ML20260A499 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 02/28/1983 |
From: | BECHTEL GROUP, INC. |
To: | HOUSTON LIGHTING & POWER CO. |
Shared Package | |
ML20101F404 | List: |
References | |
CON-14926 3C02-1-C-1576, 3C2-1-C-1576, NUDOCS 8412270256 | |
Download: ML20260A499 (1) | |
Similar Documents at South Texas | |
---|---|
Category:DRAWINGS
MONTHYEARML20266C5541997-11-11011 November 1997
[Table view]Mnl OP Gate Valve MOD 08000GH8400000D0 ML20266C5661997-10-0808 October 1997 Piping & Instrumentation Diagram Liquid Waste Processing System ML20266B3331997-09-22022 September 1997 Piping and Instrumentation Diagram Safety Injection System ML20266B3031997-09-0202 September 1997 Piping and Instrumentation Diagram Safety Injection System ML20266B2641997-07-30030 July 1997 Piping and Instrumentation Diagram Essential Cooling Water System Train 1B.Sheet 2 ML20266B2601997-06-25025 June 1997 Piping and Instrumentation Diagram Essential Cooling Water System Train 1A.Sheet 1 ML20266B2701997-06-17017 June 1997 Piping and Instrumentation Diagram Essential Cooling Water System Train 1C.Sheet 3 ML20266B2411997-05-15015 May 1997 Piping and Instrumentation Diagram Component Cooling Water System.Sheet 1 ML20266B2461997-05-15015 May 1997 Piping and Instrumentation Diagram Component Cooling Water System ML20266B2171997-05-15015 May 1997 Piping and Instrumentation Diagram Component Cooling Water System ML20266B2141997-05-15015 May 1997 Piping and Instrumentation Diagram Component Cooling Water System ML20266C4961997-03-13013 March 1997 Piping & Instrumentatiion Diagram Radioactive Vent & Drain Ststen Sump Pumps ML20266C4421997-03-0404 March 1997 Piping & Instrumentation Diagram Primary Sampling Sys ML20266C4551996-12-13013 December 1996 Project Control Drawing Solenoid Operated Valve Energize to Open Size 1 Inch Sw.Sheet 1 of 2 ML20266B2221996-12-11011 December 1996 Piping and Instrumentation Diagram Component Cooling Water System ML20266B2961996-11-0505 November 1996 Piping and Instrumentation Diagram Residual Heal Removal System ML20266C5361996-11-0505 November 1996 Piping & Instrumentation Diagram Residual Heat Removal System ML20266B3241996-10-16016 October 1996 Piping and Instrumentation Diagram Safety Injection System ML20266B3601996-10-16016 October 1996 Piping & Instrumentation Diagram HVAC Essential Chilled Water System ML20266B2981996-10-0909 October 1996 Piping and Instrumentation Diagram Residual Heat Reomval System ML20266B3061996-10-0909 October 1996 Piping and Instrument Diagram Safety Injection System ML20266B2751996-10-0202 October 1996 Piping and Instrumentation Diagram Essential Cooling Water System Train 2A.Sheet 1 ML20266C4521996-09-26026 September 1996 1 15 C SW 70 18 9 Drt with 5/8 Linear Plug ML20265A9071996-08-0505 August 1996 Piping & Instrumentation Diagram Standby Diesel Generator Fuel Oil Storage & Transfer System.Sheet 1 of 1 ML20266B3161996-06-11011 June 1996 Piping and Instrumentation Diagram Safety Injection System ML20265A9181996-06-11011 June 1996 Piping & Instrumentation Diagram Safety Injection System. Sheet 1 of 1 ML20266B3111996-06-11011 June 1996 Piping and Instrumentation Diagram Safety Injection System ML20266B3211996-06-11011 June 1996 Piping and Instrumentation Diagram Safety Injection System ML20266D7351996-04-10010 April 1996 General Arrangement Isolation Valve Cubicle Roof Plan Area E ML20266C1211996-03-0505 March 1996 Piping & Instrumentation Diagram Standby Diesel Generator Fuel Oil Storage & Transfer Sys.Sheet 1 ML20266C1171996-01-10010 January 1996 Piping & Instrumentation Diagram Standby Diesel Generator Fuel Oil Storage & Transfer Sys.Sheet 1 ML20266B2061995-12-11011 December 1995 Piping and Instrumentation Diagram Component Cooling Water