ML20261D192
From kanterella
Jump to navigation
Jump to search
ML20261D192 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 10/22/1981 |
From: | NORTHEAST NUCLEAR ENERGY CO., STONE & WEBSTER ENGINEERING CORP. |
To: | |
Shared Package | |
ML20052B681 | List: |
References | |
TASK-02-03.B, TASK-2-3.B, TASK-RR 12179-EB-1A-9, 25212-25001, NUDOCS 8205030529 | |
Download: ML20261D192 (1) | |
Similar Documents at Millstone | |
---|---|
Category:DRAWINGS
MONTHYEARML20266B9911997-11-14014 November 1997
[Table view]4.18KV One Line Diagram Bus 34A (3NNS-SWG-A).Sheet 3.Date Illegible ML20266B8831997-11-0505 November 1997 125V Misc DC One Line Diagram Battery NO.2.Sheet 1 ML20266B8381997-11-0505 November 1997 480V One Line Diagram (3EJS-US-2A & 3EJS-LS-3B).Date Illegible ML20266B8201997-11-0505 November 1997 4.16KV One Line Diagram Bus 34D (3ENS-SWG-B (-P)).Sheet 1. Date Illegible ML20266B8241997-11-0505 November 1997 4.16KV One Line Diagram Bus 34D (3ENS-SWG-B(-P)).Sheet 2 ML20266B8431997-11-0505 November 1997 480V One Line Diagram (3NJS-US-7A & 3NJS-US-7B).Date Illegible ML20266B9261997-10-0909 October 1997 4.16KV One Line Diagram Bus 34A&B (24INS-SWG-A&B) & Aac Diesel Gen (38GS-BG-A).Sheet 2 ML20266C9711997-09-10010 September 1997 Single Line Meter & Relay Diagram 4 16KV Buses 24A & 24B (A1 & A2) ML20266B5001997-08-27027 August 1997 Piping & Instrumentation Diagram Reactor Plant Ventilation.Sheet 2 of 6 ML20266B5361997-08-27027 August 1997 Kv One Line Diagram Bus 34D 3ENS Swg 8 P.Sheet 2 ML20266B7521997-08-13013 August 1997 Piping & Instrumentation Diagram Plant Drainage.Sheet 1 of 4 ML20266A3171997-06-30030 June 1997 Site Plan Drainage and Chemical Plan.Sheet 3 of 6 ML20266A3251997-06-30030 June 1997 Site Plan Drainage and Chemical Storage Plan.Sheet 5 of 6 ML20266A3121997-06-30030 June 1997 Site Plan Drainage and Chemical Storage Plan.Sheet 2 of 6 ML20266A3071997-06-30030 June 1997 Site Plan Drainage and Chemical Storage Plan.Sheet 1 of 6 ML20266A3301997-06-30030 June 1997 Site Plan Drainage and Chemical Storage Plan.Sheet 6 of 6 ML20266B5761997-06-25025 June 1997 Piping & Instrumentation Diagram Emergency Diesel Generator a Lube Oil & Cooling Water.Sheet 1 of 5 ML20266C9671997-06-0909 June 1997 Main Single Line Diagram ML20266D0231997-05-30030 May 1997 Piping & Instrumentation Diagram Containment & Enclosure Building Ventilation.Sheet 5 of 5 ML20266B9331997-05-27027 May 1997 480V MCC One Line Diag Crclt Water Pumphouse ML20266B7931997-05-23023 May 1997 4.16KV One Line Diagram Bus 348 (3NNS-SWG-3) S4 1.Sheet 1 of 1 ML20266B8011997-05-23023 May 1997 4.16KV One Line Diagram Bus 34C (3ENS-SWG-A(-0)).Sheet 1 ML20266B5261997-05-23023 May 1997 Kv One Line Diagram Bus 34C 3ENS Swg a 0.Sheet 1 ML20266B5311997-05-23023 May 1997 Kv One Line Diagram Bus 34D 3ENS Swg 8 P.Sheet 1 ML20266B5921997-05-13013 May 1997 Piping & Instrumentation Diagram Emergency Generator Fuel Oil System. Sheet 1 of 1 ML20266B6041997-05-0808 May 1997 V DC One Line Diagram Batteries 301B 1 & 301B 2 ML20266B9431997-05-0808 May 1997 125V CC One Line Diagram Batteries 301B-1 & 301B-2 ML20266B5991997-05-0808 May 1997 V DC One Line Diagram Batteries 301A 1 & 301A 2 ML20266B8651997-05-0808 May 1997 480V MCC One Line Diag Control Bldg ML20266B8681997-05-0808 May 1997 125V DC One Line Diagram Batteries 301A-1 & 301A-2 ML20266B8731997-05-0808 May 1997 125V DC One Line Diagram Batteries 3C:B-1 & 301B-2 ML20266B8051997-05-0808 May 1997 Piping & Instrumentation Diagram Reactor Plant Ventilation. Sheet 1 of 6 ML20266B7121997-05-0606 May 1997 Piping & Instrumentation Diagram Service Water.Sheet 3 of 4 ML20266B4971997-05-0303 May 1997 Piping & Instrumentation Diagram Reactor Plant Ventilation.Sheet 1 of 6 ML20266C9921997-05-0101 May 1997 Piping & Instrumentation Diagram Emergency Diesel Generator H-7A Lube Oil,Air & Jacket