ML20264C245
From kanterella
Jump to navigation
Jump to search
ML20264C245 | |
Person / Time | |
---|---|
Site: | Marble Hill |
Issue date: | 09/11/1981 |
From: | SARGENT & LUNDY, INC. |
To: | PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
Shared Package | |
ML20069J547 | List:
|
References | |
CON-4808, CON-4808-00 M-364, NUDOCS 8305110607 | |
Download: ML20264C245 (1) | |
Similar Documents at Marble Hill | |
---|---|
Category:DRAWINGS
MONTHYEARML20264B4631984-05-16016 May 1984
[Table view]Gen Arr and Piping Storage Area El 397 Ft Radwaste Solidification System, as-built.Rev Date Illegible ML20263B8871983-11-23023 November 1983 Containment Building:Jib Crane for Removal of Seals Loop 3 & 4. Sheet 24 ML20263C4991983-10-0505 October 1983 Pumphouse Area Grading & Drainage Plan ML20263B8501983-09-26026 September 1983 Crane/Trolley Beam Locn Floor Plan at El 346 Ft. Sheet 5 ML20263B8531983-09-26026 September 1983 Crane/Trolley Beam Location Radwaste/Serv Bldg Comp. Sheet 6 of 24 ML20263B8661983-09-26026 September 1983 Crane/Trolley Beam Location Mezzanine Floor at El 426 Ft. Sheet 1 ML20263B8791983-09-26026 September 1983 Crane/Trolley Beam Location Floor Plan at El 401 Ft. Sheet 11 of 24 ML20263B8821983-09-26026 September 1983 Crane/Trolley Beam Location Basement Flr at El 346 Ft. Sheet 4 ML20263B8711983-07-0202 July 1983 Crane/Trolley Beam Loc Grade Floor at El 401 Ft. Sheet 2 ML20263B8851983-06-0606 June 1983 Containment Building:Jib Crane for Removal of Seals Loop 1 & 2. Sheet 23 ML20264A6671983-04-21021 April 1983 Response to NRC Question 240.1(2.4.2.3)b(3). No Drawing Date ML20264A6631983-03-15015 March 1983 Transformer Area Grading & Drainage ML20264A6611983-03-15015 March 1983 Power Block Area Grading & Drainage. Sheet 6 ML20264A6591983-03-15015 March 1983 Power Block Area Grading & Drainage. Sheet 5 ML20264A6581983-03-15015 March 1983 Power Block Area Grading & Drainage. Sheet 4 ML20264A6471983-03-15015 March 1983 Power Block Area Grading & Drainage. Sheet 1 ML20264A5811983-03-15015 March 1983 Grading,Roadwork & Drainage. Sheet 3 ML20264A5771983-03-15015 March 1983 Grading,Roadwork & Drainage. Sheet 2 ML20264A5691983-03-15015 March 1983 Grading,Roadwork & Drainage. Sheet 1 ML20264A5531983-03-15015 March 1983 Site Plan. Sheet 1 ML20263B8271983-03-0101 March 1983 Equipment Removal:Main Floor at El 451 Ft. Sheet 1 ML20263B8301983-03-0101 March 1983 Mezzanine Floor El 426 Ft. Sheet 2 ML20263B8331983-03-0101 March 1983 Equipment Removal:Grade Floor at El 401 Ft. Sheet 3 ML20263B8351983-03-0101 March 1983 Equipment Removal:Floor Plan at El 383 Ft. Sheet 4 ML20263B8381983-03-0101 March 1983 Equipment Removal:Basement Floor at El 364 Ft. Sheet 5 ML20263B8401983-03-0101 March 1983 Equipment Removal:Floor Plan at El 346 Ft. Sheet 6 ML20263B8421983-03-0101 March 1983 Equipment Removal:Fuel Handling Building. Sheet 7 ML20263B8451983-03-0101 March 1983 Equipment Removal:Miscellaneous Plans. Sheet 8 ML20263B8481983-03-0101 March 1983 Equipment Removal:Radwaste/Service Bldg Complex. Sheet 14 ML20263B8561983-03-0101 March 1983 Condenser Water Box and Circulating Water Pump Removal Procedure. Sheet 50 ML20263B8611983-03-0101 March 1983 Condenser Water Box Removal Procedure. Sheet 51 ML20264C2521983-02-28028 February 1983 