ML20263B979
From kanterella
Jump to navigation
Jump to search
ML20263B979 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 07/21/1983 |
From: | TEXAS UTILITIES SERVICES, INC. |
To: | |
Shared Package | |
ML20081M527 | List:
|
References | |
2323-M1-0260--4, 2323-M1-260--4, NUDOCS 8312010468 | |
Download: ML20263B979 (1) | |
Similar Documents at Comanche Peak | |
---|---|
Category:DRAWINGS
MONTHYEARML20260B5281989-06-0707 June 1989
[Table view]80 a 30 Rectifier. Sheet 3.No Drawing Date ML20260B5201989-06-0707 June 1989 7.5 Kva Fixed Frequency Inverter Outline & External Connections. Sheet 1.No Drawing Date ML20260B5241989-06-0707 June 1989 7.5 Kva FF Static Inverter System Block Diagram Operating Instructions. Sheet 2.No Drawing Date ML20260B5151989-06-0707 June 1989 7.5 Kva 118 Vac 10 60 Hz Fixed Frequency Invertor. Sheet 4.Rev Date Illegible ML20265B0901987-11-17017 November 1987 Moment Limiting Component Support Structures. Sheet 1. Rev Date Illegible. Actual Rev STATUS:CP-2 ML20266H1131986-10-0303 October 1986 Termination Rack CPI-ECPRTC-41 Interconnection Diagram. Rev Date Illegible. Actual Rev STATUS:CP-4 ML20266H1701986-10-0303 October 1986 Termination Rack CPI-ECPRTC-42 Interconnection Diagram. Rev Date Illegible. Actual Rev STATUS:CP-3 ML20266H1831986-07-18018 July 1986 Solid State Protection System Train B Output Cabinet Number 1 Interconnection Diagram. Actual Rev STATUS:CP-4 ML20266E3111986-05-21021 May 1986 Seismic Tube Support Span Lengths. Rev Date Incomplete ML20266E1091986-05-19019 May 1986 FB Spent Fuel Pool Liner Dets. Sheet 1 ML20266E1181986-05-19019 May 1986 FB Spent Fuel Pool Liner Dets. Sheet 2.Rev Date Illegible ML20266E1041986-05-19019 May 1986 FB Spent Fuel Pool Liner Dets. Sheet 3.Rev Date Illegible ML20266E1281986-05-19019 May 1986 FB Spent Fuel Pool Liner Dets. Sheet 4.Rev Date Illegible ML20266E0941986-05-19019 May 1986 Primary Plant Fuel Building Floor Plan at El 838 Ft 9 Inches & 841 Ft. Rev Date Illegible ML20266E1381986-05-19019 May 1986 Reactor Bldg Electric Penetration Area Cable Tray Support Plan ML20266E1431986-05-19019 May 1986 Cable Tray Support. Sheet 9.Rev Date Illegible ML20266E0581986-05-19019 May 1986 Primary Plant Auxiliary & Electrical Control Building Floor Plan,El 778 Ft & 790 Ft 6 Inches. Rev Date Illegible ML20266H1081985-07-26026 July 1985 BOP Aux Relay Rack 2 CPI-ECPRCR-04 External Connection Diagram. Actual Rev STATUS:CP-7 ML20266H1761985-07-23023 July 1985 Main Control Board CPI-ECPRCB-03 Interconnection Diagram. Actual Rev STATUS:CP-6 ML20266H1591985-07-0808 July 1985 Solid State System Train a Output Cabinet 2 Interconnection Diagram. Actual Rev STATUS:CP-1 ML20266H1481985-04-25025 April 1985 Solid State Safeguards Sequencer Cabinet a Interconnection Diagram Tag CPI-ECPRCCR-01. Actual Rev STATUS:CP-3 ML20266H0951985-04-0606 April 1985 Voided BOP Aux Relay Rack 2 CPI-ECPRCR-04 External Connection Diagram. Actual Rev STATUS:CP-6 ML20266E0391984-09-19019 September 1984 Cable Tray Support. Sheet 1. Actual Rev STATUS:CP-3 ML20266E3021984-09-17017 September 1984 Instrument Tabulation Sheet. Sheet 3 of 5. Actual Rev STATUS:CP-1 ML20264D7831984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 Miscellaneous Plans & Details. Actual Rev STATUS:CP-1 ML20264D7941984-08-15015 August 1984 Fire Hazard Analysis Building Cross-Section D-D. Actual Rev STATUS:CP-1 ML20264D7801984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 Fin Fl @ El 803 Ft & 810 Ft 6 Inches. Actual Rev STATUS:CP-1 ML20264D7821984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 Fl Plan @ El 830 Ft. Actual Rev STATUS:CP-1 ML20264D7581984-08-15015 August 1984 Fire Hazard Analysis Primary Plant Units 1/2 Roof Plan & Details. Actual Rev STATUS:CP-1 ML20264D8001984-08-15015 