ML20262H301
From kanterella
Jump to navigation
Jump to search
ML20262H301 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 05/28/1981 |
From: | FLUOR POWER SERVICE, INC. (SUBS. OF FLUOR CORP.) |
To: | WISCONSIN PUBLIC SERVICE CORP. |
Shared Package | |
ML111660054 | List: |
References | |
FIG-3, NUDOCS 8106020331 | |
Download: ML20262H301 (1) | |
Similar Documents at Kewaunee | |
---|---|
Category:ARRANGEMENT-GENERAL--DRAWINGS-APPLICANT'S FACILITY
MONTHYEARML20264A0951983-03-22022 March 1983
[Table view]General Arrangement:Reactor and Auxiliary Building Basement Floor. Sheet 2 ML20264A1021983-02-23023 February 1983 General Arrangement:Reactor and Auxiliary Building Miscellaneous Floor Plans. Sheet 7 of 11 ML20264A0981983-02-0202 February 1983 General Arrangement:Reactor and Auxiliary Building Mezzanine Floor. Sheet 4 of 11 ML20264A0991983-01-25025 January 1983 General Arrangement:Reactor and Auxiliary Building Operating Floor. Sheet 6 of 11 ML20264A0921983-01-25025 January 1983 General Arrangement:Turbine and Administration Building Basement Floor, as-built.Sheet 1 of 1 ML20262K7841981-06-0505 June 1981 App R Shutdown Sys:Reactor & Auxiliary Bldg Basement Floor ML20262K7771981-06-0505 June 1981 App R Shutdown Sys:Screenhouse ML20262K7791981-06-0505 June 1981 App R Shutdown Sys:Turbine & Administration Bldg Basement Floor ML20262K7821981-06-0505 June 1981 App R Shutdown Sys:Turbine & Administration Bldg Mezzanine Floor ML20262K7871981-06-0505 June 1981 App R Shutdown Sys:Reactor & Auxiliary Bldg Mezzanine Floor ML20262K7881981-06-0505 June 1981 App R Shutdown Sys:Reactor & Auxiliary Bldg Miscellaneous Floors ML20262K7911981-06-0505 June 1981 App R Shutdown Sys:Reactor & Auxiliary Bldg Operating Floor ML20262K7931981-06-0505 June 1981 App R Shutdown Sys:Reactor & Auxiliary Bldg Miscellaneous Floor Plans ML20262H3021981-05-28028 May 1981 Chemical Storage Locations. Sheet 2 of 6 ML20262H3011981-05-28028 May 1981 Chemical Storage Locations. Sheet 1 of 6 ML20262H2981981-05-28028 May 1981 Control Room Outside Air Intakes,Reactor Bldg,Aux Bldg, Turbine Bldg & Security Fence ML20261L5551980-02-27027 February 1980 Ventilation - Aux Bldg Elevation 657 Ft 6 Inches. Sheet 3 of 21 ML20261L5621979-12-14014 December 1979 Ventilation - Aux Bldg Elevation 626 Ft. Sheet 5 of 21 ML20261L5601979-12-14014 December 1979 Ventilation - Aux Bldg Elevation 642 Ft 3 Inches. Sheet 4 of 21 1983-03-22 Category:DRAWINGS MONTHYEARML20262C7441983-06-15015 June 1983
[Table view]Circuit Diagram 480v MCC 1-33A,1-33B,1-43A,1-43B,1-3352 & 1-62G. Actual Rev STATUS:N2-2 ML20262C7711983-04-0707 April 1983 Wiring Diagram - Motor Control Center 1-52F Ext & 1-3352. Actual Rev STATUS:02-1 ML20264A0951983-03-22022 March 1983 General Arrangement:Reactor and Auxiliary Building Basement Floor. Sheet 2 ML20262C7691983-03-0707 March 1983 External Connections - Przr Htrs MCC 1-33A,1-33B,1-43A, 1-43B & 1-62G. Actual Rev STATUS:E2-1 ML20262C7401983-03-0404 March 1983 Circuit Diagram 4160v & 480v Power Sources. Actual Rev STATUS:P2-2 ML20262C7481983-03-0101 March 1983 Control Schematic 480v Breaker 13304. Actual Rev STATUS:E2-2 ML20262C7351983-02-25025 February 1983 Integrated Logic Diagram:Reactor Coolant System. Sheet 3 of 5. Actual Rev STATUS:K2-3 ML20262C7511983-02-25025 February 1983 Wiring Diagram:480v Swgr Bus 1-33 Unit 4. Sheet 1 of 3. Actual Rev STATUS:F2-2 ML20264A1231983-02-23023 February 1983 Auxiliary Building Equipment Foundation Plan - El 586 Ft. Sheet 1 of 2. Actual Drawing NUMBER:237127A-S-309-JK ML20264A1021983-02-23023 February 1983 General Arrangement:Reactor and Auxiliary Building Miscellaneous Floor Plans. Sheet 7 of 11 ML20262C7541983-02-14014 February 1983 Wiring Diagram - 480v Swgr Bus 1-52 Unit 4. Sheet 1 of 1. Actual Rev STATUS:N2-2 ML20264A0981983-02-0202 