Outdoor Process Piping Systems. Sheet 10 ML20263M7981983-02-24024 February 1983 Process Control Block Diagram. Sheet 40.No Rev Date ML20263M8021983-02-24024 February 1983 Process Control Block Diagram. Sheet 41.No Rev Date ML20263M8061983-02-24024 February 1983 Process Control Block Diag. Sheet 42.No Rev Date ML20263M8101983-02-24024 February 1983 Nuclear Instrumentation Sys Source Range N-31 Functional Block Diagram. Rev Date Illegible ML20263N3091983-02-24024 February 1983 Schematic Diagram Reactor Loop 1D - Hot Leg Stop Valve - 1RC8001D. Rev Date Illegible ML20263M9171983-02-24024 February 1983 Key Diagram 480 V Aux Bldg ESF MCC 132X2 (1AP27E) & 132X2A (1AP27E-A). Rev Date Illegible ML20264B4871983-02-23023 February 1983 Diagram of Diesel Fuel Oil. Sheet 1 ML20264B4941983-02-23023 February 1983 Diagram of Diesel Fuel Oil. Sheet 2 ML20264B5011983-02-23023 February 1983 Diagram of Diesel Fuel Oil. Sheet 3 ML20264B5061983-02-23023 February 1983 Diagram of Diesel Oil and Fuel Oil Supply. Sheet 4 ML20264B6011983-02-0808 February 1983 Diagram of Safety Injection. Sheet 1 ML20264A6681983-02-0404 February 1983 Schematic Diagram:Auxiliary Feedwater Pump 1A-1AF01PA ML20264B4521983-02-0303 February 1983 Diagram of Make-Up Demineralizer System (Wm). Sheet 3 ML20264B4601983-02-0303 February 1983 Diagram of Make-Up Demineralizer System (Wm). Sheet 4 ML20264B4821983-02-0303 February 1983 Diagram of Make-Up Demineralizer System (Wm). Sheet 7 ML20264B5441983-01-19019 January 1983 Diagram of Service Air (Diesel Gen Starting Air). Sheet 7 ML20264B6491983-01-19019 January 1983 Diagram of Fuel Pool Cooling and Clean Up. Sheet 2 ML20264B6751983-01-19019 January 1983 Diagram of Chemical & Volume Control & Boron Thermal Regeneration. Sheet 6 1984-05-16 Category:DRAWINGS-PIPING & INSTRUMENTATION DIAGRAMS-APPLICANT'S MONTHYEARML20263B8561983-03-0101 March 1983
[Table view]Condenser Water Box and Circulating Water Pump Removal Procedure. Sheet 50 ML20263B8611983-03-0101 March 1983 Condenser Water Box Removal Procedure. Sheet 51 ML20264C2521983-02-28028 February 1983 Outdoor Process Piping Systems. Sheet 10 ML20263M7981983-02-24024 February 1983 Process Control Block Diagram. Sheet 40.No Rev Date ML20263M8021983-02-24024 February 1983 Process Control Block Diagram. Sheet 41.No Rev Date ML20263M8061983-02-24024 February 1983 Process Control Block Diag. Sheet 42.No Rev Date ML20263M8101983-02-24024 February 1983 Nuclear Instrumentation Sys Source Range N-31 Functional Block Diagram. Rev Date Illegible ML20264B5061983-02-23023 February 1983 Diagram of Diesel Oil and Fuel Oil Supply. Sheet 4 ML20264B5011983-02-23023 February 1983 Diagram of Diesel Fuel Oil. Sheet 3 ML20264B4941983-02-23023 February 1983 Diagram of Diesel Fuel Oil. Sheet 2 ML20264B4871983-02-23023 February 1983 Diagram of Diesel Fuel Oil. Sheet 1 ML20264B6011983-02-0808 February 1983 Diagram of Safety Injection. Sheet 1 ML20264B4521983-02-0303 February 1983 Diagram of Make-Up Demineralizer System (Wm). Sheet 3 ML20264B4821983-02-0303 February 1983 Diagram of Make-Up Demineralizer System (Wm). Sheet 7 ML20264B4601983-02-0303 February 1983 Diagram of Make-Up Demineralizer System (Wm). Sheet 4 ML20264B8551983-01-19019 January 1983 Diagram of Component Cooling. Sheet 1 ML20264B5441983-01-19019 