ML20249C167
| ML20249C167 | |
| Person / Time | |
|---|---|
| Site: | 05200002 |
| Issue date: | 06/24/1998 |
| From: | Quay T NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20249C161 | List: |
| References | |
| NUDOCS 9806260139 | |
| Download: ML20249C167 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - _ - _ - _ _ _ _ _ _ - _ _ _ _
+..r UNITED STATES NUCLEAR REGULATORY COMMISSION NOTICE OF ISSUANCE OF FINAL DESIGN APPROVAL PURSUANT TO 10 CFR PART 52, APPENDIX O SYSTEM 80+ STANDARD DESIGN ABB-COMBUSTION ENGINEERING, INC.
1 DOCKET NO.52-002 The U.S. Nuclear Regulatory Commission (NRC) has issued a revised final design approval (FDA) to ABB-Combustion Engineering, Inc. (ABB-CE) pursuant to 10 CFR Part 52, Appendix 0. This FDA allows the System 80+ standard design to be referenced in an application for a construction permit or operating license pursuant to 10 CFR Part 50, or in an application for a combined license pursuant to 10 CFR Part 52. The FDA is being revised to make it cotermi-nous with the design certification rule that was issued on May 21,1997. This FDA supersedes the FDAs dated July 26 and November 23,1994.
A copy of the revised FDA has been placed in the NRC's Public Docket Room, the Gelman Building,2120 L Street, NW., Washington, D.C. 20037, for review by interested persons.
Dated at Rockville, Maryland, this2 y of 7WE 1998.
FOR THE NUCLEAR REGULATORY COMMISSION Theodore R. Quay, Director i
Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation 1
1 E
- g'2gogg geg;;2 I
A 1
i