February 1983 General Arrangement:Reactor and Auxiliary Building Mezzanine Floor. Sheet 4 of 11 ML20264A0921983-01-25025 January 1983 General Arrangement:Turbine and Administration Building Basement Floor, as-built.Sheet 1 of 1 ML20264A0991983-01-25025 January 1983 General Arrangement:Reactor and Auxiliary Building Operating Floor. Sheet 6 of 11 ML20262C7741983-01-14014 January 1983 W/D Ground Detector Cabinets RD117 & RD118. Actual Rev STATUS:C2-1 ML20262C7611983-01-14014 January 1983 W/D Penetrations F8 Junction Boxes JB1098 & JB1124 ML20262C7651982-11-23023 November 1982 Circuit Diagram:480v Swgr Normal Buses. Actual Rev STATUS:V2-1 ML20262C7581982-10-13013 October 1982 Control Schematic 480v Breaker 15212. Actual Rev STATUS:D2-2 ML20264A1371982-02-0505 February 1982 Auxiliary Building El 642 Ft 3 Inches & El 649 Ft 6 Inches Reinforced Conc Floor Plan & Misc Fl ML20260C9851982-01-0909 January 1982 Appendix R Shutdown Systems Reactor & Aux Bldg Bsmt Floor. No Revision Number Given ML20260C9901982-01-0909 January 1982 Appendix R Shutdown Systems Reactor & Aux Bldg Mezz Floor. No Revision Number Given ML20264A1201981-08-0303 August 1981 Auxiliary Building Reinforced Conc Wall Elev Sections & Dets ML20263A0281981-06-0909 June 1981 Flow Diagram:Reactor Coolant System. Sheet 1 of 1 ML20262K7931981-06-0505 June 1981 App R Shutdown Sys:Reactor & Auxiliary Bldg Miscellaneous Floor Plans ML20262K7771981-06-0505 June 1981 App R Shutdown Sys:Screenhouse ML20262K7791981-06-0505 June 1981 App R Shutdown Sys:Turbine & Administration Bldg Basement Floor ML20262K7821981-06-0505 June 1981 App R Shutdown Sys:Turbine & Administration Bldg Mezzanine Floor ML20262K7841981-06-0505 June 1981 App R Shutdown Sys:Reactor & Auxiliary Bldg Basement Floor ML20262K7871981-06-0505 June 1981 App R Shutdown Sys:Reactor & Auxiliary Bldg Mezzanine Floor ML20262K7881981-06-0505 June 1981 App R Shutdown Sys:Reactor & Auxiliary Bldg Miscellaneous Floors ML20262K7911981-06-0505 June 1981 App R Shutdown Sys:Reactor & Auxiliary Bldg Operating Floor ML20262H2981981-05-28028 May 1981 Control Room Outside Air Intakes,Reactor Bldg,Aux Bldg, Turbine Bldg & Security Fence ML20262H2951981-05-28028 May 1981 Marked-up Control Room Emergency Zone HVAC System Schematic ML20262H3011981-05-28028 May 1981 Chemical Storage Locations. Sheet 1 of 6 ML20262H3021981-05-28028 May 1981 Chemical Storage Locations. Sheet 2 of 6 ML20263A0221981-04-15015 April 1981 Integrated Logic Diagram:Reactor Coolant System. Sheet 5 of 5 ML20263A0231981-04-15015 April 1981 Integrated Logic Diagram:Reactor Coolant System. Sheet 4 of 5 ML20262F4101981-04-0909 April 1981 Flow Diagram:Main,Auxiliary Steam & Steam Dump. Sheet 1 of 1 ML20262F4001981-04-0909 April 1981 Figure 3-1 ML20262K4261981-03-17017 March 1981 Flow Diagram:Feedwater System ML20262F4051981-03-17017 March 1981 Flow Diagram:Feedwater System. Sheet 1 ML20262F4151981-03-0404 March 1981 Flow Diagram:Svc Water System. Sheet 1 of 1 ML20263A0261980-11-18018 November 1980 Reactor Coolant Gas Vent System:Piping Isometric & Plan ML20262K4421980-10-16016 October 1980 Control Schematic:4160 V Breaker I-604 ML20262F4451980-09-16016 September 1980 Flow Diagram:Reactor Coolant System. Sheet 1 of 1 ML20262K4241980-09-0505 September 1980 Flow Diagram:Main,Auxiliary Steam & Steam Dump ML20264A1051980-07-28028 July 1980 Architectural:Aux Bldg - Mezz Floor Plan 606 Ft ML20260L1231980-07-0808 July 1980 Isometric of Auxiliary Feedwater Piping to Steam Generator 1A & 1B, as-built.Sheet 1 of 1 ML20262K4591980-06-13013 June 1980 Schematic Diagram:Load Shedding Train A. Sheet 1 of 4 ML20262K4341980-06-13013 June 1980 Integrated Logic Diagram:Diesel Generator Electric. Sheet 3 of 10 1983-06-15 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20262H301&oldid=3134793"