August 1984 Fire Hazard Analysis Maintenance Building Fl Plans & Refl Clg Plan. Actual Rev STATUS:CP-1 ML20264D8051984-08-15015 August 1984 Fire Hazard Analysis Circulating Water Intake Struct Plan @ El 795 Ft 9 Inches. Actual Rev STATUS:CP-1 ML20264D8141984-08-15015 August 1984 Tabulations of Fire Hazards. Sheet 3. Actual Rev STATUS:CP-1 ML20264D7911984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 & 2 Miscellaneous Plans & Details. Actual Rev STATUS:CP-1 ML20264D7711984-08-15015 August 1984 Fire Hazard Analysis Elec & Control Bldg Plans & Details. Actual Rev STATUS:CP-1 ML20264D8181984-08-15015 August 1984 Tabulations of Fire Hazards. Sheet 5. Actual Rev STATUS:CP-1 ML20264D8161984-08-15015 August 1984 Tabulations of Fire Hazards. Sheet 4. Actual Rev STATUS:CP-1 ML20264D7921984-08-15015 August 1984 Fire Hazard Analysis Building Cross-Section A-A,B-B. Actual Rev STATUS:CP-1 ML20264D7721984-08-15015 August 1984 Fire Hazard Analysis Fuel Bldg Fl Plan @ El 810 Ft 6 Inches & 803 Ft 8 Inches. Actual Rev STATUS:CP-1 ML20264D8111984-08-15015 August 1984 Tabulations of Fire Hazards. Sheet 1. Actual Rev STATUS:CP-1 ML20264D7741984-08-15015 August 1984 Fire Hazard Analysis Fuel Bldg Fl Plan @ El 838 Ft 9 Inches & 841 Ft. Actual Rev STATUS:CP-1 ML20264D8131984-08-15015 August 1984 Tabulations of Fire Hazards. Sheet 2. Actual Rev STATUS:CP-1 ML20264D7601984-08-15015 August 1984 Fire Hazard Analysis Auxiliary and Electrical Control Bldg El 778 Ft/790 Ft 6 Inches. Actual Rev STATUS:CP-1 ML20264D7621984-08-15015 August 1984 Fire Hazard Analysis Auxiliary and Elec Control Bldg El 807 Ft & 810 Ft 6 Inches. Actual Rev STATUS:CP-1 ML20264D7631984-08-15015 August 1984 Fire Hazard Analysis Auxiliary and Elec Control Bldg Fl Plan El 830 Ft/831 Ft 6 Inches. Actual Rev STATUS:CP-1 ML20264D8071984-08-15015 August 1984 Fire Hazard Analysis Switchyard Relay House Fl Plans,Elevs & Sect. Actual Rev STATUS:CP-1 ML20264D7851984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 & 2 Miscellaneous Plans. Actual Rev STATUS:CP-1 ML20264D7671984-08-15015 August 1984 Fire Hazard Analysis Auxiliary Bldg Part Plans @ El 842 Ft/873 Ft 6 Inches/886 Ft 6 Inches. Actual Rev STATUS:CP-1 ML20264D8091984-08-15015 August 1984 Fire Hazard Analysis Primary Access Point Guard House. Actual Rev STATUS:CP-1 ML20264D7781984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 Fl Plan @ El 778 Ft. Actual Rev STATUS:CP-1 ML20264D7891984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 & 2 Misc Plans. Actual Rev STATUS:CP-1 1989-06-07 Category:DRAWINGS-PIPING & INSTRUMENTATION DIAGRAMS-APPLICANT'S MONTHYEARML20266E3111986-05-21021 May 1986
[Table view]Seismic Tube Support Span Lengths. Rev Date Incomplete ML20266E1091986-05-19019 May 1986 FB Spent Fuel Pool Liner Dets. Sheet 1 ML20266E1041986-05-19019 May 1986 FB Spent Fuel Pool Liner Dets. Sheet 3.Rev Date Illegible ML20266E1181986-05-19019 May 1986 FB Spent Fuel Pool Liner Dets. Sheet 2.Rev Date Illegible ML20266E1281986-05-19019 May 1986 FB Spent Fuel Pool Liner Dets. Sheet 4.Rev Date Illegible ML20266E1431986-05-19019 May 1986 Cable Tray Support. Sheet 9.Rev Date Illegible ML20266E0391984-09-19019 September 1984 Cable Tray Support. Sheet 1. Actual Rev STATUS:CP-3 ML20260G0991984-07-20020 July 1984 Uninterruptible Power Sys & Distribution Room Air Conditioning. Sheet 1 ML20266E0841984-07-11011 July 1984 Safety Injection ML20264B9291984-06-14014 June 1984 Flow Diagram:Demineralized and Reactor Make-Up Water. Sheet 1 of 2.Rev Date Illegible ML20264B9351984-06-14014 June 1984 Flow Diagram:Reactor Coolant System. Sheet 1 of 2. Rev Date Illegible ML20264B9361984-06-14014 June 1984 Flow Diagram:Component Cooling Water System. Sheet 3 of 3. Rev Date Illegible ML20264B8891984-06-14014 