Forwards Notice of Violation & Insp Rept 70-1151/98-202 on 980427-0501.Violation Involved Operation of Process Equipment W/Inoperable Criticality Safety Control
ML20249C804
Person / Time
Site: Westinghouse
Issue date: 06/26/1998
From: Ting P
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Allen J
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20249C805 List:
References
70-1151-98-202, NUDOCS 9807010219
Download: ML20249C804 (4)


Text

_ _ _ _ _ _ _. - _ _ _ _ _ - - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

["k y

t UNITED STATES j

NUCLEAR REGULATORY COMMISSION WA8HINGTON. D.C. 20665 0001 June 26, 1998 Mr. Jack Allen General Plant Manager Westinghouse Electric Corporation Commercial Nuclear Fuel Division P.O. Drawer R Columbia, S.C. 29250

SUBJECT:

NRC INSPECTION OF THE NUCLEAR CRITICALITY SAFETY CORRECTIVE ACTION PROGRAM - INSPECTION REPORT 70-1151/98-202 AND NOTICE OF VIOLATION

Dear Mr. Allen:

This refers to the Nuclear Criticality Safety (NCS) inspection conducted on April 27 - May 1, 1998, at your Columbia, South Carolina facility. The purpose of the inspection was to review your progress involving near-and long-term improvements in your NCS program and to determine whether activities authorized by your license were conducted safely and in accordance with Nuclear Regulatory Commission (NRC) requirements. At the conclusion of the inspection, 1

the findings were discussed with those members of your staffidentified in the report.

Within the areas examined, the inspection consisted of selective examinations of procedures and representative records, interviews with plant personnel, and walkdowns of selected plant activities. During the inspection, one violation of NRC requirements was identified as well as several weaknesses in the NCS corrective action plan implementation. The violation involved the operation of process equipment with an inoperable criticality safety control. The violation is of concern to the NRC because the inoperability of the control was not recognized until the condition was identified by the NRC inspectors. In addition, it raises concern over the assumptions expressed to the NRC during the pre-decisional enforcement conference concerning the interim safety of plant operations during the time that NCS corrective actions are being implemented.

As such, au are required to respond to the enclosed Notice of Violation (Notice) and should follow the instructions specified in the enclosed Notice when preparing your response. In your response, you should document the specific actions taken and any additional actions planned to prevent recurrence. After reviewing your response to this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirements.

ta Y

Qp & *W~ uydfl.Q gp' w f

9807010219 990626 s

PDR ADOCK 07001151 C

ppg,

Westinghouse Electric Corporation 2

In accordance with the requirements of 10 CFR 2.790, a copy of this letter and its enclosure will be placed in the NRC Public Document Room. Should you have any questions concerning this inspection, we would be pleased to discus. them with you.

Sincerely, Philip Ting, Chief Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70-1151 I icense No. SNM-1107

Enclosures:

1. Notice of Violation
2. NRC Inspection Report 70-1151/98-202 ce w/ enclosures: Wilbur Goodwin, Manager Regulatory Affairs j

Norman A. Kent Nuclear Criticality Safety 1

.__.________________a

V June 26, 1998 Westinghouse Electric Corporation.

In accordance with the requirements of 10 CFR 2.790, a copy of this letter and its enclosure will be placed in the NRC Public Document Room. Should you have any questions conceming this inspection, we would be pleased to discuss them with you.

Sincerely, Original signed by Garrett Smith for Philip Ting Philip Ting, Chief Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70-1151 License No. SNM-1107

Enclosures:

1. Notice of Violation
2. NRC Inspection Report 70-1151/98-202 cc w/ enclosure:

Wilbur Goodwin, Manager Regulatory Affairs Norman A. Kent Nuclear Criticality Safety DISTRIBUTION Docket File 70-1151 E. McAlpine, RIl PDR, LPDR D. Ayres, RII FCOB r/f M. Messier, T-9E10 w/o encl.

3 FCSS r/f M. Rodgers, PMDA w/o encl.

'l' NMSS r/f C. Gaskin, FCLB Case File (Westinghouse disk) 98-202-c.wes

/ g1f,e

'See previous concurrences

/)

FCOB FCOB FCOB

/

FCOB g

hb' Ting Pilarich*

JDavis' WTr ki

[/ /98 (p / ?A/98

/ /98

/ /98

/ /98 C= Lover 1.- t over & l ndosure N= No Lopy Of IICI Al, R1 CORD COPY

-c "A

June 26, 1998 6

Westinghouse Electric Corporation In accordance with the requirements of 10 CFR 2.790, a copy of this letter and its enclosure will be placed in the NRC Public Document Room. Should you have any questions concerning this inspection, we would be pleased to discuss them with you.

Sincerely, l

Original signed by Garrett Smith for Philip Ting

(

)

Philip Ting, Chief l

Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70-1151 License No. SNM-1107

Enclosures:

1. Notice of Violation l
2. NRC Inspection Report 70-1151/98-202 cc w/ enclosure:

Wilbur Goodwin, Manager Regulatory Affairs Norman A. Kent Nuclear Criticality Safety DISTRIBUTION i

Docket File 70-1151 E. McAlpine, Ril PDR, LPDR D. Ayres, RIl FCOB r/f M. Messier, T-9E10 w/o encl.

FCSS r/f M. Rodgers, PMDA w/o encl.

NMSS r/f C. Gaskin, FCLB Case File l

(Westinghouse disk) 98-202-c.wes

'See previous concurrences FCOB FCOB FCOB

/

FCOB g

hbTing Pilarich' JDavis' WT ki

[//98 h /t/./98

/ /98

/ /98

/ /98 C= Cover L= 0os er & Enclosure N= No Copy OFTICIAL RI: CORD COPY I