ML20260B433
From kanterella
Jump to navigation
Jump to search
ML20260B433 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 05/09/1983 |
From: | SARGENT & LUNDY, INC. |
To: | ILLINOIS POWER CO. |
Shared Package | |
ML20112H237 | List: |
References | |
CON-4536, RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM M10-1201, NUDOCS 8501170041 | |
Download: ML20260B433 (1) | |
Similar Documents at Clinton | |
---|---|
Category:DRAWINGS
MONTHYEARML20262E7671994-08-24024 August 1994
[Table view]Shroud. Sheet 3 of 3 ML20262E7621994-08-24024 August 1994 Shroud. Sheet 2 of 3 ML20262E7791994-08-24024 August 1994 Top Guide ML20262E7851994-08-24024 August 1994 Shroud Support Leg ML20262E7721994-08-24024 August 1994 Shroud ML20262E7581994-08-24024 August 1994 Shroud. Sheet 1 of 3 ML20262E7761994-08-24024 August 1994 Core Plate ML20266D8411987-03-0505 March 1987 Assy Standby Information Vb. Sheet 1.Rev Date Illegible ML20266D8451986-10-24024 October 1986 Schematic Diagram Reactor Recirculation System (RR) Anticipated Transient Without Scram (ATWS) System. Sheet 513 ML20266D8641986-10-17017 October 1986 Single Line Diagram 125V DC & Uninterruptible Power Supply Systems ML20266D8561986-10-0808 October 1986 Schematic Diagram Reactor Recirculation System (RR) Anticipated Transient Without Scram (ATWS) System Control 2. Sheet 515 ML20266D8511986-10-0808 October 1986 Schematic Diagram Reactor Recirculation System (RR) Anticipated Transient Without Scram (ATWS) System Control 1. Sheet 514 ML20266D8691986-01-17017 January 1986 Electrical Loading Diagram ML20266D8791985-12-16016 December 1985 P&ID Control Rod Drive System, as-built.Sheet 2 of 2 ML20266D8591985-07-0505 July 1985 Schematic Diagram Reactor Recirculation Sys (RR) Flow Diverters 1B33-D300A & B. Sheet 516 ML20266D8841985-04-10010 April 1985 P&ID Control Rod Drive System, as-built.Sheet 1 ML20262G0261985-04-0909 April 1985 16 Inch CRC Pipe Ultrasonic Calibration Block (Clinton). Sheet 1 of 1 ML20261A8811985-04-0808 April 1985 Snubber Assembly 70 Kip. Sheet 20.No Rev Date.Drawing Consists of Two Aperture Cards ML20262G0211985-04-0808 April 1985 20 Inch CRC Pipe Ultrasonic Calibration Block (Clinton). Sheet 1 of 1 ML20261A8651985-04-0404 April 1985 Outline Hydraulic Control Unit. Sheet 2.Rev Date Illegible ML20261A8621985-04-0404 April 1985 Outline Hydraulic Control Unit. Sheet 2.Rev Date Illegible ML20261A8771985-04-0404 April 1985 Snubber Assembly 70 Kip. Sheet 19.No Rev Date.Drawing Consists of Three Aperture Cards ML20261A8691985-04-0404 April 1985 Outline Control Rod Drive. Rev Date Illegible ML20261A8731985-04-0404 April 1985 Snubber Assembly 50 Kip. Sheet 17.No Rev Date.Drawing Consists of Three Aperture Cards ML20266D8741985-02-27027 February 1985 Front Elevation Subpanel 1P680-09A Gen Mn X'Mer,Lube Oil Cont ML20259D9041984-10-0909 October 1984 Installation Kit:Equipment Storage Racks. Sheet 2.No Rev Date ML20259D8961984-10-0909 October 1984 Installation Kit:Equipment Storage Racks. No Rev Date ML20259D8991984-10-0909 October 1984 Installation Kit:Fuel