ML20249B123

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating for May 1998 for Grand Gulf Nuclear Station,Unit 1.M-T-D Gross Thermal Energy Generations Number for Last Month Was Incorrect.Number Should Have Read 8,519,245.Rept Was Not Affected in Any Way
ML20249B123
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/15/1998
From: Eaton B
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20249B124 List:
References
GNRO-98-00052, GNRO-98-52, NUDOCS 9806220086
Download: ML20249B123 (2)


Text

.

i y

En gy operItions,Inc.

Port Gibson. MS 39150 Tel 601437 2129 Bill Eaton General Manager, P! ant Operat ons Grand Gulf Nudear Station June 15, 1998 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Attention:

Document Control Desk

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-98/00052 G:ntlemen:

In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for May 1998.

PI:ase note, last month's M-T-D Gross Thermal Energy Generulon's number was incorrect. It should have read 8,519,245. This did not effect the rest of the report in any way.

If you have any questions or require additionalinformation, please contact this office.

/

Yours truly,

[

j

%E/SDUcg attachments: 1.

Operating Status

~

2.

Average Daily Power f.evel 3.

Unit Shutdown and Power Reductions cc:

(See Next Page) l i

h l

l 6

-o i

98o6a200 6,.o613

""t i

'[DR ADOCK 06000416 l

l PDR l

t ex -____.

y n...

i

- GNRO-98/00052 Page 2 of 3 cc:

' Mr. D. C.' Hintz (w/a)

Mr. N. S. Reynolds (w/a)

Mr. Jager Smith (w/a) y Mr. H. L. Thomas (w/o) 7 Ms. K. D. Weaver (w/a)

Mr. Ellis W. Mershoff (w/a).

Regional Administrator U.S. Nuclear Regulatory Commiecion Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011 Mr. Jack Donohew, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Com:nission Mail Stop 13H3 Washington, D.C. 20555 1

1 i

i

.._--_.i___.

-.