ML20260F253
From kanterella
Jump to navigation
Jump to search
ML20260F253 | |
Person / Time | |
---|---|
Site: | Zimmer |
Issue date: | 08/01/1980 |
From: | KENTUCKY, COMMONWEALTH OF |
To: | CINCINNATI GAS & ELECTRIC CO. |
Shared Package | |
ML19330B794 | List: |
References | |
NUDOCS 8008060264 | |
Download: ML20260F253 (1) | |
Similar Documents at Zimmer | |
---|---|
Category:DRAWINGS
MONTHYEARML20262K2901982-11-30030 November 1982
[Table view]P&Id:Reactor Building Closed Cooling Water (Wr). Sheet 3 of 4.No Revision Date ML20262K3011982-11-23023 November 1982 P&Id:Reactor Building Closed Cooling Water (Wr). Sheet 1 of 4 ML20262K1481982-11-12012 November 1982 P&Id:Service Water (Ws). Sheet 1 of 4 ML20262J6801982-11-10010 November 1982 P&Id:Circulating Water (Cw). Sheet 1 of 4 ML20262K2841982-11-0303 November 1982 P&Id:Off Gas System (Og). Sheet 1 of 3 ML20262J6631982-11-0303 November 1982 P&Id:Residual Heat Removal (Rh). Sheet 2 of 4 ML20262K2561982-10-18018 October 1982 P&Id:Process Sampling (Ps) Gas Sampling - Ducts & Vents. Sheet 5 ML20262K1681982-10-18018 October 1982 P&Id:Feedwater (Fw). Sheet 1 of 1 ML20262K2791982-10-14014 October 1982 P&Id:Reactor Building and Containment Equipment Drains to Radwaste (Re). Sheet 1 of 4 ML20262K2771982-10-14014 October 1982 P&Id:Liquid Radwaste (WE) Equipment Drain Collection System. Sheet 1 of 13 ML20262K2091982-10-11011 October 1982 P&Id:Containment Monitoring (Cm). Sheet 1 of 2 ML20262K2221982-10-0808 October 1982 P&Id:Machine Shop Ventilation (Vj) ML20262K2171982-10-0808 October 1982 P&Id:Service Building HVAC (Main Floor) (Vs). Sheet 1 of 5 ML20262K2611982-10-0606 October 1982 P&Id:Nuclear Boiler System (Nb). Sheet 1 of 2 ML20262K2691982-09-28028 September 1982 Instrument Air Supply (Ia). Sheet 1 of 14 ML20262K2011982-09-24024 September 1982 General Arrangement:Floor Plan El 473 Ft 5 Inches & 475 Ft 6 Inches ML20262K1911982-09-24024 September 1982 General Arrangement:Sections F-F & G-G ML20262J6371982-09-24024 September 1982 P&Id:Fuel Pool Cooling and Cleanup System (Fc). Sheet 1 of 2 ML20262K3051982-09-20020 September 1982 P&Id:Standby Liquid Control (Sc). Sheet 1 of 1 ML20262J6521982-09-16016 September 1982 P&Id:Reactor Core Isolation Cooling (Ri). Sheet 1 of 2 ML20262K1601982-09-13013 September 1982 P&Id:Feedwater Heater Miscellaneous Drains & Vents (Dv). Sheet 1 of 2 ML20262K2661982-09-0707 September 1982 MSIV Leakage Control System (Lc). Sheet 1 of 2 ML20262K2461982-09-0707 September 1982 P&Id:Standby Gas Treatment System Equipment Train (Vg) ML20262K2641982-08-31031 August 1982 P&Id:Containment Monitoring (Cm). Sheet 2 ML20262K1961982-08-25025 August 1982 General Arrangement:Upper Reactor Floor Plans ML20262K1661982-08-20020 August 1982 P&Id:Condensate Polishing Demineralizer (Cp). Sheet 2 ML20262J6221982-08-16016 August 1982 P&Id:Control Rod Drive Hydraulic (Rd). Sheet 3 of 3 ML20262J6321982-08-12012 August 1982 P&Id:Reactor Water Cleanup (Rt). Sheet 1 of 3 ML20262J6301982-08-12012 August 1982 P&Id:Reactor Water Cleanup (Rt). Sheet 2 ML20262K2531982-08-0909 August 1982 Post Accident Sampling and Analysis System (Pasas). Sheet 6 ML20262K2711982-08-0404 August 1982 P&Id:Diesel Generator Auxiliary System Engine Jacket Cooling Water (Dg). Sheet 2 of 3 ML20262J6251982-07-29029 July 1982 P&Id:Control Rod Drive Hydraulic (Rd). Sheet 1 of 3 ML20262K1841982-07-28028 July 1982 P&Id:Main Steam (Ms). Sheet 1 of 4 ML20262K2951982-07-27027 July 1982 P&Id:Reactor Building Closed Cooling Water (Wr). Sheet 2 of 4 ML20262K1281982-07-26026 July 1982 P&Id:Service Water (Ws). Sheet 4 of 4 ML20262J6881982-07-16016 July 1982 P&ID:Make-up Demineralizer (Wm). Sheet 3 ML20262K1401982-07-15015 July 1982 P&Id:Service Water (Ws). Sheet 2 ML20262K2381982-07-14014 July 1982 P&Id:Primary Containment Ventilation (Vp). Sheet 2 of 9 ML20262K1791982-07-14014 July 1982 P&Id:Main Steam (Ms). Sheet 2 ML20262K2591982-07-12012 July 1982 P&Id:Process Sampling (Ps) Reactor Building. Sheet 1 of 5 ML20262K2481982-07-12012 July 1982 P&Id:Control Room HVAC (Vc). Sheet 1 of 4 ML20262K2271982-07-12012 July 1982 P&Id:Turbine Building Vent Laundry Area (Vt). Sheet 3 of 3 ML20262K2121982-07-12012 July 1982 P&Id:Laboratory HVAC (Vl). Sheet 1 of 3 ML20262K2061982-07-12012 July 1982 P&Id:Primary Containment & Suppression Pool Purge (Vq) ML20262J6241982-06-21021 June 1982 P&Id:Control Rod Drive Hydraulic (Rd). Sheet 2 of 3 ML20262K1881982-06-0404 June 1982 General Arrangement:Reactor Operating Floor Laydown ML20262J6731982-06-0202 June 1982 P&Id:Circulating Water (Cw). Sheet 2 of 4 ML20262K1731982-05-27027 May 1982 P&Id:Extraction Steam (Es). Sheet 1 of 2 ML20262K2321982-05-19019 May 1982 P&Id:Core Standby Cooling System Equipment Cooling (Vy) ML20262K2401982-04-26026 April 1982 P&Id:Primary Containment Ventilation Chilled Water Piping (Vp). Sheet 1 of 3 1982-09-07 Category:DRAWINGS-OTHER-APPLICANT'S FACILITY MONTHYEARML20260F2571980-08-0101 August 1980
[Table view]General Highway Map:Pendleton Country,Ky ML20260F2531980-08-0101 August 1980 General Highway Map:Campbel County,Ky 1980-08-01 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20260F253&oldid=3142418"