ML20263B015
From kanterella
Jump to navigation
Jump to search
ML20263B015 | |
Person / Time | |
---|---|
Site: | Braidwood ![]() |
Issue date: | 09/18/1978 |
From: | SARGENT & LUNDY, INC. |
To: | COMMONWEALTH EDISON CO. |
Shared Package | |
ML20078G039 | List: |
References | |
CON-4683, CON-4683-00 S-392-BR, NUDOCS 8310110311 | |
Download: ML20263B015 (1) | |
Similar Documents at Braidwood | |
---|---|
Category:DRAWINGS
MONTHYEARML20261M1071991-09-30030 September 1991
[Table view]CE Co Radiological Sampling/Monitoring Location ML20261A0051990-02-15015 February 1990 CE Co Radiological Sampling/Monitoring Location ML20260L3171990-02-0202 February 1990 CE Co Radiological Sampling/Monitoring Location. No Rev Date ML20266H0221986-10-0606 October 1986 ON-SITE Radiological Sampling/Monitoring Location ML17346B3511985-05-31031 May 1985 On-Site Radiological Sampling/Monitoring Location. ML20259E9951984-12-0707 December 1984 Sub-Final Assembly for Emergency Personnel Lock. Rev Date Illegible ML20259F0061984-12-0707 December 1984 Sub-Final Assembly for Personnel Lock. Rev Date Illegible ML20259F0121984-12-0707 December 1984 Equipment Hatch. Rev Date Illegible ML20259F0341984-04-10010 April 1984 Diagram of Feedwater (Main) Byron/Braidwood Stas 1. Actual Rev Status:Ae ML20259D5671984-03-20020 March 1984 Diagram of Feedwater (Main) Byron/Braidwood Sta'S Unit 1. Sheet 1 of 3 ML20263M8871983-12-20020 December 1983 Crane/Trolley Beam Headroom Calculations Floor El 426 Ft & 364 Ft Byron/Braidwood Sta'S Units 1 & 2. Sheet 20 ML20263M9771983-12-20020 December 1983 Trolley Beam Support and Splicing Details Byron/Braidwood Sta'S Unit 1 & 2. Sheet 5 ML20263M9851983-12-20020 December 1983 Special Systems Material Handling Schedule Byron/Braidwood Sta'S Unit 1 & 2. Sheet 2 ML20263M9151983-12-20020 December 1983 Crane/Trolley Beam Headroom Calculations:Mezzanine Floor El 426 Ft Byron/Braidwood Sta'S Units 1 & 2. Sheet 12 ML20263M9331983-12-20020 December 1983 Crane/Trolley Beam Location Grade Floor at El 401 Ft Byron/ Braidwood Sta'S Unit 1 & 2. Sheet 2 ML20263M8631983-12-20020 December 1983 Material & Equipment Handling Schedule Byron/Braidwood Sta'S Unit 1 & 2. Sheet 1 ML20263M8691983-12-20020 December 1983 Crane/Trolley Beam Headroom Calculations Floor at El 401 Ft Byron/Braidwood Sta'S Units 1 & 2. Sheet 26 ML20263M9301983-12-20020 December 1983 Crane/Trolley Beam Location Floor Plan at El 383 Ft Byron/ Braidwood Sta'S Unit 1 & 2. Sheet 3 ML20263M8841983-12-20020 December 1983 Crane/Trolley Beam Headroom Calculations Single Girders and Pts Byron/Braidwood Sta'S Unit 1 & 2. Sheet 21 ML20263M9271983-12-20020 December 1983 Crane/Trolley Beam Location Basement Floor at El 364 Ft Braidwood Sta Unit 1 & 2. Sheet 4 ML20263M9521983-12-20020 December 1983 Crane/Trolley Beam Location Mezzanine Floor at El 426 Ft Byron/Braidwood Sta'S Unit 1 & 2. Sheet 1 ML20259F0311983-11-18018 November 1983 Feedwater ML20263M8751983-11-0707 November 1983 Crane/Trolley Beam Headroom Calculations Jibs and Single Girders Byron/Braidwood Sta'S Units 1 & 2. Sheet 24 ML20259F0201983-10-18018 October 1983 Main Steam ML20263B0101983-10-0606 October 1983 Marked-up Transformer Area Foundations Location Plan. Rev Date Illegible ML20263M9681983-09-21021 September 1983 Crane/Trolley Beam Headroom Calculations Floor El 383 Ft & 364 Ft Byron/Braidwood Sta'S Units 1 & 2. Sheet 15 ML20263M8661983-09-0909 September 1983 Crane/Trolley Beam Headroom Calculations Patented Tracks System Braidwood Sta Unit 1 & 2. Sheet 28 ML20263M8721983-08-0505 August 1983 Crane/Trolley Beam Calculations Volume Reduction Area Byron/Braidwood Stations Units 1 & 2. Sheet 25 ML20263M9791983-06-30030 June 1983 Trolley Beam Support Detail Byron/Braidwood Sta'S Units 1 & 2. Sheet 4 ML20263M9571983-05-23023 May 1983 Equipment Removal:Main Floor at El 451 Ft Byron/Braidwood Sta'S Unit 1 & 2. Sheet 1 ML20263M8571983-05-23023 May 1983 Equipment Removal:Grade Floor at El 401 Ft Byron/Braidwood Sta'S Unit 1 & 2. Sheet 3 ML20263M8451983-05-23023 May 1983 Equipment Removal:Fuel Handling Building Byron/Braidwood Sta'S Unit 1 & 2. Sheet 7 ML20263M8511983-05-23023 May 1983 Equipment Removal:Basement Floor at El 364 Ft Byron/ Braidwood Sta'S Unit 1 & 2. Sheet 5 ML20263M8601983-05-23023 May 1983 Equipment Removal:Mezzanine Floor at El 426 Ft Byron/ Braidwood Sta'S Unit 1 & 2. Sheet 2 ML20263M8431983-05-23023 May 1983 Equipment Removal:Miscellaneous Plans Byron/Braidwood Sta'S Units 1 & 2. Sheet 8 ML20263M8481983-05-23023 May 1983 Equipment Removal:Floor Plan at El 346 Ft Byron/Braidwood Sta'S Unit 1 & 2. Sheet 6 ML20263M8541983-05-23023 May 1983 Equipment Removal:Basement Floor at El 383 Ft Byron/ Braidwood Sta'S Unit 1 & 2. Sheet 4 ML20263M9651983-01-13013 January 1983 Crane/Trolley Beam Headroom Calculations Floor El 364 Ft & 346 Ft Byron/Braidwood Sta'S Units 1 & 2. Sheet 16 ML20263M9211983-01-13013 January 1983 Crane/Trolley Beam Location Floor Plan at El 346 Ft Byron/ Braidwood Sta'S Unit 1 & 2. Sheet 5 ML20263M9121983-01-13013 January 1983 Crane/Trolley Beam Location:Floor Plan at El 401 Ft Byron/ Braidwood Sta'S Units 1 & 2. Sheet 11 ML20263M8811983-01-13013 January 1983 Crane/Trolley Beam Headroom Calculations Jib Cranes Byron/ Braidwood Sta'S Unit 1 & 2. Sheet 22 ML20263M9741983-01-13013 January 1983 Crane/Trolley Beam Headroom Calculations Floor El 426 Ft & 401 Ft Byron/Braidwood Sta'S Units 1 & 2. Sheet 13 ML20263M9091983-01-0505 January 1983 Crane/Trolley Beam Location:River Screen House Braidwood Station Unit 1 & 2. Sheet 10 ML20263M8901983-01-0505 January 1983 Crane/Trolley Beam Headroom Calculations River Screen House Braidwood Station Units 1 & 2. Sheet 19 ML20263M8221982-11-22022 November 1982 Equipment Removal:Radwaste/Service Bldg Partial Plan El 397 Ft Byron/Braidwood Sta'S Unit 1 & 2. Sheet 15 ML20263M8191982-11-22022 November 1982 Equipment Removal Radwaste/Service Bldg Partial Plan El 410 Ft Byron/Braidwood Sta'S Unit 1 & 2. Sheet 16 ML20263M9181982-10-29029 October 1982 Crane/Trolley Beam Location Radwaste/Serv Bldg Comp Byron/ Braidwood Sta'S Units 1 & 2. Sheet 6 ML20262D6461982-09-22022 September 1982 Diagram of Condensate (Make-up and Overflow). Sheet 1 of 7.No Revision Date ML20262D6431982-08-0404 August 1982 Diagram of Auxiliary Feedwater ML20262D6391982-08-0404 August 1982 Diagram of Feedwater (Main). Sheet 1 of 3 1991-09-30 Category:DRAWINGS-STRUCTURAL & CIVIL-APPLICANT'S MONTHYEARML20263B0101983-10-0606 October 1983
[Table view]Marked-up Transformer Area Foundations Location Plan. Rev Date Illegible ML20263B0151978-09-18018 September 1978 Marked-up Transformer Area Foundations Location Plan 1983-10-06 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20263B015&oldid=3131010"