From: Patel, Chandu Sent: Sunday, September 13, 2020 6:57 PM To: Vogtle PEmails Cc: Patel, Chandu

Subject:

FW: RE: Follow up on Updated FLEX OIP Conference Call Attachments: Responses to questions during July 28 Conference Call on FLEX OIP NP.pdf From: Kellenberger, Nicholas <X2NRKELL@SOUTHERNCO.COM>

Sent: Thursday, September 03, 2020 3:40 PM To: Patel, Chandu <Chandu.Patel@nrc.gov>

Subject:

[External_Sender] RE: Follow up on Updated FLEX OIP Conference Call Hi Chandu, We did a review and identified one part of the information provided that was taken from the proprietary section of the OIP submittal. That was in the discussion on RAI 02-02. Weve updated the file to remove the proprietary information so it should be able to be placed into ADAMs.

Thanks for checking with us first.

Thanks, Nick Kellenberger Site Licensing Supervisor Vogtle 3 and 4 phone: (706) 437-2333 mobile: (803) 391-9671 From: Patel, Chandu <Chandu.Patel@nrc.gov>

Sent: Tuesday, September 1, 2020 6:36 PM To: Kellenberger, Nicholas <X2NRKELL@SOUTHERNCO.COM>

Subject:

RE: Follow up on Updated FLEX OIP Conference Call EXTERNAL MAIL: Caution Opening Links or Files Hi Nick, Is there any objection if we put this in ADAMS? Is there any proprietary information in this?

Please let me know if you have any reservations for putting in ADAMS.

Thanks, Chandu From: Kellenberger, Nicholas <X2NRKELL@SOUTHERNCO.COM>

Sent: Tuesday, September 01, 2020 4:24 PM

To: Patel, Chandu <Chandu.Patel@nrc.gov>

Cc: Stacy, Kara M. <KMSTACY@southernco.com>; Spaulding, Douglas F.

<X2DFSPAU@SOUTHERNCO.COM>

Subject:

[External_Sender] Follow up on Updated FLEX OIP Conference Call

Chandu, Sorry I didnt get to your call earlier today. Attached are the follow up items from our 7/28 conference call. Please let us know if you have any further questions.
Thanks, Nick Kellenberger Site Licensing Supervisor Vogtle 3 and 4 phone: (706) 437-2333 mobile: (803) 391-9671

Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 588 Mail Envelope Properties (SA9PR09MB5997F12071A5A7968E52FBDB82220)

Subject:

FW: RE: Follow up on Updated FLEX OIP Conference Call Sent Date: 9/13/2020 6:56:34 PM Received Date: 9/13/2020 6:56:38 PM From: Patel, Chandu Created By: Chandu.Patel@nrc.gov Recipients:

"Patel, Chandu" <Chandu.Patel@nrc.gov>

Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office: SA9PR09MB5997.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2078 9/13/2020 6:56:38 PM Responses to questions during July 28 Conference Call on FLEX OIP NP.pdf 186932 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

1. NRCrequestedinformationonthepost72hoursequipmentstoredatSAFER.



Response:



VEGP3&4OffsiteEquipment

Descriptionof PerformanceCriteria Notes

PortableEquipment

PCS/SFPMakeup 135gpmat236ft.developedheadand100gpmat Oneportabletrailermounteddiesel Pump 273ft.developedhead. drivenpumpperunit.Plus,thereis

 onesparepump.

PumptakessuctionfromPCCAWSTtoyardsafety 

relatedflangeconnectionforsupportofpassive

coolingandspentfuelpoolmakeup.

PCCAWSTMakeup 300gpmpressureratingRGT300psiwithminimum Oneportabletrailermounteddiesel Pump 26ft.suctionlift. drivenpumpthatiscapableof

 providingadequateflowtobothunits

UsedforindefinitemakeuptothePCCAWSTby simultaneously.Plus,thereisone

pumpingwaterfromtheSavannahRiver.The sparepump

pumpdischargeisdirecteddirectlyintothetopof

PCCAWST.