System ML20266B1961995-11-14014 November 1995 Piping & Instrumentation Diagram Auxiliary Feedwater. Sheet 1 of 2 ML20266B2101995-11-0707 November 1995 Piping and Instrumentation Diagram Component Cooling Water System ML20266B2271995-11-0707 November 1995 Piping and Instrumentation Diagram Component Cooling Water System ML20266C1651995-10-0606 October 1995 Piping & Instrumentation Diagram Essential Cooling Water Sys Train 1C.Sheet 3 ML20266C1881995-10-0505 October 1995 Piping & Instrumentation Diagram Essential Cooling Water Sys Train 1B.Sheet 2 ML20265E7081995-09-11011 September 1995 Piping and Instrumentation Diagram Essential Cooling Water System Train 1A ML20266B4031995-09-0606 September 1995 Piping Instrumentation Diagram HVAC Electrical Auxiliary Building & Control Room Outside Air Makeup System ML20265A9541995-08-29029 August 1995 Yard Civil Protected Area Vehicle Barrier Sys ML20266B3981995-08-29029 August 1995 Piping & Instrumentation Diagram HVAC Electrical Auxiliary Building & Control Room Outside Air Makeup System ML20266C4291995-05-22022 May 1995 Piping & Instrument Diagran Safety Injection Sys ML20266B2821995-05-0202 May 1995 Piping and Instrumentation Diagram Essential Cooling Water System Train 2C.Sheet 3 ML20266C1251995-05-0202 May 1995 Piping & Instrumentation Diagram Essenial Cooling Water Sys Train 2C.Sheet 3 ML20266C4451995-04-10010 April 1995 Primary Sampling Sys Ps.Sheet A01 ML20266B2011995-04-0606 April 1995 Piping & Instrumentation Diagram Auxiliary Feedwater. Sheet 2 of 2 ML20266B3291995-03-22022 March 1995 Piping and Instrument Diagram Safety Injection System ML20266C5051995-03-21021 March 1995 Radioactive Vents & Drains ED Unit 1.Sheet 32 ML20266B3931995-03-20020 March 1995 Piping & Instrumentation Diagram HVAC Reactor Containment Building Fan Coolers Subsystem ML20265A9151995-03-10010 March 1995 Piping & Instrumentation Diagram Essential Cooling Water System.Sheet 1 of 1 1997-09-22 Category:DRAWINGS-ARCHITECTURAL-APPLICANT'S FACILITY MONTHYEARML20266C8851988-10-11011 October 1988
[Table view]Spent Fuel Storage Racks Installation Plan Phase II ML20266C8881988-10-11011 October 1988 Plan Arrangement of Spent Fuel Storage Pool (Removable Poison/Poison Wall) ML20262G2071985-10-10010 October 1985 Architectural:Fuel Handling Building Egress Path & Signage Program Floor Plan at El -12 Ft,-13 Ft,-21 Ft,-29 Ft & 4 Ft ML20262G1781985-10-10010 October 1985 Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 10 Ft ML20262G1831985-10-10010 October 1985 Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 19 Ft & 51 Ft 6 Inches ML20262G1871985-10-10010 October 1985 Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 21 Ft,23 Ft & 29 Ft ML20262G1921985-10-10010 October 1985 Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 35 Ft & 41 Ft ML20262G1961985-10-10010 October 1985 Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 60 Ft ML20262G2001985-10-10010 October 1985 Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 72 Ft,74 Ft & 60 Ft ML20262G2041985-10-10010 October 1985 Architectural:Mechanical and Electrical Auxiliary Building Egress Path & Signage Program Floor Plan at El 86 Ft ML20262G2091985-10-10010 October 1985 Architectural:Fuel Handling Building Egress Path & Signage Program Floor Plan at El 30 Ft ML20262G2131985-10-10010 October 1985 Architectural:Fuel Handling Building Egress Path & Signage Program Floor Plan at El 42 Ft 6 Inches & 53 Ft 3 Inches ML20262G2161985-10-10010 October 1985 Architectural:Fuel Handling Building Egress Path & Signage Program Floor Plan at El 68 Ft ML20262G2251985-10-10010 October 1985 Architectural:Turbine Generator Building Egress Path & Signage Program Floor Plan at El 29 Ft ML20262G2281985-10-10010 October 1985 