From:
Patel, Chandu Sent:
Sunday, September 13, 2020 6:57 PM To:
Vogtle PEmails Cc:
Patel, Chandu
Subject:
FW: RE: Follow up on Updated FLEX OIP Conference Call Attachments:
Responses to questions during July 28 Conference Call on FLEX OIP NP.pdf From: Kellenberger, Nicholas <X2NRKELL@SOUTHERNCO.COM>
Sent: Thursday, September 03, 2020 3:40 PM To: Patel, Chandu <Chandu.Patel@nrc.gov>
Subject:
[External_Sender] RE: Follow up on Updated FLEX OIP Conference Call Hi Chandu, We did a review and identified one part of the information provided that was taken from the proprietary section of the OIP submittal. That was in the discussion on RAI 02-02. Weve updated the file to remove the proprietary information so it should be able to be placed into ADAMs.
Thanks for checking with us first.
- Thanks, Nick Kellenberger Site Licensing Supervisor Vogtle 3 and 4 phone: (706) 437-2333 mobile: (803) 391-9671 From: Patel, Chandu <Chandu.Patel@nrc.gov>
Sent: Tuesday, September 1, 2020 6:36 PM To: Kellenberger, Nicholas <X2NRKELL@SOUTHERNCO.COM>
Subject:
RE: Follow up on Updated FLEX OIP Conference Call EXTERNAL MAIL: Caution Opening Links or Files Hi Nick, Is there any objection if we put this in ADAMS? Is there any proprietary information in this?
Please let me know if you have any reservations for putting in ADAMS.
- Thanks, Chandu From: Kellenberger, Nicholas <X2NRKELL@SOUTHERNCO.COM>
Sent: Tuesday, September 01, 2020 4:24 PM
To: Patel, Chandu <Chandu.Patel@nrc.gov>
Cc: Stacy, Kara M. <KMSTACY@southernco.com>; Spaulding, Douglas F.
<X2DFSPAU@SOUTHERNCO.COM>
Subject:
[External_Sender] Follow up on Updated FLEX OIP Conference Call
- Chandu, Sorry I didnt get to your call earlier today. Attached are the follow up items from our 7/28 conference call. Please let us know if you have any further questions.
- Thanks, Nick Kellenberger Site Licensing Supervisor Vogtle 3 and 4 phone: (706) 437-2333 mobile: (803) 391-9671
Hearing Identifier:
Vogtle_COL_Docs_Public Email Number:
588 Mail Envelope Properties (SA9PR09MB5997F12071A5A7968E52FBDB82220)
Subject:
FW: RE: Follow up on Updated FLEX OIP Conference Call Sent Date:
9/13/2020 6:56:34 PM Received Date:
9/13/2020 6:56:38 PM From:
Patel, Chandu Created By:
Chandu.Patel@nrc.gov Recipients:
"Patel, Chandu" <Chandu.Patel@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office:
SA9PR09MB5997.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2078 9/13/2020 6:56:38 PM Responses to questions during July 28 Conference Call on FLEX OIP NP.pdf 186932 Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
- 1.
NRCrequestedinformationonthepost72hoursequipmentstoredatSAFER.
Response:
VEGP3&4OffsiteEquipment
Descriptionof
PortableEquipment
PerformanceCriteria
Notes
PCS/SFPMakeup
Pump
135gpmat236ft.developedheadand100gpmat
273ft.developedhead.
PumptakessuctionfromPCCAWSTtoyardsafety relatedflangeconnectionforsupportofpassive
coolingandspentfuelpoolmakeup.
Oneportabletrailermounteddiesel drivenpumpperunit.Plus,thereis
onesparepump.
PCCAWSTMakeup
Pump
300gpmpressureratingRGT300psiwithminimum
26ft.suctionlift.
UsedforindefinitemakeuptothePCCAWSTby
pumpingwaterfromtheSavannahRiver.The
pumpdischargeisdirecteddirectlyintothetopof
PCCAWST.