PortableGenerators 480V,150KW,0.8PF,3PhaseWYE,plusNeutral Onetrailermounteddieseldriven

andGround,CapableofParallelOperation, portablegeneratorperunit.Plus

VoltageVariance+/5%,FrequencyVariance+/ thereisonesparegenerator

0.25%

Ventilation 1hp,1700cfm,Fan,with300ftdetachablehose, Sevensets,3perunitplusonespare.

Fans/Hose electricrating:singlephase115VAC. 



ReplacesAncillary:OnefanisforMCR

whichrequires1700cfm@0.65in.ofwater.



TwofansforI&Croomswhichrequires1500

cfm@0.71inchesofwater.

VentilationDuct AntiStatic,16diameterin25ftlengths 16lengths,8lengthsperunit.

FireHose 5inchdoublejacket,300psiservicepressurehose Totalof220lengthsin

in50ftlengths. supportofallpumpsfor

 bothunits.



TemporaryCabling/ Powercable600V,1/C,4/0AWG,in100ft Total4000ft.of4/0AWGforeach

Adapters lengths conductor(2000ft.foreachunit)



PowercableSuperTRX2/3CPPAcable,in50ft. Total1600ft.0fTRXcable(800ft

lengths eachunit)





 



2. NRCrequestedthestatusofpreviousRAIssubmittedin2014and2015?



x NRCaskedifUnit3canstillconnectthetwoFLEXpumpsinseriestocoverthecontainment?



TheUpdatedFLEXOIP,Section2.9.2.1and2.9.2.2,donotcreditthatalignmentforastrategy.



Section2.9.2.1PrimaryStrategy,states:

Forindefinitecopingafter7days,Phase3equipmentincludesaselfpoweredpump(PCCAWSTmakeup

pump)andappropriateconnectionmaterialstorefillthePCCAWSTfromtheSavannahRiver.



Section2.9.2.2,AlternateStrategy(modifiedfromoriginal),states:

In the unlikely event that both PCS recirculation pumps are unavailable, the selfpowered PCS

recirculationpumpequivalent,willtakesuctionfromthePCCAWSTviatheconnectionaddedtothe

overflow/drainline(Reference66).Insteadoftheportablepumpsupplycomingfromtheclosest,river,

lake,oroceansource,anddischargingtoasafetyrelated,seismicallyqualifiedflange(References48

and49)usingfirehose,aseparatePCCAWSTmakeuppumpwilldrawwaterfromtheSavannahRiver

andprovidemakeuptothePCCAWST.ThisallowsmakeuptotheSFPandthepassivecontainment

coolingwaterstoragetank(PCCWST)ashighlightedonFigure2ofReference2.Theminimumrequired

headandmaximumpumpdischargeheadforthePCSrecirculationpumpequivalentisdocumentedin

Table31Section11ofReference18.TheSAFERpumpswillmeetthesecriteria.



x NRCaskedwhatistheprimarysourceofwaterfortheFLEXstrategy?



TheSavannahRiveristhecreditedwatersource.However,thereareseveralcleanersourcesofwater

thatwouldbeconsideredpriortopumpingriverwaterintotheplant.



x NRCaskedifnotreferencingtheRAIresponsesintheUpdatedFLEXOIPwasanoversightorintentionally

donetonolongerfollowthem?



Duringthecallwestateditwaslikelyanoversight,andstatedwewouldtakeanotherpassthroughthe

RAI responses and communicate the continued validity or point to the updated/changed information

providedintheupdatedFLEXOIP.



Overall,theRAIresponsesarestillvalidwithsomeexceptionasprovidedbelow:



RAI012statesinpart:

TheonlyportableoffsitevalverequiredisthePCS/SFPmakeuppumpdischargethrottlingvalvewhichisincluded

aspartofthepumpskid.Thisvalvewillhavemanualthrottlingcapabilitywhichwillbeguidedbyaflowmeter

alsocontainedwithinthepumpskid.Itwillbemaintainedalongwiththepumpasdescribedintheresponseto

RAI011.