January 1983 Diagram of Service Air (Diesel Gen Starting Air). Sheet 7 ML20264B6491983-01-19019 January 1983 Diagram of Fuel Pool Cooling and Clean Up. Sheet 2 ML20264B6751983-01-19019 January 1983 Diagram of Chemical & Volume Control & Boron Thermal Regeneration. Sheet 6 ML20264B1751983-01-14014 January 1983 Diagram of Waste Disposal Steam Generator Blowdown. Sheet 5 ML20264C2271983-01-13013 January 1983 Diagram of Auxiliary Bldg Chilled Water System (Wo). Sheet 8 ML20264B1611983-01-13013 January 1983 Diagram of Non-Essential Service Water (Aux Service Bldg). Sheet 4 ML20264B6421983-01-13013 January 1983 Diagram of Fuel Pool Cooling and Clean-Up. Sheet 1 ML20264B6641983-01-13013 January 1983 Diagram of Chemical & Volume Control & Boron Thermal Regen. Sheet 4 ML20264B1761983-01-0707 January 1983 Diagram of Waste Disposal Auxiliary Bldg Floor Drains. Sheet 6 ML20264B6851983-01-0707 January 1983 Diagram of Chemical & Volume Control & Boron Thermal Regeneration. Sheet 7 ML20264B1981983-01-0606 January 1983 Diagram of Radwaste Evaporator. Sheet 12C ML20264B2071983-01-0606 January 1983 Diagram of Waste Disposal Turbine Building Floor Drains. Sheet 16 ML20264B2121983-01-0606 January 1983 Diagram of Miscellaneous Sumps and Pumps. Sheet 19 ML20264B2261983-01-0606 January 1983 Diagram of Turbine Bldg Waste Oil Collection System. Sheet 24 ML20264B4281983-01-0606 January 1983 Diagram of Turbine Bldg Equipment/Floor Drain Coalescers. Sheet 37 ML20264B4671983-01-0606 January 1983 Diagram of Make-Up Demineralizer System (Wm). Sheet 5 ML20264B1681982-12-30030 December 1982 Diagram of Waste Disposal Blowdown Mixed Bed Demineralizer Oa. Sheet 3A ML20264B1691982-12-30030 December 1982 Diagram of Waste Disposal Blowdown Mixed Bed Demineralizer Ob. Sheet 3B ML20264B1891982-12-30030 December 1982 Diagram of Radwaste Evaporator. Sheet 11A ML20264B1951982-12-30030 December 1982 Diagram of Radwaste Evaporator. Sheet 12a ML20264B2021982-12-30030 December 1982 Diagram of Radwaste Evaporator. Sheet 13A ML20264B2141982-12-30030 December 1982 Diagram of Waste Disposal Blowdown Mixed Bed Demineralizer Oc. Sheet 20A ML20264B2161982-12-30030 December 1982 Diagram of Waste Disposal Blowdown Mixed Bed Demineralizer Od. Sheet 20B ML20264A8661982-12-30030 December 1982 Diagram of Essential Service Water. Sheet 4 ML20264A8641982-12-30030 December 1982 Diagram of Essential Service Water. Sheet 3 ML20264A8621982-12-30030 December 1982 Diagram of Essential Service Water. Sheet 2 ML20264A8611982-12-30030 December 1982 Diagram of Essential Service Water. Sheet 1 ML20264B8621982-12-23023 December 1982 Diagram of Component Cooling. Sheet 4 ML20264C2201982-12-23023 December 1982 Diagram of Containment Chilled Water System - Wo. Sheet 5 ML20264B8531982-12-23023 December 1982 Diagram of Boric Acid Processing. Sheet 7 ML20264B8511982-12-23023 December 1982 Diagram - Boric Acid Processing (Recycle Evaporator Package Ob). Sheet 6 ML20264B8441982-12-23023 December 1982 Diagram of Boric Acid Processing. Sheet 5 ML20264B7081982-12-23023 December 1982 Diagram of Boric Acid Processing. Sheet 2 ML20264B7061982-12-23023 December 1982 Diagram of Boric Acid Processing. Sheet 1 1983-03-01 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20264C245&oldid=3123883"