0 155,000.0 155,000.0 $ 43,245,000 Appendix S and 50.54(ff)

Earthquake Engineering Criteria, Operating Reactors 5.0 1.0 5.0 900.0 4,500.0 $ 1,255,500 Total 159 41,990 1,194,176

$333,174,992 7

Supporting Statement Section Section Description Number of Recordkeepers Hours per Recordkeeper Total Annual Burden Hours Annual Cost @

$279/hr 50.33(a)-(d),(j)

Early Site Permits (records)

- 13.0 - $ -

50.33(a)-(d)

Standard Design Certification (records) 1.0 16.5 16.5 $ 4,604 50.33(a)-(d), (g)

Combined OL (records) 7.0 99.0 693.0 $ 193,347 50.33(a)-(d), (j)

Standard Design Approval (records) 3.0 16.5 49.5 $ 13,811 50.33(a)-(d), (j)

Manfacturing License (records)

- 16.5 - $ -

50.33 NPUF Construction Permit (records) 7.0 99.0 693.0 $ 193,347 50.33 NPUF Operating License (records) 1.0 99.0 99.0 $ 27,621 50.33 Nuclear Power Plant Construction Permit (records) 5.0 99.0 495.0 $ 138,105 50.33 Nuclear Power Plant Operating License (records) 1.0 99.0 99.0 $ 27,621 50.59(c), 50.90, 50.91(a), (b)

Records License Amendments 159.0 192.0 30,528.0 $ 8,517,312 50.74 - Burden covered under 10 CFR 55.22 approved by OMB under Clearance No. 3150-0024 Records of change in status of a licensed reactor operator or senior operator 50.80(b)

License Transfers 8.0 60.0 480.0 $ 133,920 50.36,50.36A, 50.36B & Appendix I Technical Specifications (Operating power reactor) 89.0 2080.0 185,120.0 $ 51,648,480 50.36,50.36A, 50.36B & Appendix I Technical Specifications (operating NPUFs) 31.0 80.0 2,480.0 $ 691,920 50.36,50.36A, 50.36B & Appendix I Technical Specifications (shutdown power reactor) 24.0 208.0 4,992.0 $ 1,392,768 3

50.75 Decommissioning planning 144.0 73.0 10,512.0 $ 2,932,848 50.71(b)& Appendix C Financial records 23.0 0.1 2.3 $ 642 50.71(e)

Records for updated FSAR (operating reactors) 56.0 100.0 5,600.0 $ 1,562,400 50.71(e)

Records for updated FSAR (power reactors that have ceased operating) 16.0 25.0 400.0 $ 111,600 50.72 & 50.54(z)

Notification of Events 91.0 0.8 72.8 $ 20,311 Appendix E, VI.1 Periodic Testing Quarterly testing of Emergency Response Data System 91.0 0.2 18.2 $ 5,078 Appendix E, VI.3 a&b HW/SW changes affecting ERDS DPLs and communication 9.0 1.2 10.8 $ 3,013 50.72(a)

Emergency Data Response System 7.0 0.4 2.8 $ 781 50.69 Maintain processes to control the inspection, testing, and corrective actions for structures, systems, and components, other SSC records 10.0 833.0 8,330.0 $ 2,324,070 50.69 (one-time implementation requirements)

After approval of application, perform evaluations of the significance of SSC functions (implementation for the alternative requirements of 10 CFR 50.69 - voluntary) 16.0 920.0 14,720.0 $ 4,106,880 50.54(hh)(1)

Procedures for aircraft threat 57.0 40.0 2,280.0 $ 636,120 50.55(e)

Retention of evaluations, 50.55(e)(9)(ii) (Design and Construction Deficiencies) 25.0 2.0 50.0 $ 13,950 50.55(f), Appendices A & B Quality Assurance records (operating reactors and permit holders) 104.0 10,000.0 1,040,000.0 $ 290,160,000 ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements) 4 2

