ML20259C310 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 06/07/1983 |
From: | PAUL-MUNROE HYDRAULICS, INC. |
To: | TEXAS UTILITIES SERVICES, INC. |
Shared Package | |
ML20072A474 | List: |
References | |
PD16660, NUDOCS 8306100154 | |
Download: ML20259C310 (1) | |
Similar Documents at Comanche Peak | |
---|---|
Category:DRAWINGS
MONTHYEARML20260B5281989-06-0707 June 1989
[Table view]80 a 30 Rectifier. Sheet 3.No Drawing Date ML20260B5201989-06-0707 June 1989 7.5 Kva Fixed Frequency Inverter Outline & External Connections. Sheet 1.No Drawing Date ML20260B5241989-06-0707 June 1989 7.5 Kva FF Static Inverter System Block Diagram Operating Instructions. Sheet 2.No Drawing Date ML20260B5151989-06-0707 June 1989 7.5 Kva 118 Vac 10 60 Hz Fixed Frequency Invertor. Sheet 4.Rev Date Illegible ML20265B0901987-11-17017 November 1987 Moment Limiting Component Support Structures. Sheet 1. Rev Date Illegible. Actual Rev STATUS:CP-2 ML20266H1131986-10-0303 October 1986 Termination Rack CPI-ECPRTC-41 Interconnection Diagram. Rev Date Illegible. Actual Rev STATUS:CP-4 ML20266H1701986-10-0303 October 1986 Termination Rack CPI-ECPRTC-42 Interconnection Diagram. Rev Date Illegible. Actual Rev STATUS:CP-3 ML20266H1831986-07-18018 July 1986 Solid State Protection System Train B Output Cabinet Number 1 Interconnection Diagram. Actual Rev STATUS:CP-4 ML20266E3111986-05-21021 May 1986 Seismic Tube Support Span Lengths. Rev Date Incomplete ML20266E1091986-05-19019 May 1986 FB Spent Fuel Pool Liner Dets. Sheet 1 ML20266E1181986-05-19019 May 1986 FB Spent Fuel Pool Liner Dets. Sheet 2.Rev Date Illegible ML20266E1041986-05-19019 May 1986 FB Spent Fuel Pool Liner Dets. Sheet 3.Rev Date Illegible ML20266E1281986-05-19019 May 1986 FB Spent Fuel Pool Liner Dets. Sheet 4.Rev Date Illegible ML20266E0941986-05-19019 May 1986 Primary Plant Fuel Building Floor Plan at El 838 Ft 9 Inches & 841 Ft. Rev Date Illegible ML20266E1381986-05-19019 May 1986 Reactor Bldg Electric Penetration Area Cable Tray Support Plan ML20266E1431986-05-19019 May 1986 Cable Tray Support. Sheet 9.Rev Date Illegible ML20266E0581986-05-19019 May 1986 Primary Plant Auxiliary & Electrical Control Building Floor Plan,El 778 Ft & 790 Ft 6 Inches. Rev Date Illegible ML20266H1081985-07-26026 July 1985 BOP Aux Relay Rack 2 CPI-ECPRCR-04 External Connection Diagram. Actual Rev STATUS:CP-7 ML20266H1761985-07-23023 July 1985 Main Control Board CPI-ECPRCB-03 Interconnection Diagram. Actual Rev STATUS:CP-6 ML20266H1591985-07-0808 July 1985 Solid State System Train a Output Cabinet 2 Interconnection Diagram. Actual Rev STATUS:CP-1 ML20266H1481985-04-25025 April 1985 Solid State Safeguards Sequencer Cabinet a Interconnection Diagram Tag CPI-ECPRCCR-01. Actual Rev STATUS:CP-3 ML20266H0951985-04-0606 April 1985 Voided BOP Aux Relay Rack 2 CPI-ECPRCR-04 External Connection Diagram. Actual Rev STATUS:CP-6 ML20266E0391984-09-19019 September 1984 Cable Tray Support. Sheet 1. Actual Rev STATUS:CP-3 ML20266E3021984-09-17017 September 1984 Instrument Tabulation Sheet. Sheet 3 of 5. Actual Rev STATUS:CP-1 ML20264D7831984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 Miscellaneous Plans & Details. Actual Rev STATUS:CP-1 ML20264D7941984-08-15015 August 1984 Fire Hazard Analysis Building Cross-Section D-D. Actual Rev STATUS:CP-1 ML20264D7801984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 Fin Fl @ El 803 Ft & 810 Ft 6 Inches. Actual Rev STATUS:CP-1 