Storage Vault. No Rev Date ML20259E4891984-09-28028 September 1984 P&ID Instrument Air (IA) Fuel,Aux,Drywell & Containment Bldg. Sheet 7 of 23 ML20260B4241984-09-27027 September 1984 Containment Piping Plan Floor El 778 Ft ML20266D8301984-09-21021 September 1984 Assy Insert P680-09C. Sheet 1 ML20266D8361984-09-0707 September 1984 Legend Plate. Sheet 1 ML20260B4181984-09-0707 September 1984 Containment Piping Plan Floor El 778 Ft ML20266D8241984-09-0707 September 1984 Product Dwg Legend Plate,Insert 9C. Sheet 1 ML20259E4941984-06-12012 June 1984 P&Id/C&I Diagram Main Steam System (Ms). Sheet 1 ML20263M5881984-02-0909 February 1984 Elem Diag:Automatic Depressurization Sys (Nsps). Sheet 5. Rev Date Illegible ML20263M4581984-02-0909 February 1984 Elem Diag:Reactor Core Isln Cooling (Nsps). Sheet 1.Rev Date Illegible ML20263M5831984-02-0909 February 1984 Elem Diag:Automatic Depressurization Sys (Nsps). Sheet 3. Rev Date Illegible ML20263M5581984-02-0909 February 1984 Elem Diag:Reactor Core Isln Cooling Sys (Nsps). Sheet 18.Rev Date Illegible ML20263M5461984-02-0909 February 1984 Elem Diag:Reactor Core Isln Cooling Sys (Nsps). Sheet 13. Rev Date Illegible ML20263M6231984-02-0909 February 1984 Elem Diag:Automatic Depressurization Sys (Nsps). Sheet 19. Rev Date Illegible ML20263M5381984-02-0909 February 1984 Elem Diag:Reactor Core Isln Cooling Sys (Nsps). Sheet 11. Rev Date Illegible ML20263M5311984-02-0909 February 1984 Elem Diag:Reactor Core Isln Cooling Sys (Nsps). Sheet 8.No Rev Date ML20263M4681984-02-0909 February 1984 Elem Diag:Reactor Core Isln Cooling Sys (Nsps). Sheet 4. Rev Date Illegible ML20263M4631984-02-0909 February 1984 Elem Diag:Reactor Core Isln Cooling Sys (Nsps). Sheet 2. Rev Date Illegible ML20263M4601984-02-0909 February 1984 Reactor Core Isln Cooling Sys (Nsps). Sheet 1A.Rev Date Illegible ML20259E4811984-02-0707 February 1984 P&ID Instrument Air Containment Building (Ia). Sheet 5 of 23 ML20259E4861983-12-30030 December 1983 P&ID Instrument Air Containment Bldg (Ia). Sheet 15 of 23 ML20263M5511983-10-25025 October 1983 Elem Diag:Reactor Core Isln Cooling Sys (Nsps). Sheet 15 ML20263M5861983-10-10010 October 1983 Elem Diag:Automatic Depressurization Sys (Nsps). Sheet 4 1994-08-24 Category:INSTRUMENTATION DRAWINGS-APPLICANT'S FACILITY MONTHYEARML20260B4331983-05-0909 May 1983
[Table view]Control & Instrumentation Installation Detail Containment Area Radiation Monitoring Detector. Sheet 38 ML20260B4281983-03-18018 March 1983 Marked-up Installation Detail for High Range Drywell Radiation Monitoring. Sheet 35 ML20261M5261982-04-0606 April 1982 Fan Hsg Reinforcement for Missile Penetration ML20261M5221982-04-0606 April 1982 Fan Hsg Reinforcement for Missile Penetration ML20261M5191982-04-0606 April 1982 Fan Hsg Reinforcement for Missile Penetration ML20261M5161982-04-0606 April 1982 Fan Hsg Reinforcement for Missile Penetration ML20261M5131982-04-0606 April 1982 Fan Hsg Reinforcement for Missile Penetration 1983-05-09 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20260B433&oldid=3143425"