Oneportabletrailermounteddiesel drivenpumpthatiscapableof
providingadequateflowtobothunits
simultaneously.Plus,thereisone
sparepump
PortableGenerators
480V,150KW,0.8PF,3PhaseWYE,plusNeutral
andGround,CapableofParallelOperation,
VoltageVariance+/5%,FrequencyVariance+/
0.25%
Onetrailermounteddieseldriven
portablegeneratorperunit.Plus
thereisonesparegenerator
Ventilation
Fans/Hose
1hp,1700cfm,Fan,with300ftdetachablehose,
electricrating:singlephase115VAC.
ReplacesAncillary:OnefanisforMCR
whichrequires1700cfm@0.65in.ofwater.
TwofansforI&Croomswhichrequires1500
cfm@0.71inchesofwater.
Sevensets,3perunitplusonespare.
VentilationDuct
AntiStatic,16diameterin25ftlengths
16lengths,8lengthsperunit.
FireHose
5inchdoublejacket,300psiservicepressurehose
in50ftlengths.
Totalof220lengthsin
supportofallpumpsfor
bothunits.
TemporaryCabling/
Adapters
Powercable600V,1/C,4/0AWG,in100ft
lengths
PowercableSuperTRX2/3CPPAcable,in50ft.
lengths
Total4000ft.of4/0AWGforeach
conductor(2000ft.foreachunit)
Total1600ft.0fTRXcable(800ft
eachunit)
- 2. NRCrequestedthestatusofpreviousRAIssubmittedin2014and2015?
x NRCaskedifUnit3canstillconnectthetwoFLEXpumpsinseriestocoverthecontainment?
TheUpdatedFLEXOIP,Section2.9.2.1and2.9.2.2,donotcreditthatalignmentforastrategy.
Section2.9.2.1PrimaryStrategy,states:
Forindefinitecopingafter7days,Phase3equipmentincludesaselfpoweredpump(PCCAWSTmakeup
pump)andappropriateconnectionmaterialstorefillthePCCAWSTfromtheSavannahRiver.
Section2.9.2.2,AlternateStrategy(modifiedfromoriginal),states:
In the unlikely event that both PCS recirculation pumps are unavailable, the selfpowered PCS
recirculationpumpequivalent,willtakesuctionfromthePCCAWSTviatheconnectionaddedtothe
overflow/drainline(Reference66).Insteadoftheportablepumpsupplycomingfromtheclosest,river,
lake,oroceansource,anddischargingtoasafetyrelated,seismicallyqualifiedflange(References48
and49)usingfirehose,aseparatePCCAWSTmakeuppumpwilldrawwaterfromtheSavannahRiver
andprovidemakeuptothePCCAWST.ThisallowsmakeuptotheSFPandthepassivecontainment
coolingwaterstoragetank(PCCWST)ashighlightedonFigure2ofReference2.Theminimumrequired
headandmaximumpumpdischargeheadforthePCSrecirculationpumpequivalentisdocumentedin
Table31Section11ofReference18.TheSAFERpumpswillmeetthesecriteria.
x NRCaskedwhatistheprimarysourceofwaterfortheFLEXstrategy?
TheSavannahRiveristhecreditedwatersource.However,thereareseveralcleanersourcesofwater
thatwouldbeconsideredpriortopumpingriverwaterintotheplant.
x NRCaskedifnotreferencingtheRAIresponsesintheUpdatedFLEXOIPwasanoversightorintentionally
donetonolongerfollowthem?
Duringthecallwestateditwaslikelyanoversight,andstatedwewouldtakeanotherpassthroughthe
RAIresponsesandcommunicatethecontinuedvalidityorpointtotheupdated/changedinformation
providedintheupdatedFLEXOIP.
Overall,theRAIresponsesarestillvalidwithsomeexceptionasprovidedbelow:
RAI012statesinpart:
TheonlyportableoffsitevalverequiredisthePCS/SFPmakeuppumpdischargethrottlingvalvewhichisincluded
aspartofthepumpskid.Thisvalvewillhavemanualthrottlingcapabilitywhichwillbeguidedbyaflowmeter
alsocontainedwithinthepumpskid.Itwillbemaintainedalongwiththepumpasdescribedintheresponseto
RAI011.