Architectural:Turbine Generator Building Egress Path & Signage Program Floor Plan at El 55 Ft ML20262G2321985-10-10010 October 1985 Architectural:Turbine Generator Building Egress Path & Signage Program Floor Plan at El 83 Ft ML20262G2341985-10-10010 October 1985 Architectural:Diesel Generator Bldg Egress Path & Signage Program Floor Plan at El 25 Ft,55 Ft & 82 Ft ML20262G2381985-10-10010 October 1985 Architectural:Isolation Valve Cubicle Building Egress Path & Signage Program Fl Plan at 34 Ft,44 Ft,51 Ft 6 Inches,58 Ft 6 Inches,65 Ft 6 Inches,86 Ft & 10 Ft ML20262G2421985-10-10010 October 1985 Architectural:Meab & Fhb Egress Path & Signage Program Physical Barrier at Stairs ML20262G2461985-10-10010 October 1985 Architectural:Tgb Dgb Ivc & Meab Egress Path & Signage Program Emergency Stair at Mab & Dgb ML20260A4261984-11-0909 November 1984 Concrete Fuel Handling Building Section D-D Unit No.1 & 2 ML20260A4421984-11-0909 November 1984 Concrete Reactor Containment Building Internal Section D-D Unit No.1 ML20260A4061984-10-30030 October 1984 Concrete Fuel Handling Building Section & Detail Unit No.1 & 2 ML20260A4151984-10-15015 October 1984 Concrete Fuel Handling Building Sections & Details Unit No.1 & 2 ML20260A4791984-08-0303 August 1984 Structural Reactor Containment Building Stm.Gen.R.C. Pump Vert. & Press Z.Lat.Support Unit No.1 & 2 ML20260A4311984-06-14014 June 1984 Concrete Fuel Handling Building Plan Sections & Details Unit No.1 ML20260A4901984-05-0101 May 1984 Concrete Reinforcement Reactor Containment Building Internal-Fill Slab Sections & Details Unit No.1 ML20260A5081984-04-10010 April 1984 Concrete Reactor Containment Building Internal Section A-A Unit No.1 ML20260A4461984-04-10010 April 1984 Concrete Reactor Containment Building Internal - Misc. Sections & Details Unit No.1 ML20260A4191983-07-15015 July 1983 Concrete Fuel Handling Building Spent Fuel Pool Section A-A Unit No.1 & 2 ML20260A4841983-06-21021 June 1983 Concrete Reinforcement Reactor Containment Building Internal-Plan@EL.68 Ft-0 Inches Unit No.1 ML20260A4231983-06-13013 June 1983 Concrete Fuel Handling Building Spent Fuel Pool-Sections Unit No.1 & 2 ML20260A4511983-04-26026 April 1983 Concrete Reinforcement Reactor Containment Building Internal-Lateral Support Reinf.@EL38 Ft-4 Inches Unit No.1 ML20260A4561983-04-26026 April 1983 Concrete Reinforcement Reactor Containment Building Internal-Lateral Support Reinf.@EL38 Ft-4 Inches Unit No.1 ML20260A4611983-04-26026 April 1983 Concrete Reinforcement Reactor Containment Building Internal-Lateral Support Reinf.@EL.38 Ft-4 Inches Unit No.1 ML20260A4651983-04-25025 April 1983 Concrete Reinforcement Reactor Containment Building Internal-Lateral Support Reinf.@EL.66 Ft-71/2 Inches Unit No.1 ML20260A4701983-04-25025 April 1983 Concrete Reinforcement Reactor Containment Building Internal-Lateral Support Reinf.@EL.66 Ft 71/2 Inches Unit No.1 ML20260A4761983-04-25025 April 1983 Concrete Reinforcement Reactor Containment Building Internal-Lateral Support Reinf. Sections Unit No.1 ML20260A4371983-03-0202 March 1983 Concrete Reactor Containment Building Reactor Vessel Support Sects & Det'S Unit No 1 ML20260A4101983-02-28028 February 1983 Concrete Fuel Handling Building Section C-C Unit No.1 & 2 ML20260A4991983-02-28028 February 1983 Concrete Reactor Containment Building Internal-Misc. Sections & Details Unit No.1 ML20260A4951983-02-28028 February 1983 Concrete Reinforcement Reactor Containment Building Internal-Miscellaneous Sections Unit No.1 ML20260A5041982-11-15015 November 1982 Concrete Reinforcement Reactor Containment Building Internal-Misc. Sections & Details Unit No.1 ML20260A4021982-09-24024 September 1982 Concrete Fuel Handling Building Section A-A Unit No.1 & 2 1988-10-11 |