ML20249B376

From kanterella
Jump to navigation Jump to search
PNO-76-073:on 760414,Hartford Hosp Reported That Film Badge Worn by Nuclear Medicine Technician During Month of Mar Was Exposed to 5.52 Rems & Individual TLD Finger Dosimeter Exposed to 9.37 Rems.Event Treated as Overexposure
ML20249B376
Person / Time
Issue date: 04/14/1976
From: Dreher F, Roy G, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-76-073, PNO-76-73, NUDOCS 9806220377
Download: ML20249B376 (1)


Text

- - - - - -

~_-

- - - -ammen.a cs us

=m-

= r f

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE

--PNO-76-73 This preliminary notification constitutes EARLY notice of events of gt)Q POSSIBLE safety or public interest significance.

The information presented is as initially received without verification or evaluntion hdh5~

and is basically all that is known by OIE staff as of 3:00 P. M. on date of this notification.

IT SHOULD BE SPECIFICALLY NOTED THAT THIS

[

NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY BE DETERMINED TO BE INACCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCEMENT h).

NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEQUENTLY /

4 WILL BE ISSUED IF WARRANTED.

Facility:

Hartford Hospital Hartford, Connecticut (License No. 06-00753-04)

Subject:

OVEREXPOSURE Hartford Hospital reported to Region I on Wednesday, April 14, 1976'at 10:00 a.m. that a film badge worn by a nucicar medicine technician during the month of March was exposed to 5.52 Rems.

In addition, this individual's TLD finger dosimeter was exposed to 9.37 Rems for the same period.

Licensee initial information indicated that the individual works with diagnostic quantities of medical isotopes and that during this film l

badge period he had handled only one therapeutic quantity of iodine-i 131 (100 mil 11 curies).

Even though it does not appear that an ex-posure of this magnitude could be received at their nucicar medicine facility, the licensee is treating it as an overexposure until their investigation reveals the circumstances causing the high reading. A special inspection is scheduled for April 19-20, 1976.

I Media interest is not expected. The State of Connecticut has been and is being kept informed. A press release is not planned.

Region I, NRC, Philadelphia, Pennsylvania received notification of this g

occurrence by telephone call from the licensee on April 14, 1976 at 10:00 a.m.

1

Contact:

FADreher, IE x27261
GWRoy, IE x27261 HDThornburg, IE x27541 l

I Distribution:

Acting Chairman Rowden -

Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky C. C. Kammerer, CA G. F. Murphy, JCAE Commissioner Kennedy j

L. V. Gossick, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR J. La Fleur, ISP T. J. McTiernan, AIA I

K. R. Chapman, NMSS H. K. Shapar, ELD MNBB g d __;

Luge Transmitted:

'P Bldg H St 3 I

f mm l

~ ~ - - ~ ~ '

PRELlH1 NARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE 9906220377 76041A I.

PDR I&E PNO-76-073 PDR

__