IdentifieddifferencewiththeRAIresponse:

Thereisnodischargethrottlingvalveonthepumpskid.Thepumpisavariablespeedpumpwhichcancontrol

theflowrateandactlikeathrottlingvalve.Therewillbeaportableflowmeterprovidedinthepumpdischarge

hosetomonitorpumpflow.



RAI0103statesinpart:

ThePCCAWSTmakeuppumpisdeterminedtohavearequiredflowrateof150gpm.



IdentifieddifferencewiththeRAIresponse:

ThePCCAWSTmakeuppumpissizedtosupportbothUnits3&4simultaneously.Itsuppliesatotalminimumof

300gpm(150gpmperunit).



UpdatedOIPSection2.19.6,N+1EquipmentRequirement,states:

N+1willbeprocuredforasingleresponsecenter. Consistent withNEI1206,Section3.2.2.16,3piecesof

portable equipment will be provided when a separate train is needed for each unit (portable generator and

PCCWST Makeup Pump) and two pieces will be provided when a single train can supply both units (ultimate

makeupfromtheSavannahRiver,thecreditedsourceforVEGPUnits3and4).Thisequipmentwillbestoredat

theregionalresponsecenterinPhoenix,AZ.



TheultimatemakeuppumpfromtheriveristhePCCAWSTMakeupPumpwhichiscapableofsupplyingboth

units.



Thisisnotconsideredachangetothecompliancemethodasthepumpsareequivalenttothepreviouslyspecified

pumpsandcontinuetomeettheN+1concept.



RAI0202statesinpart:

AsdiscussedinAPPGWGLR170,theprimarystrategyfortheoffsitereplacementgeneratorsistoreplacethe

permanentlyinstalledancillarydieselgenerators.Therefore,thesamenominalgeneratorratingisselectedfor

theoffsitereplacementgeneratorsasforthepermanentlyinstalledancillarydieselgenerators(80kW,480V).

The alternate strategy, as described in APPGWGLR170 Section 9b, requires less power than the primary

strategybecausethePCSrecirculationpumps,andtheoffsiteportablepumpswouldnotbepoweredfromthe

offsite portable generator in this alternate configuration.  Therefore, the nominal rating of 80 kW / 480V is

consideredboundingfortheprimaryandalternateFLEXstrategies.



IdentifieddifferencewiththeRAIresponse:

Theoffsitereplacementgeneratorbeingprovidedforeachunitisa150kW/480Vdieseldrivengenerator.



ThisgeneratorisdiscussedinUpdatedOIPSection2.11.2.2,AlternateStrategy.



Thisisnotconsideredachangetothecompliancemethodasthegeneratorsprovidedarelarger,notdifferent.



RAI0204statesinpart:

TheAP1000post72hourproceduresspecifytheuseofpermanentlyinstallednonsafetyequipmentastheinitial

strategyforbothPCSandSFPmakeupasdescribedinAPPGWGLR170.ForthealternatestrategyforFLEX,only

portableequipmentisused.Thisportableequipmentishookeduptosafetyrelatedconnectionpointsandstored

asufficientdistancefromthesitesuchthatitwouldnotreasonablybesubjecttothesamehazardatthesite.

SincethealternateFLEXstrategiesonlyusesafetyrelatedpermanentlyinstalledconnectionpointsandportable

equipment that are expected to survive all hazards, justification that the permanently installed nonsafety

equipmentfortheinitial(primary)strategysurvivesanyhazardisnotrequired.

IdentifieddifferencewiththeRAIresponse:

Theportableequipmentishookeduptoprotectedconnectionpointsthatareeithersafetyrelatedordesigned

tobehazardrobust.