IdentifieddifferencewiththeRAIresponse:
Thereisnodischargethrottlingvalveonthepumpskid.Thepumpisavariablespeedpumpwhichcancontrol
theflowrateandactlikeathrottlingvalve.Therewillbeaportableflowmeterprovidedinthepumpdischarge
hosetomonitorpumpflow.
RAI0103statesinpart:
ThePCCAWSTmakeuppumpisdeterminedtohavearequiredflowrateof150gpm.
IdentifieddifferencewiththeRAIresponse:
ThePCCAWSTmakeuppumpissizedtosupportbothUnits3&4simultaneously.Itsuppliesatotalminimumof
300gpm(150gpmperunit).
UpdatedOIPSection2.19.6,N+1EquipmentRequirement,states:
N+1willbeprocuredforasingleresponsecenter.ConsistentwithNEI1206,Section3.2.2.16,3piecesof
portableequipmentwillbeprovidedwhenaseparatetrainisneededforeachunit(portablegeneratorand
PCCWSTMakeupPump)andtwopieceswillbeprovidedwhenasingletraincansupplybothunits(ultimate
makeupfromtheSavannahRiver,thecreditedsourceforVEGPUnits3and4).Thisequipmentwillbestoredat
theregionalresponsecenterinPhoenix,AZ.
TheultimatemakeuppumpfromtheriveristhePCCAWSTMakeupPumpwhichiscapableofsupplyingboth
units.
Thisisnotconsideredachangetothecompliancemethodasthepumpsareequivalenttothepreviouslyspecified
pumpsandcontinuetomeettheN+1concept.
RAI0202statesinpart:
AsdiscussedinAPPGWGLR170,theprimarystrategyfortheoffsitereplacementgeneratorsistoreplacethe
permanentlyinstalledancillarydieselgenerators.Therefore,thesamenominalgeneratorratingisselectedfor
theoffsitereplacementgeneratorsasforthepermanentlyinstalledancillarydieselgenerators(80kW,480V).
The alternate strategy, as described in APPGWGLR170 Section 9b, requires less power than the primary
strategybecausethePCSrecirculationpumps,andtheoffsiteportablepumpswouldnotbepoweredfromthe
offsiteportablegeneratorinthisalternateconfiguration.Therefore,thenominalratingof80kW/480Vis
consideredboundingfortheprimaryandalternateFLEXstrategies.
IdentifieddifferencewiththeRAIresponse:
Theoffsitereplacementgeneratorbeingprovidedforeachunitisa150kW/480Vdieseldrivengenerator.
ThisgeneratorisdiscussedinUpdatedOIPSection2.11.2.2,AlternateStrategy.
Thisisnotconsideredachangetothecompliancemethodasthegeneratorsprovidedarelarger,notdifferent.
RAI0204statesinpart:
TheAP1000post72hourproceduresspecifytheuseofpermanentlyinstallednonsafetyequipmentastheinitial
strategyforbothPCSandSFPmakeupasdescribedinAPPGWGLR170.ForthealternatestrategyforFLEX,only
portableequipmentisused.Thisportableequipmentishookeduptosafetyrelatedconnectionpointsandstored
asufficientdistancefromthesitesuchthatitwouldnotreasonablybesubjecttothesamehazardatthesite.
SincethealternateFLEXstrategiesonlyusesafetyrelatedpermanentlyinstalledconnectionpointsandportable
equipment that are expected to survive all hazards, justification that the permanently installed nonsafety
equipmentfortheinitial(primary)strategysurvivesanyhazardisnotrequired.
IdentifieddifferencewiththeRAIresponse:
Theportableequipmentishookeduptoprotectedconnectionpointsthatareeithersafetyrelatedordesigned
tobehazardrobust.
