_ _ - _ _ _ - _ _ _ _ _ _ - - - - - _ _.
- Uco p'
UNITED STATES
- 5
{
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 20066 4001
% ***** /
June 26. 1998 MEMORANDUM TO:
Thomas H. Essig, Acting Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation
. FROM:'
Thomas A. Bergman, Senior Project Mana Generic lasues and Environmental Projects Branc i
Division of Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF MEETING HELD ON JUNE 17,1998, WITH NEl TO DISCUSS STAFF'S PRELIMINARY COMMENTS ON NEl'S GUIDANCE REGARDING THE UPDATED FSAR J
On June 17,1998, the staff held a public meeting with the Nuclear Energy Institute (NEI) at r
-NRC headquarters in Rockville, Maryland. The purpose of this meeting was to review the staff's preliminary comments on NEl's draft guidance document on updated final safety analysis
, reports (" updated FSARs") dated November 14,1997 (NEl 98-03). Attachment i lists the
- ' ~ meeting' participants. There were no handouts at the meeting.
The staff had provided their preliminary comments on NEl 98-03 in an attachment to a meeting l summary dated June 15,1998. A total of 26 comments on the NEl document were provided.
During the June 17,1998, meeting NEl indicated that they intended to incorporate the staff comments into NEl 98-03 for 22 of the 26 comments. As discussed during the meeting, the 1
remaining four staff comments require further consideration by NEl as follows:
l
. StatLCommenL #3, ' Guidance should be provided for each subject addressed in the l
' proposed generic letter"[ Attachment 1 to SECY 98-087, dated April 20,1998]
NElindicated that NEl 98-03 may not include guidance on frequency of submittals or nonconforming conditions because the requirement is clear on frequency of submittals
/){j }
. and there is already guidar.re available on nonconforming conditions. NEl also stated It f
that the treatment in NEl 98-33 of decommissioning plants was under re' view.
1.
StafLCommenL#5,
- Inch:sion of new information in updated FSAR" NEl stated that the limits on operation discussed in 10 CFR 50.34(b) were equivalent to 1
technical speedications. The staff questioned how non-technical specification systems, structures and components would be treated under this interpretation. NEl agreed that this subject required further review.
<[ k 9807010131 990626 l
PDR REV9P ER C
q w
g gp
.aaugg y iv a w
{
J T.' Essig
' 2-June 26, 1998 j.
StatLCommentM14, "Page 3, Table 1, Item 2, Guidance"[of draft NEI 98-03]
NEl stated that, in general, the staff's comment would be adopted. However, NEl proposed to limit the description in the updated FSAR to that pertaining to safety functions. The basis for this proposal is that discussion of other functions would dilute attention to the safety functions. The staff stated that such an approach was overly restrictive, and that the description in the updated FSAR needed to include more than a description of the safety functions.
Statf. Comment #23, *Page 6, Temporary Changes"[of draft NEl 98-03]
NEl stated that NEl 98-03 would include guidance that met the intent of the guidance on temporary modifications in the proposed generic letter, but that NEl would provide an attemative proposal to that in the proposed generic letter.
NEl stated that the Final Draft NEl 98-03 would be submitted for staff review and consideration for endorsement in late June or early July 1998. A meeting for July 16,1998, was tentatively scheduled for the staff to provide initial impressions of the final draft.
Attachment:
As stated cc w/att: See next page l
1 4
T.' Essig June 26, 1998 L
Statf. Comment.#14, 'Page 3, Table 1, item 2, Guidance"[of draft NEI 98-03]
NEl stated that, in general, the staff's comment would be adopted. However, NEl proposed to limit the description in the updated FSAR to that pertaining to safety functions. The basis for this proposal is that discussion of other functions would dilute attention to the safety functions. The staff stated that such an approach was overly restrictive, and that the description in the updated FSAR needed to include more than a description of the safety functions.
Staff _ Comment #23, 'Page 6, Temporary Changes"[of draft NEl 98-03]
NEl stated that NEl 98-03 would include guidance that met the intent of the guidance on temporary modifications in the proposed generic letter, but that NEl would provide an attemative proposal to that in the proposed generic letter.
NEl stated that the Final Draft NEl 98-03 would be submitted for staff review and consideration for endorsement in late June or early July 1998. A meeting for July 16,1998, was tentatively scheduled for the staff to provide initialimpressions of the final draft.
Project No. 689
Attachment:
As stated '
cc w/att: See next page i
DISTRIBUIlON: See attached page Document Name: g:\\ tab \\nei98617. sum f
SC:fGKkgK OFFICE PM:PGEB Thw FAMhicz NAME DATE 6/25/98 6/)[f98-OFFICIAL OFFICE COPY i
i I
List of Attendees Name Organization F. Akstulewicz NRC R. Bell NEl T. Bergman
'NRC B. Brady.
Virginia Power B. Cascarano -
Com Ed N. Chapman SERCH/Bechtel D. Crowe.
SNC T. Essig NRC T. Harding RG&E S. Magruder NRC E. McKenna NRC T. Pietrangelo NEl D. Rosinski Winston & Strawn J. Weil McGraw-Hill R. Wenzl NPPD D. Whitcomb WPPSS i
l i
i i
1
.~
Nuclear Energy institute Project No. 689 cc:
Mr. Ralph Beedle Ms. Lynnette Hendricks, Director Senior Vice President Plant Support and Chief Nuclear Officer Nuclear Energy institute Nuclear Energy Institute Suite 400 Suite 400 1776 "l" Street, NW 1776 "l" Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Programs Nuclear Energy Institute Suite 400 1776 "I" Street, NW Washington, DC 20006-3708 Mr. David Modeen, Director Engineering Nuclear Energy institute Suite 400 1776 "1" Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy institute Suite 400 1776 "l" Street, NW Washington, DC 20006-3708 Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Activities Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Jim Davis, Director Operations Nuclear Energy Institute Suite 400 1776 "l" Street, NW Washington, DC 20006-3708
DISTRIBUTION: Mtg. Summary w/NEl Re Updated FSAR Dated June 26, 1998 Hard copy Central File PUBLIC PGEB r/f OGC ACRS TBergman SMagruder E-Mail SCollins/FMiraglia j
RZimemrman J
BSheron JRoe DMatthews FAkstulewicz GMizuno 4
MMarkley RWeisman WReckley EMcKenna EWang 1.