TosupportjustifyingthepermanentlyinstallednonsafetyrelatedequipmenttheUpdatedOIPsection2.9.2.2,

states:

ThePCSrecirculationpumps,theonsiteancillarydieselgenerators,andthePCCAWSTarenonsafetyrelated

components. However, these components are rugged components located in nuclear seismic structures with

seismiccategoryIIanchorageandarelikelytobeavailableoreasilyrepairablefollowingabeyonddesignbasis

event.ThePCSrecirculationpumpsarelocatedintheseismiccategoryIauxiliarybuilding.Theonsiteancillary

dieselgeneratorsarelocatedintheseismiccategoryIIannexbuilding.ThePCCAWSTisaseismiccategoryIItank

intheyard.



Thisisnotconsideredachangetothecompliancemethodasalltheplantconnectionsareconsideredprotected

anddesignedtobesurvivable(hazardrobust).



RAI0206statesinpart:



Therefore, both the PCS recirculation pumps and the PCS/SFP offsite portable makeup pump require an

envelopingdesignflowrateof135gpm.ThePCCAWSTmakeuppumpisdeterminedtohavearequiredflowrate

of150gpm.



IdentifieddifferencewiththeRAIresponse:



ThePCCAWSTmakeuppumpissizedtosupportbothUnits3&4simultaneously.Itsuppliesatotalminimumof

300gpm(150gpmperunit).SeetheresponsetoRAI0103above.



Thisisnotconsideredachangetothecompliancemethodasthepumpsareequivalenttothepreviouslyspecified

pumpsandcontinuetomeettheN+1concept.



RAI0210statesinpart:



AlternatestrategyIntheeventthatthePCSrecirculationpumpsareunavailable,Phase3equipmentforthe

AP1000designincludesasecondselfpoweredoffsitepump(PCS/SFPmakeuppump)andappropriateconnection

materials[that]allowsmakeuptotheSFPandthepassivecontainmentcoolingwaterstoragetank(PCCWST)as

highlightedonFigure2.[]Supplytotheselfpoweredpumpwillcomefromtheclosestriver,lake,orocean

source.



AdditionalDiscussion:Forthealternatestrategy,thePCS/SFPmakeuppumpisusedinserieswiththePCCAWST

makeuppump,eitherdirectlyinseriesorindirectly(ifthePCCAWSTisstillavailable).ThePCCAWSTmakeup

pumpissizedappropriatelytodeliverwaterfromtheclosestriver,lake,oroceansource;regardlessofwhether

thedestinationisthePCCAWSTorthesuctionofthePCS/SFPmakeuppump.



IdentifieddifferencewiththeRAIresponse:

UpdatedOIPSection2.9.2.2,AlternateStrategy(modifiedfromoriginal),states:

IntheunlikelyeventthatbothPCSrecirculationpumpsareunavailable,theselfpoweredPCSrecirculationpump

equivalent,willtakesuctionfromthePCCAWSTviatheconnectionaddedtotheoverflow/drainline(Reference

66).Insteadoftheportablepumpsupplycomingfromtheclosest,river,lake,oroceansource,anddischarging

to a safetyrelated,seismicallyqualified flange (References 48 and 49) using fire hose, a separate PCCAWST

makeup pump will draw water from the Savannah River and provide makeup to the PCCAWST.  This allows

makeuptotheSFPandthepassivecontainmentcoolingwaterstoragetank(PCCWST)ashighlightedonFigure2

ofReference2.TheminimumrequiredheadandmaximumpumpdischargeheadforthePCSrecirculationpump

equivalentisdocumentedinTable31Section11ofReference18.TheSAFERpumpswillmeetthesecriteria.



Thisisnotconsideredachangetothecompliancemethodasthestrategystillusestwopumpsandtheultimate

watersourceisstilltheriver.ThedifferencehereisthattheseismiccategoryIIPCCAWSTremainsbetweenthe

two pumps and the strategy no longer has the pumps directly in series.  This modification is considered an

operationalenhancementandstillmeetstheintentoftheoriginalstrategy.



3. TheNRCaskedadditionalquestionsandprovidedOEandotherthingstoconsiderfortheFIP.



x NRCaskedisthereafueloilreplenishmentstrategy?



