ML20262L290
From kanterella
Jump to navigation
Jump to search
ML20262L290 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 12/05/1980 |
From: | SARGENT & LUNDY, INC. |
To: | DETROIT EDISON CO. |
Shared Package | |
ML20005A814 | List: |
References | |
CON-3988-4, CON-8BPIAO E-727, NUDOCS 8107010338 | |
Download: ML20262L290 (1) | |
Similar Documents at Fermi | |
---|---|
Category:DRAWINGS
MONTHYEARML20266H5661985-11-15015 November 1985
[Table view]Reactor Bldg and Aux Bldg Framing Section 40-40 Lower Unit 2 ML20262G2691985-09-30030 September 1985 Diagram:High Pressure Coolant Injection System (HPCI) - Reactor - Building. Rev Date Illegible ML20262G2761985-09-30030 September 1985 Sump Pump Diagram:Sheet 2 Radwaste System. Rev Date Illegible ML20262G0811985-08-0404 August 1985 Diagram:Standby Gas Treatment and Primary Containment Purge System - Reactor Building ML20262G1401985-07-31031 July 1985 Diagram:Reactor Recirculation System - Nuclear Boiler System Unit No 2 ML20262G1061985-07-31031 July 1985 Emergency Equipment Cooling Water Division I ML20262G1691985-07-30030 July 1985 Diagram:Stand-By-Liquid Control System ML20262G1111985-07-30030 July 1985 Emergency Equipment Cooling Water Division II ML20262G0911985-07-29029 July 1985 P&Id:Diesel Fuel Oil System & Lube Oil System Division II - RHR Complex ML20262G1291985-07-28028 July 1985 Diagram:Torus Water,Management System ML20262G1321985-07-25025 July 1985 Diagram:Nitrogen Inerting and Supply System ML20262G1591985-07-23023 July 1985 Diagram:Residual Heat Removal (RHR) Division I ML20262G1541985-07-23023 July 1985 Diagram:Station Air Risers in Reactor & Auxiliary Buildings ML20262G4521985-07-17017 July 1985 Primary Containment Monitoring System System Diagram Unit 2 ML20262G4451985-07-12012 July 1985 System Diagram:Nuclear Boiler System ML20262G1241985-07-11011 July 1985 System Diagram:Water,Side & Misc Chiller Inst Control Center A/C System Reactor Bldg Unit 2 ML20262G4341985-07-0909 July 1985 Diagram-Demineralized Service Water Risers for Turbine, Radwaste and Reactor Buildings ML20262G2791985-06-30030 June 1985 Diagram:Feedwater System Unit 2 ML20262G1441985-06-24024 June 1985 System Diagram:Nuclear Boiler System ML20262G1191985-06-14014 June 1985 Diagram:Interruptible and Non-Interruptible Control Air Unit 2 ML20262G2721985-06-10010 June 1985 Diagram:Core Spray System - CSS Reactor Bldg ML20262G1731985-06-0505 June 1985 Diag:Control Rod Drive Hydraulic System - Reactor - Building Part 1 of 2 ML20262G2611985-06-0505 June 1985 Diagram:Reactor Core Isolation Cooling System (Rcic) ML20262G4221985-05-31031 May 1985 Diagram-Main and Reheat Steam Systems Unit 2 ML20262G2821985-05-28028 May 1985 Diagram:Station and Control Air Unit 2 ML20262G1351985-05-11011 May 1985 Diagram:Main Steam Isolation Valve Leakage Control System ML20262G1641985-05-10010 May 1985 Diagram:Residual Heat Removal (RHR) Division II ML20262G0691985-05-10010 May 1985 P&Id:Rhr Service Water System Division II RHR Complex ML20261E4971985-04-22022 April 1985 Weldment Assembly 3000 CFM Recirculation Air Filter, as-built.Sheet 2 of 2.No Rev Date ML20261E5021985-04-22022 April 1985 Gasketless Adsorber Assembly 3000 CFM Emergency Make Up Air Filter, as-built.Sheet 2 of 2.No Rev Date ML20261E5091985-04-22022 April 1985 Gasketless Adsorber Assembly 3000 CFM Recirculation Air Filter, as-built.Sheet 2 of 2.No Rev Date ML20261E5061985-04-22022 April 1985 Weldment Assembly 3000 CFM Emergency Make-Up Air Filter, as-built.Sheet 2 of 2.No Rev Date ML20262G1151985-03-26026 March 1985 Diagram:Primary Containment Pneumatic Supply System ML20262G4381985-03-13013 March 1985 Diag:Control Rod Drive Hydraulic System - Reactor Building Part 2 of 2 ML20262G1491985-02-11011 February 1985 Post LOCA Combustible Gas Control System ML20262G0751985-01-31031 January 1985 P&Id:Rhr Service Water,Make-Up,Decant & Overflow Systems Divisions I & II - RHR Complex ML20262G0861985-01-31031 January 1985 P&Id:Rhr Service Water System Division I RHR Complex ML20262G2571984-12-28028 December 1984 Diagram:Reactor Core Isolation Cooling System (RCIC) Barometric Condenser ML20262G1011984-12-26026 December 1984 P&Id:Diesel Generator System Division I RHR Complex ML20262G0971984-12-26026 December 1984 P&Id:Diesel Generator System Division II RHR Complex ML20262G2651984-12-18018 December 1984 Diagram:High Pressure Coolant Injection System Barometric Condenser (HPCI) Reactor Building ML20262G2211984-12-10010 December 1984 Diagram:Reactor Water Clean-Up Reactor Building ML20262G4271984-12-0707 December 1984 Sample Line Tie-In and Return Diagram:Post Accident Sampling System ML20262G2191984-12-0707 December 1984 Diagram:Fuel Pool Cooling & Clean Up System ML20262G0931984-11-21021 November 1984 P&Id:Diesel Fuel Oil System & Lube Oil System Division I - RHR Complex ML20262G4491984-11-16016 November 1984 Flow Diagram:Reactor & Auxiliary Building Ventilation System Unit 2 ML20266H5921984-10-29029 October 1984 General Plan ML20262G4411983-12-10010 December 1983 Schematic Diagram:Traversing In-Core Probe Calib Sys Pt 2 ML20266H5761983-10-14014 October 1983 Floor & Equipment Drains Basement & First Floor Reactor Building. Drawing Consists of Two Aperture Cards ML20263Q5201983-02-23023 February 1983 Schematic Diagram:Low Low Set Logic Div I & II 1985-09-30 Category:INSTRUMENTATION DRAWINGS-APPLICANT'S FACILITY MONTHYEARML20262L2801981-04-12012 April 1981
[Table view]Marked-up Plan - Instr & Control Equipment Reactor Building Fifth Floor El 684 Ft 6 Inches,South ML20262L2901980-12-0505 December 1980 Marked-up Instrument & Control Equipment Reactor Bldg Fifth Fl Plan - Northwest ML20263F7041971-06-14014 June 1971 Configurations of Panel Mounted Operators & Indicators. Sheet 2 1981-04-12 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20262L290&oldid=3132451"