Water Cooling.Sheet 2 of 5 ML20266B8971997-05-0101 May 1997 120V Misc AC One Line Diagram.Sheet 5 ML20266C9961997-05-0101 May 1997 Piping & Instrumentation Diagram Emergency Diesel Generator H-7B Lube Oil,Air & Jacket Water Cooling.Sheet 3 of 5 ML20266A3211997-04-30030 April 1997 Site Plan Drainage and Chemical Storage Plan.Sheet 4 of 6 ML20266B5841997-04-23023 April 1997 Piping & Instrumentation Diagram Emergency Diesel Generator B Lub Oil & Cooling Water.Sheet 3 of 5 ML20266B6111997-04-21021 April 1997 V Distribution Pnl One Line Diag Emergency Diesel Generator 3EGS PNL1A 3EGS PNL1B ML20266B7151997-04-19019 April 1997 Piping & Instrumentation Diagram Service Water.Sheet 4 of 4 ML20266B5861997-04-10010 April 1997 Piping & Instrumentation Diagram Emergency Diesel Generator B Starting Air System.Sheet 4 of 5 ML20266B5801997-04-10010 April 1997 Piping & Instrumentation Diagram Emergency Diesel Generator a Starting Air System.Sheet 2 of 5 ML20266B9291997-04-0707 April 1997 480V MCC One Line Diag Auxillary Bldg.Sheet 3 ML20266B5491997-04-0707 April 1997 V MCC One Line Diag Auxiliary Bldg.Sheet 3 ML20266B8611997-04-0707 April 1997 480V MCC One Line Diag Rod Control Area.Sheet 2 ML20266B8581997-04-0707 April 1997 480V MCC One Line Diag Rod Control Area.Sheet 1 ML20266B5531997-04-0707 April 1997 V MCC One Line Diag Dsl Encl & Aux Blr a ML20266B5581997-04-0707 April 1997 V MCC One Line Diag Rod Control Area.Sheet 2 ML20266B8511997-04-0707 April 1997 480V MCC Oneline Diag ESF Building.Sheet 2 1997-09-10 Category:DRAWINGS-PIPING & INSTRUMENTATION DIAGRAMS-APPLICANT'S MONTHYEARML20260K8251989-11-29029 November 1989
[Table view]Water Flow NPDES Permit CT0003263, as-built. Actual Drawing NUMBER:SKA-AFF-111789-2 ML20265D9381988-04-26026 April 1988 Steam Generator No 1 Inservice Inspection Program, as-built ML20265A4791987-08-25025 August 1987 Boundary Diagram Service Water to Chilled Water System, as-built.Sheet 5 ML20265A4541987-05-11011 May 1987 Piping & Instrumentation Diagram Diesel Generator Starting Air, as-built.Sheet 1 of 3 ML20265A5071986-12-10010 December 1986 Boundary Diagram Reactor Coolant System Inservice Insp Program, as-built.Sheet 11 ML20266C5181986-02-0505 February 1986 Boundary Diagram:Emergency Diesel Generator a Jacket Cooling Sys, as-built.Sheet 18 ML20266C5241986-02-0505 February 1986 Boundary Diagram:Emergency Diesel Generator B Jacket Cooling Sys, as-built.Sheet 19 ML20266C4901986-02-0505 February 1986 Boundary Diagram:Emergency Diesel Generator a Fuel Oil Sys, as-built.Sheet 12 ML20266C5131986-02-0505 February 1986 Boundary Diagram:Emergency Diesel Generators a & B Air Cooling Sys, as-built.Sheet 17 ML20266C4991986-02-0404 February 1986 Boundary Diagram:Diesel Air Starting Sys (Dass) a Diesel Engine, as-built.Sheet 14 ML20266C5041986-02-0404 February 1986 Boundary Diagram:Diesel Air Starting Sys (Dass) B Diesel Generator, as-built.Sheet 15 ML20266C5091986-02-0404 February 1986 Boundary Diagram:Emergency Diesel Generators a & B Lube Oil Sys, as-built.Sheet 16 ML20266C4951986-02-0404 February 1986 Boundary Diagram:Emergency Diesel Generator B Fuel Oil Sys, as-built.Sheet 13 ML20265B9521985-11-21021 November 1985 Simplified Flow Diagram for App R Review Report Systems. No Rev Date ML20265B9461985-11-21021 November 1985 Simplified Flow Diagram for Appendix R Review Low Pressure Coolant Injection. No Rev Date ML20265B9411985-11-21021 November 1985 Simplified Flow Diagram for Appendix R Review Feedwater Coolant Injection. No Rev Date ML20265B9351985-11-21021 November 1985 Simplified Flow Diagram for Appendix R Review Isolation Condenser. No Rev Date ML20262G0021984-09-17017 September 1984 Flow Diagram:Drywell N2 Instrument Header, as-built. Sheet 3 ML20262F9931984-08-20020 August 1984 Flow Diagram:Post Accident Sampling System, as-built ML20262F8111984-08-0707 