TosupportjustifyingthepermanentlyinstallednonsafetyrelatedequipmenttheUpdatedOIPsection2.9.2.2,
states:
ThePCSrecirculationpumps,theonsiteancillarydieselgenerators,andthePCCAWSTarenonsafetyrelated
components.However,thesecomponentsareruggedcomponentslocatedinnuclearseismicstructureswith
seismiccategoryIIanchorageandarelikelytobeavailableoreasilyrepairablefollowingabeyonddesignbasis
event.ThePCSrecirculationpumpsarelocatedintheseismiccategoryIauxiliarybuilding.Theonsiteancillary
dieselgeneratorsarelocatedintheseismiccategoryIIannexbuilding.ThePCCAWSTisaseismiccategoryIItank
intheyard.
Thisisnotconsideredachangetothecompliancemethodasalltheplantconnectionsareconsideredprotected
anddesignedtobesurvivable(hazardrobust).
RAI0206statesinpart:
Therefore, both the PCS recirculation pumps and the PCS/SFP offsite portable makeup pump require an
envelopingdesignflowrateof135gpm.ThePCCAWSTmakeuppumpisdeterminedtohavearequiredflowrate
of150gpm.
IdentifieddifferencewiththeRAIresponse:
ThePCCAWSTmakeuppumpissizedtosupportbothUnits3&4simultaneously.Itsuppliesatotalminimumof
300gpm(150gpmperunit).SeetheresponsetoRAI0103above.
Thisisnotconsideredachangetothecompliancemethodasthepumpsareequivalenttothepreviouslyspecified
pumpsandcontinuetomeettheN+1concept.
RAI0210statesinpart:
AlternatestrategyIntheeventthatthePCSrecirculationpumpsareunavailable,Phase3equipmentforthe
AP1000designincludesasecondselfpoweredoffsitepump(PCS/SFPmakeuppump)andappropriateconnection
materials[that]allowsmakeuptotheSFPandthepassivecontainmentcoolingwaterstoragetank(PCCWST)as
highlightedonFigure2.[]Supplytotheselfpoweredpumpwillcomefromtheclosestriver,lake,orocean
source.
AdditionalDiscussion:Forthealternatestrategy,thePCS/SFPmakeuppumpisusedinserieswiththePCCAWST
makeuppump,eitherdirectlyinseriesorindirectly(ifthePCCAWSTisstillavailable).ThePCCAWSTmakeup
pumpissizedappropriatelytodeliverwaterfromtheclosestriver,lake,oroceansource;regardlessofwhether
thedestinationisthePCCAWSTorthesuctionofthePCS/SFPmakeuppump.
IdentifieddifferencewiththeRAIresponse:
UpdatedOIPSection2.9.2.2,AlternateStrategy(modifiedfromoriginal),states:
IntheunlikelyeventthatbothPCSrecirculationpumpsareunavailable,theselfpoweredPCSrecirculationpump
equivalent,willtakesuctionfromthePCCAWSTviatheconnectionaddedtotheoverflow/drainline(Reference
66).Insteadoftheportablepumpsupplycomingfromtheclosest,river,lake,oroceansource,anddischarging
toasafetyrelated,seismicallyqualifiedflange(References48and49)usingfirehose,aseparatePCCAWST
makeuppumpwilldrawwaterfromtheSavannahRiverandprovidemakeuptothePCCAWST.Thisallows
makeuptotheSFPandthepassivecontainmentcoolingwaterstoragetank(PCCWST)ashighlightedonFigure2
ofReference2.TheminimumrequiredheadandmaximumpumpdischargeheadforthePCSrecirculationpump
equivalentisdocumentedinTable31Section11ofReference18.TheSAFERpumpswillmeetthesecriteria.
Thisisnotconsideredachangetothecompliancemethodasthestrategystillusestwopumpsandtheultimate
watersourceisstilltheriver.ThedifferencehereisthattheseismiccategoryIIPCCAWSTremainsbetweenthe
twopumpsandthestrategynolongerhasthepumpsdirectlyinseries.Thismodificationisconsideredan
operationalenhancementandstillmeetstheintentoftheoriginalstrategy.
- 3. TheNRCaskedadditionalquestionsandprovidedOEandotherthingstoconsiderfortheFIP.
x NRCaskedisthereafueloilreplenishmentstrategy?