June 1984 Flow Diagram:Chemical & Volume Control System (Common). Rev Date Illegible ML20264B9261984-06-14014 June 1984 Flow Diagram:Demineralized and Reactor Make-Up Water. Sheet 2 of 2.Rev Date Illegible ML20264B9111984-06-14014 June 1984 Flow Diagram:Compressed Air System. Rev Date Illegible ML20264B9091984-06-14014 June 1984 Liquid Waste Processing Flow Diagram:Rc Drain Tank Subsystem. Rev Date Illegible ML20264B9061984-06-14014 June 1984 Flow Diagram:Containment Spray System. Rev Date Illegible ML20264B9021984-06-14014 June 1984 Flow Diagram:Residual Heat Removal System. Rev Date Illegible ML20264B9011984-06-14014 June 1984 Flow Diagram:Safety Injection System. Sheet 1 of 3.Rev Date Illegible ML20264B8991984-06-14014 June 1984 Flow Diagram:Safety Injection System. Sheet 2 of 3.Rev Date Illegible ML20264B8971984-06-14014 June 1984 Flow Diagram:Chemical & Volume Control System. Sheet 1 of 4.Rev Date Illegible ML20264B8961984-06-14014 June 1984 Flow Diagram:Chemical & Volume Control System. Sheet 2 of 4.Rev Date Illegible ML20264B8931984-06-14014 June 1984 Flow Diagram:Chemical & Volume Control System. Sheet 3 of 4.Rev Date Illegible ML20264B8911984-06-14014 June 1984 Flow Diagram:Chemical & Volume Control System. Sheet 4 of 4.Rev Date Illegible ML20264B8791984-06-14014 June 1984 Flow Diagram:Ventilation Containment. Sheet 2.Rev Date Illegible ML20264B8691984-06-14014 June 1984 Flow Diagram:Safety Injection System. Sheet 3 of 3.Rev Date Illegible ML20264B9421984-06-14014 June 1984 Flow Diagram:Process Sampling System. Rev Date Illegible ML20264B9441984-06-14014 June 1984 Flow Diagram:Station Service Water System. Sheet 1 of 2. Rev Date Illegible ML20264B9461984-06-14014 June 1984 Flow Diagram:Station Service Water System. Sheet 2 of 2. Rev Date Illegible ML20264B9481984-06-14014 June 1984 Flow Diagram:Auxiliary Feedwater System. Rev Date Illegible ML20266E0751984-05-30030 May 1984 Cable Room & Aux Bldg Cable Tray Support Plan,Elev 807 Ft. Sheet 1 of 3 ML20266E1711984-05-0909 May 1984 Control Room & Aux Bldg Cable Tray Support Plan,El 830 Ft & 831 Ft 6 Inches ML20262E3301984-01-14014 January 1984 Oil Spillage Protection Sys Tank - Vertical ML20266E1801983-12-0909 December 1983 Reactor Bldg Cable Tray Support Plan ML20265B0821983-11-22022 November 1983 Containment Spray ML20263C0011983-09-0202 September 1983 Flow Diagram:Containment Building Unit 1 Fire Protection ML20263B9991983-09-0202 September 1983 Flow Diagram:Spent Fuel Pool Cooling and Clean-up System ML20263B9911983-09-0202 September 1983 Flow Diagram:Chemical & Volume Control System. Sheet 3 of 4 ML20263B9541983-09-0202 September 1983 Flow Diagram:Component Cooling Water System. Sheet 3 of 3 ML20263B9641983-09-0202 September 1983 Flow Diagram:Vents & Drains System Containment Building ML20263B9621983-09-0202 September 1983 Flow Diagram:Demineralized and Reactor Make-up Water. Sheet 2 of 2 ML20263B9591983-09-0202 September 1983 Flow Diagram:Reactor Coolant System. Sheet 2 of 2 ML20263B9561983-09-0202 September 1983 Flow Diagram:Reactor Coolant System. Sheet 1 of 2 ML20263B9411983-07-29029 July 1983 Flow Diagram:Steam Generator Feedwater System ML20263B9391983-07-29029 July 1983 Flow Diagram:Station Service Water System. Sheet 1 of 2 ML20263B9901983-07-28028 July 1983 Flow Diagram:Chemical & Volume Control System. Sheet 1 of 4 ML20263B9461983-07-24024 July 1983 Flow Diagram:Main Steam Reheat & Steam Dump ML20263B9791983-07-21021 July 1983 Flow Diagram:Residual Heat Removal System ML20263B9761983-07-21021 July 1983 Flow Diagram:Containment Spray System ML20263B9511983-07-15015 July 1983 Flow Diagram:Component Cooling Water System. Sheet 2 of 3 1986-05-21 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20263B979&oldid=3130509"