August 1984 Flow Diagram:Drywell N2 Atmospheric Compressor System, as-built.Sheet 2 ML20264B3681984-05-15015 May 1984 Piping & Instrumentation Diagram:Turbine Plant Component Cooling System. No Drawing Date ML20264B3721984-05-15015 May 1984 Piping & Instrumentation Diagram:Turbine Plant Component Cooling System. No Drawing Date ML20262F9971984-04-12012 April 1984 Flow Diagram:Control Rod Drive Hydraulic System Headers & Scram Discharges Volumes, as-built ML20264B2201983-12-16016 December 1983 Piping & Instrumentation Diagram:Reactor Plant Component Cooling System ML20264B4111983-12-0101 December 1983 Piping & Instrumentation Diagram:Turbine Plant Ventilation. Sheet 3 of 3. Actual Drawing NUMBER:12179-EM-150C-1B. Actual Rev STATUS:1B ML20264B3901983-11-16016 November 1983 Piping & Instrumentation Diagram:Control Building Heating, Ventilation and Air Conditioning. Actual Drawing NUMBER:12179-EM-151A-1A. Actual Rev STATUS:1A ML20264B3941983-11-16016 November 1983 Piping & Instrumentation Diagram:Control Building Heating, Ventilation and Air Conditioning. Actual Drawing NUMBER:12179-EM-151B-1A. Actual Rev STATUS:1A ML20263N4011983-06-0202 June 1983 Marked-up Piping & Instrumentation Diagram:Low Pressure Safety Injection. Actual Drawing NUMBER:12179-EM-112A-1A,Rev 1A ML20259C6461983-05-12012 May 1983 Flow Diagram - Drywell N2 Instrument Header. Sheet 3 ML20259C6421983-04-0505 April 1983 Flow Diagram - Drywell N2 Atmospheric Compressor Sys, as-built.Sheet 2 ML20264B2851983-02-28028 February 1983 Piping & Instrumentation Diagram:Water Treatment System. Actual Drawing NUMBER:12179-EM-120C-1C. Actual Rev STATUS:1C ML20264B2701983-02-28028 February 1983 Piping & Instrumentation Diagram:Water Treatment System. Sheet 1 of 4. Actual Drawing NUMBER:12179-EM-120A-1C. Actual Rev STATUS:1C ML20264B2771983-02-28028 February 1983 Piping & Instrumentation Diagram:Water Treatment System. Actual Drawing NUMBER:12179-EM-120B-1B. Actual Rev STATUS:1B ML20264B3571983-02-0909 February 1983 Piping & Instrumentation Diagram:Condensate System. Actual Drawing NUMBER:12179-EM-126C-1A. Actual Rev STATUS:1A ML20264A1591983-01-10010 January 1983 HVAC - Control Diagrams, as-built.Consists of Two Aperture Cards ML20264B4061983-01-0505 January 1983 Piping & Instrumentation Diagram:Reactor Plant Ventilation ML20264B4041983-01-0505 January 1983 Piping & Instrumentation Diagram:Reactor Plant Ventilation ML20264B4021983-01-0505 January 1983 Piping & Instrumentation Diagram:Reactor Plant Ventilation ML20264A1661982-11-0202 November 1982 Drywell N2 Atmospheric Compressor System ML20264B4011982-10-15015 October 1982 Piping & Instrumentation Diagram:Control Building Heating, Ventilation and Air Conditioning ML20264B3991982-10-15015 October 1982 Piping & Instrumentation Diagram:Control Building Heating, Ventilation and Air Conditioning ML20264B3971982-10-15015 October 1982 Piping & Instrumentation Diagram:Control Building Heating, Ventilation and Air Conditioning ML20264B3731982-10-14014 October 1982 Piping & Instrumentation Diagram:Primary Grade Water Sys ML20264B3771982-07-0202 July 1982 Piping & Instrumentation Diagram:Compressed Air ML20264B3751982-07-0202 July 1982 Piping & Instrumentation Diagram:Compressed Air ML20264B4291982-07-0202 July 1982 Piping & Instrumentation Diagram:Condensate System ML20264B3191982-07-0202 July 1982 Piping & Instrumentation Diagram:Condensate System ML20264B3231982-07-0202 July 1982 Piping & Instrumentation Diagram:Condensate System ML20264B4131982-06-28028 June 1982 Piping & Instrumentation Diagram:Office,Esf and Msv Buildings - Heating,Vent & Air Conditioning ML20264B4151982-06-28028 June 1982 Piping & Instrumentation Diagram:Office,Esf and Msv Buildings - Heating,Vent & Air Conditioning 1989-11-29 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20261D192&oldid=3139830"