ReferenceprocedureNMPOS019367VogtleUnitDSIG7,DieselFuelOilTransferforstrategy.
x NRCaskedisthereadequateultralowsulfurfueloilbasedontheuseoftheUnit1&2fuelsupplyfor
Unit3and4debrisclearing/towingcapability?
TheNMPOS019367procedureprovidesdirectionforresupplyoffueloilsupplyvolume.
x TheNRCsharedsomeOEaboutphaserotationconcerningconnectingbackupdiesels.
Units3&4areconsideringphaserotationinourconfigurations
x TheNRCsharedthattheoperatingfleethadtoaddresshydrogenbuildupfrombatterycharging.
ForFLEX,VEGPUnits3&4donotrechargethebatteriesinthemitigationoftheeventandthereisno
sourceofhydrogentoconsider.
x TheNRCstatedthatUnits1&2hasPMPfloodingissueswithpondingontheirhaulpathandaskedifwe
hadconsideredit?
ThereisanevaluationcompletedforUnits3&4titled,FLEXDeploymentRouteDebrisAssessment,which
isAttachment2toprocedureNMPGM038004,VEGP34DiverseandFlexibleCopingStrategies(FLEX)
ProgramDocument.Thatattachmentlooksattheeffectsofapplicableextremeexternalhazardsonthe
deploymentpathsincludingflooding.Theattachmentisbasedonthefollowingreports:
o 2316200030RM10R00003,Version1.0,VEGPUnits3and4FLEXDebrisRemoval
Assessment
o 2316200030RM10R00004,Version1.0,VEGPUnits3and4FLEXExternalHazards
Evaluation
InAttachment2oftheFLEXprogramdocumentitstates:
TheonlyprobablefloodingatVEGPwouldbeduetoextremeprecipitation.Somedebris
wouldbedeposited.Itwillbelimitedtosmallfloatingitems.Thisisconsideredminimaland
notanadverseimpacttositetravel.
x TheNRCreviewersrecalledthattheUnits1&2severeweatherprocedurehadsomeactionsforcold
weather,andtheyneededtoaddressiceconditionsfortheirhaulpaths.
ThereisanevaluationcompletedforUnits3&4titled,FLEXDeploymentRouteDebrisAssessment,which
isAttachment2toprocedureNMPGM038004,VEGP34DiverseandFlexibleCopingStrategies(FLEX)
ProgramDocument.Thatattachmentlooksattheeffectsofapplicableextremeexternalhazardsonthe
deploymentpathsincludingicing.Theattachmentisbasedonthefollowingreports:
o 2316200030RM10R00003,Version1.0,VEGPUnits3and4FLEXDebrisRemovalAssessment
o 2316200030RM10R00004,Version1.0,VEGPUnits3and4FLEXExternalHazardsEvaluation
InAttachment2oftheprogramdocumentitstates:
Icebuildupcouldconceivablyaffecttheintegrityofanonrobuststructurewithicebuildup
onrooftops,etc.Thiswouldmostlikelyresultinacollapseofasmallportionofthebuilding
withintheexistingbuildingfootprint.Althoughpartialstructuralcollapsesmayoccur,there
arenobuildingsinthetravelpaththatwouldadverselyaffecttransportation.Extremecold
andicebuildupcouldconceivablyresultindownedpowerlinesandtrees.Anydownedlines
canberemovedwiththeonsitedebrisremovalequipment.
Units1&2haveamoreurgentrequirementforusingthehaulpathstostageFLEXequipment.However,
Units3&4doesntstageFLEXequipmentforthefirst72hoursensuringadequatetimetoaddress
possibleicyroadwaysand/ordebris.
x NRCaskedwhydowetalkaboutRemoteShutdownroomin2.14butnowwhereelse?Isthatokaythat
itisn'tcoveredanywhereelse?
TheRSRisnotpartoftheflexstrategy.ThementionoftheRSRintheOIPisdescribingnormallighting
anditsassociatedpowersupplies.Thefurtherdiscussionofthestrategyisfocusedonprovidinglighting
tothecontrolroom.Noactionrequired.