Supporting Statement Section Section Description Number of Recordkeepers Hours per Recordkeeper Total Annual Burden Hours Annual Cost @

$279/hr ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements) 50.55(f), Appendices A & B Quality Assurance records (shutdown reactors) 24.0 2,500.0 60,000.0 $ 16,740,000 50.55a Records related to Codes and Standards 104.0 2,310.0 240,240.0 $ 67,026,960 50.59(c) and d Power reactors - Records of changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each 113.0 80.0 9,040.0 $ 2,522,160 50.59(c) and d Non-power reactors - Records of changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each 35.0 480.0 16,800.0 $ 4,687,200 Appendices G & H, 50.60 Fracture Toughness 22.0 11.0 242.0

$ 67,518 50.61 Pressurized Thermal Shock 4.0 216.0 864.0 $ 241,056 50.65 Maintenance program records for operating plants 89.0 4,315.0 384,035.0 $ 107,145,765 50.65 Maintenance program records for shutdown plans 24.0 128.0 3,072.0 $ 857,088 6

50.12 Exemptions 30.0 40.0 1,200.0 $ 334,800 50.44(c)

Hydrogen Control Requirements 89.0 1.0 89.0 $ 24,831 50.47, 50.54(q & t), Appendix E Emergency Planning Records for Operating Power Reactors 114.0 1,090.0 124,260.0 $ 34,668,540 50.47, 50.54(q & t), Appendix E Emergency Planning Records for Operating Non-Power Reactors 31.0 589.0 18,259.0 $ 5,094,261 50.47, 50.54(q & t), Appendix E Emergency Planning Records for Power Reactor Sites Being Decommissioned 24.0 256.0 6,144.0 $ 1,714,176 50.47, 50.54(q & t), Appendix E Emergency Planning Records for Non-Power Reactors Being Decommissioned and Possession Only 4.0 4.0 16.0 $ 4,464 50.48 (c)

One-time transition of records for fire protection to NFPA 805 50.48, Appendix R Fire Protection plan records 113.0 84.0 9,492.0 $ 2,648,268 50.49(a),(d),(f)

One-time environmental qualification (program establishment, qualification of equipment), annualized 8.0 793.3 6,346.4 $ 1,770,646 50.49(d),(f),(j)

Environmental Qualification 89.0 2,080.0 185,120.0 $ 51,648,480 5

7

Supporting Statement Section Section Description Number of Recordkeepers Hours per Recordkeeper Total Annual Burden Hours Annual Cost @

$279/hr ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements) 50.120(b)

Training & Qualification Records for Operating Reactors 61.0 780.0 47,580.0 $ 13,274,820 50.120(b)

Training & Qualification Records for Applicants

- 1,440.0 - $ -

Appendix J Development and Ongoing Analyses & Maintenance of Performance Based Leakage Testing Program 159.0 60.0 9,540.0 $ 2,661,660 Appendix S and 50.54(ff)

Earthquake Engineering Criteria, Operating Reactors 5.0 100.0 500.0 $ 139,500 Appendix S and 50.54(ff)

Earthquake Engineering Criteria, DC applicants 1.0 100.0 100.0 $ 27,900 Appendix S IV(a)(3)

Plant inspection and documentation of inspection following seismic event 5.0 320.0 1,600.0 $ 446,400 Total 159 2,432,283.3 $ 678,607,040.70

Supporting Statement Section Section Description Number of Respondents Responses per Respondent Total Number of Responses Burden per

Response

Total Annual Burden Hours Cost @

$278/Hour 5

50.55a Submission to ASME of Owner's certificate, AIA agreement (III/NCA-3230) 2 1.0 2 100.0 200.0 $ 55,800 TOTAL 2

2 200.0 $ 55,800 ANNUAL 3rd PARTY DISCLOSURES (Recurring Information Collection Requirements)

