M
.-
June 18, 1998
Mr, G. Rainey, President
PECO Nuclear
Nuclear Group Headquarters-
Correspondence Control Desk
P. O. Box 195
Wayne, PA 19087-0195
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-352/98-03,50-353/98-03 -
. Dear Mr. Rainey:
This refers to the inspection conducted on March 17,1998, through May 18,1998, at
lyour Limerick Units 1 and 2 reactor facilities. The enclosed report presents the results of
this inspection.
During the 9-week inspection period covered by this report, the conduct of activities at
Limerick Units 1 and 2 was generally characterized by safe and conservative operations
~
and decision making.' In particular, your operators' response to the potentially hazardous
environment in the plant that resulted in an ALERT classification was very good. ~ In general
your staffs control and oversight of refueling activities was excellent.
However, we are concerned that your operators did not enter Technical Specification 3.0.3
when both control room emergency fresh air systems were declared inoperable and this
decision wa<. supported by operations management.' Further your assessment of the
control room emergency fresh air system related issues did not identify this decision as a
problem nor identify the technical specification limiting conditions for operation entries that
- were missed.
The Radiation Protection program was found to be generally effective. Dose reduction
. efforts due to drywell shielding and hot spot flushing were effective. Continued refinement
. is warranted in electronic dosimeter alarm setpoint use and in providing effective RP
oversight and leadership in the advanced radiation worker (ARW) program.
Based on the results of this inspection, the NRC has' determined that a violation of NRC
requirements occurred. This violation is cited in the enclosed Notice of Violation (Notice)
- and the circumstances surrounding them are described in detail in the subject inspection
_
- report. The violation is of concern because it involves inaccuracies in the control room log
- which is used, in part, for configuration control of plant systems. You are required to..
respond to this letter. and should follow the instructions specified in the enclosed Notice
'when preparing your response. The NRC will use your response, in part, to determine
.
!
whether further enforcement action is necessary to ensure compliance with regulatory
\\
i:
' requirements.
f
.\\
L
. ,, e c
@Nk Sg
f
J bJ
s
.
-
L
10FFICIAL RECORD COPY
IE:01
{....._......_.........
. .
. ..
.
..
.
j
._
_ _
. _ - _ _ - - . ____
_ _ _ - _ _ _ _ _ - _ _ _ _ _ _ - _ _ - - - _ _ _ _ - _ _ _ _ _ _ _ _
_ _ _
_
_
!
.o
l
l s
.
Mr. G. Rainey
2
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosure (s),'and your response will be placed in the NRC Public Document Room
(PDR).
Sincerely,
Original Signed by:
l
Clifford J. Anderson, Chief
Projects Branch 4
Division of Reactor Projects
Docket Nos.: 50-352,50-353
Enclosures:
2. NRC inspection Report 50-352/98-03,50-353/98-03
cc w/encis:
G. Edwards, Chairman, Nuclear Review Board and Director - Licensing
. J. VonSuskil, Vice President - Limerick Generating Station
J. L. Kantner, Manager, Experience Assessment
Secretary, Nuclear Committee of the Board
Commonwealth of Pennsylvania
J
)
l
.I
!
I
.i
i
l
9
4
'
.,
Mr. G. Rainey
3
Distribution w/encis:
l
' Region i Docket Room (with concurrences)
H. Miller, RA/W. Axelson, DRA
C. Anderson, DRP
D. Florek, DRP
R. Junod, DRP
l.
NRC Resident inspector
Nuclear Safety information Center (NSIC)
'
PUBLIC
Distribution w/encts: (Via E-Mail)
8. McCabe, OEDO
R. Capra, PDI-2, NRR
inspection Program Branch, NRR (IPAS)
R. Correia, NRR
F. Talbot, NRR
-
M. Campion, ORA
j
DOCDESK
l
1
I
1
l
l
!
DOCUMENT NAME: G:\\ BRANCH 4\\ LIM \\ LIM 9803. INS
l
To receive a copy of this document, indicate in the box: "C" = Copy without
l
attachment / enc /qsure
"E" = Copy with attachment / enclosure
"N" = No copy
i
OFFICE
Rl/QRh
l
Rl/DRP
l
NAME
DF)(qk V
CAnderson e/?
,
DATE-
,0Cijn98
06/ y/98
/
OFFICIAL RECORD COPY
!
!
l
1