ReferenceprocedureNMPOS019367VogtleUnitDSIG7,DieselFuelOilTransferforstrategy.



x NRCaskedisthereadequateultralowsulfurfueloilbasedontheuseoftheUnit1&2fuelsupplyfor

Unit3and4debrisclearing/towingcapability?



TheNMPOS019367procedureprovidesdirectionforresupplyoffueloilsupplyvolume.



x TheNRCsharedsomeOEaboutphaserotationconcerningconnectingbackupdiesels.



Units3&4areconsideringphaserotationinourconfigurations



x TheNRCsharedthattheoperatingfleethadtoaddresshydrogenbuildupfrombatterycharging.



ForFLEX,VEGPUnits3&4donotrechargethebatteriesinthemitigationoftheeventandthereisno

sourceofhydrogentoconsider.



x TheNRCstatedthatUnits1&2hasPMPfloodingissueswithpondingontheirhaulpathandaskedifwe

hadconsideredit?



ThereisanevaluationcompletedforUnits3&4titled,FLEXDeploymentRouteDebrisAssessment,which

isAttachment2toprocedureNMPGM038004,VEGP34DiverseandFlexibleCopingStrategies(FLEX)

ProgramDocument.Thatattachmentlooksattheeffectsofapplicableextremeexternalhazardsonthe

deploymentpathsincludingflooding.Theattachmentisbasedonthefollowingreports:

o 2316200030RM10R00003, Version 1.0, VEGP Units 3 and 4 FLEX Debris Removal

Assessment

o 2316200030RM10R00004,Version1.0,VEGPUnits3and4FLEXExternalHazards

Evaluation

InAttachment2oftheFLEXprogramdocumentitstates:

TheonlyprobablefloodingatVEGPwouldbeduetoextremeprecipitation.Somedebris

wouldbedeposited.Itwillbelimitedtosmallfloatingitems.Thisisconsideredminimaland

notanadverseimpacttositetravel.

x The NRC reviewers recalled that the Units 1&2 severe weather procedure had some actions for cold

weather,andtheyneededtoaddressiceconditionsfortheirhaulpaths.



ThereisanevaluationcompletedforUnits3&4titled,FLEXDeploymentRouteDebrisAssessment,which

isAttachment2toprocedureNMPGM038004,VEGP34DiverseandFlexibleCopingStrategies(FLEX)

ProgramDocument.Thatattachmentlooksattheeffectsofapplicableextremeexternalhazardsonthe

deploymentpathsincludingicing.Theattachmentisbasedonthefollowingreports:

o 2316200030RM10R00003,Version1.0,VEGPUnits3and4FLEXDebrisRemovalAssessment

o 2316200030RM10R00004,Version1.0,VEGPUnits3and4FLEXExternalHazardsEvaluation

InAttachment2oftheprogramdocumentitstates:

Icebuildupcouldconceivablyaffecttheintegrityofanonrobuststructurewithicebuildup

onrooftops,etc.Thiswouldmostlikelyresultinacollapseofasmallportionofthebuilding

withintheexistingbuildingfootprint.Althoughpartialstructuralcollapsesmayoccur,there

arenobuildingsinthetravelpaththatwouldadverselyaffecttransportation.Extremecold

andicebuildupcouldconceivablyresultindownedpowerlinesandtrees.Anydownedlines

canberemovedwiththeonsitedebrisremovalequipment.

Units1&2haveamoreurgentrequirementforusingthehaulpathstostageFLEXequipment.However,

Units 3 & 4 doesnt stage FLEX equipment for the first 72 hours ensuring adequate time to address

possibleicyroadwaysand/ordebris.



x NRCaskedwhydowetalkaboutRemoteShutdownroomin2.14butnowwhereelse?Isthatokaythat

itisn'tcoveredanywhereelse?



TheRSRisnotpartoftheflexstrategy.ThementionoftheRSRintheOIPisdescribingnormallighting

anditsassociatedpowersupplies.Thefurtherdiscussionofthestrategyisfocusedonprovidinglighting

tothecontrolroom.Noactionrequired.