Total Burden and Responses Section 3 Hours Responses Hours Responses Reporting 443,732 1,891 Reporting 4,045 95 Recordkeeping 225745 159 Recordkeeping 10,512 144 Third Party Disclosur 0

0 TOTAL 14,557 239 TOTAL 669477.0 2049.6 Item #13, Other Costs Section 3 Recordkeeping

$1,173 Recordkeeping 25,193 TOTAL

$1,173 TOTAL 25,193 Hours Cost @ $279/hr Hours Cost @ $279/hr Staff time 1526

$425,754 Staff time 101953 28,444,887 Total Burden and Responses Section 5 Hours Responses Hours Responses Reporting 75,970 34,030 Reporting 229,908 1,127 Recordkeeping 29,157 91 Recordkeeping 1,756,623 113 TOTAL 105,127 34,121 Third Party Disclosure 200 2

TOTAL 1,986,731 1,242 Item #13, Other Costs Section 4 Recordkeeping

$3,254 Item #13, Other Costs Section 5 TOTAL

$3,254 Recordkeeping

$196,039 TOTAL

$196,039 Item #14, Costs to the Federal Government, Section 4 Hours Cost @ $279/hr Staff time 41295

$11,521,305 Hours Cost @ $279/hr Staff time 73,115

$20,399,085 Total Burden and Responses Section 4 Total Burden and Responses Section 2 Item #13, Other Costs Section 2 Item #14, Costs to the Federal Government, Section 2 Item #14, Costs to the Federal Government, Section 3 Item #14, Costs to the Federal Government, Section 5

Total Burden and Responses Section 6 Hours Responses Hours Responses Reporting 10,800 30 Reporting 429,721 4,617 Recordkeeping 1,200 30 Recordkeeping 409,046 159 TOTAL 12,000 60 TOTAL 838,767 4,776 Item #13, Other Costs Section 6 Item #13, Other Costs Section 7 Recordkeeping

$134 Recordkeeping

$45,650 TOTAL

$134 TOTAL

$45,650 Item #14, Costs to the Federal Government, Section 6 Item #14, Costs to the Federal Government, Section 7 Hours Cost @ $278/hr Hours Cost @ $279/hr Staff time 2,250

$627,750 Staff time 20,275

$5,656,725 Total Burden and Responses Section 7

HOURS RESPONSES 2021 3,626,659 41,950 Previous 3,710,882 43,767 Delta

-84,223

-1,817

Section Costs 2

$25,193 3

$1,173 4

$3,254 5

$196,039 6

$134 7

$45,650 Total

$271,443 Section Staff Time Hours Cost @ $279/hr 2

101,953

$28,444,887 3

1,526

$425,754 4

41,295

$11,521,305 5

73,115

$20,399,085 6

2,250

$627,750 7

20,275

$5,656,725 Total 240,414

$67,075,506 Section Reporting Recordkeeping 3rd Party Total Cost 2

443,732 225,745 0

669,477

$186,784,083 3

4,045 10,512 0

14,557

$4,061,403 4

75,970 29,157 0

105,127

$29,330,405 5

229,908 1,756,623 200 1,986,731

$554,297,949 6

10,800 1,200 0

12,000

$3,348,000 7

429,721 409,046 0

838,767

$234,015,993 Total 1,194,176 2,432,283 200 3,626,659

$1,011,837,833 Previous total 1,148,086 2,562,696 100 3,710,882.0

$975,961,966 Deltas 46,090

-130,413 100

-84,223

$35,875,867 Item #13, Other Costs Section Item #14, Costs to the Federal Government, Burden Hours

Section Reporting Recordkeeping 3rd Party TOTAL 2

1,891 159 2,050 3

95 144 239 4

34,030 91 34,121 5

1,127 113 2

1,242 6

30 30 60 7

4,617 159 4,776 2021 TOTAL 41,789 159 2

41,950 Previous total 43,617 149 1

43,767 Deltas

-1,828 10 1

-1,817 Responses