ML20264D7821984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 Fl Plan @ El 830 Ft. Actual Rev STATUS:CP-1 ML20264D7581984-08-15015 August 1984 Fire Hazard Analysis Primary Plant Units 1/2 Roof Plan & Details. Actual Rev STATUS:CP-1 ML20264D8001984-08-15015 August 1984 Fire Hazard Analysis Maintenance Building Fl Plans & Refl Clg Plan. Actual Rev STATUS:CP-1 ML20264D8051984-08-15015 August 1984 Fire Hazard Analysis Circulating Water Intake Struct Plan @ El 795 Ft 9 Inches. Actual Rev STATUS:CP-1 ML20264D8141984-08-15015 August 1984 Tabulations of Fire Hazards. Sheet 3. Actual Rev STATUS:CP-1 ML20264D7911984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 & 2 Miscellaneous Plans & Details. Actual Rev STATUS:CP-1 ML20264D7711984-08-15015 August 1984 Fire Hazard Analysis Elec & Control Bldg Plans & Details. Actual Rev STATUS:CP-1 ML20264D8181984-08-15015 August 1984 Tabulations of Fire Hazards. Sheet 5. Actual Rev STATUS:CP-1 ML20264D8161984-08-15015 August 1984 Tabulations of Fire Hazards. Sheet 4. Actual Rev STATUS:CP-1 ML20264D7921984-08-15015 August 1984 Fire Hazard Analysis Building Cross-Section A-A,B-B. Actual Rev STATUS:CP-1 ML20264D7721984-08-15015 August 1984 Fire Hazard Analysis Fuel Bldg Fl Plan @ El 810 Ft 6 Inches & 803 Ft 8 Inches. Actual Rev STATUS:CP-1 ML20264D8111984-08-15015 August 1984 Tabulations of Fire Hazards. Sheet 1. Actual Rev STATUS:CP-1 ML20264D7741984-08-15015 August 1984 Fire Hazard Analysis Fuel Bldg Fl Plan @ El 838 Ft 9 Inches & 841 Ft. Actual Rev STATUS:CP-1 ML20264D8131984-08-15015 August 1984 Tabulations of Fire Hazards. Sheet 2. Actual Rev STATUS:CP-1 ML20264D7601984-08-15015 August 1984 Fire Hazard Analysis Auxiliary and Electrical Control Bldg El 778 Ft/790 Ft 6 Inches. Actual Rev STATUS:CP-1 ML20264D7621984-08-15015 August 1984 Fire Hazard Analysis Auxiliary and Elec Control Bldg El 807 Ft & 810 Ft 6 Inches. Actual Rev STATUS:CP-1 ML20264D7631984-08-15015 August 1984 Fire Hazard Analysis Auxiliary and Elec Control Bldg Fl Plan El 830 Ft/831 Ft 6 Inches. Actual Rev STATUS:CP-1 ML20264D8071984-08-15015 August 1984 Fire Hazard Analysis Switchyard Relay House Fl Plans,Elevs & Sect. Actual Rev STATUS:CP-1 ML20264D7851984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 & 2 Miscellaneous Plans. Actual Rev STATUS:CP-1 ML20264D7671984-08-15015 August 1984 Fire Hazard Analysis Auxiliary Bldg Part Plans @ El 842 Ft/873 Ft 6 Inches/886 Ft 6 Inches. Actual Rev STATUS:CP-1 ML20264D8091984-08-15015 August 1984 Fire Hazard Analysis Primary Access Point Guard House. Actual Rev STATUS:CP-1 ML20264D7781984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 Fl Plan @ El 778 Ft. Actual Rev STATUS:CP-1 ML20264D7891984-08-15015 August 1984 Fire Hazard Analysis Turbine Bldg-Unit 1 & 2 Misc Plans. Actual Rev STATUS:CP-1 1989-06-07 Category:DRAWINGS-MECHANICAL--APPLICANT'S FACILITY MONTHYEARML20264B8671984-06-14014 June 1984
[Table view]Mechanical:Symbols & Notes. Rev Date Illegible ML20263B9361983-07-29029 July 1983 Mechanical:Symbols & Notes ML20259C3271983-06-0707 June 1983 Control Valve. Date Illegible ML20259C3241983-06-0707 June 1983 Type G3DBS-187 De Laval Imo Pump. Date Illegible ML20259C3201983-06-0707 June 1983 Hydraulic Snubber Assembly 1000K1P. Rev Date Illegible ML20259C3101983-06-0707 June 1983 Reservoir Assembly. Date Illegible ML20259C3151983-04-0808 April 1983 Installation - Snubbers & Reservoir. Actual Rev STATUS:CP-1 1984-06-14 |