ML20249A639
| ML20249A639 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 06/12/1998 |
| From: | Wigginton D NRC (Affiliation Not Assigned) |
| To: | Mcgaha J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20249A640 | List: |
| References | |
| TAC-MA1748, NUDOCS 9806180033 | |
| Download: ML20249A639 (3) | |
Text
Mr. John R. McGahs, Jr.
June 12, 1998 Vice Prssid:nt-Op rstions Y
Entergy Opntions, Inc.
River Bend Station P. O. Box 220 St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION, UNIT 1 - CHANGES TO THE QUALITY ASSURANCE i
PROGRAM (TAC NO. MA1748)
Dear Mr. McGaha:
By letter dated April 27,1998, Entergy Operations, Inc. requested a change to the River Bend Station Quality Assurance (QA) Manual program description pursuant to 10 CFR 50.54(a)(3).
The proposed change deletes the position of Director-Quality Programs..*ob functions for this position as previously described in the Operations QA Manual are assigned to the Quality Assu.ance Manager (Manager - QA) opon implementation.
The organizational change was evaluated with respect to Standard Review Plan (SRP) Section 17.2, "O eslity A:ssurance During the Operational Phase" and referenced review criterion in SRP 17.1. We have concluded that 1) all existing quality assurance authority and duties are retained and delineated in writing,2) the Manager-QA has no other duties or responsibilities unrelated to QA that would pruent full attention to QA matters,3) sufficient organizational freedom and independence from cost and schedule are maintained, and 4) qua!ification requirements for the Manager-QA are maintained by the continuing commitment to ANSI /ANS-3.1-1978.
The change will continue to meet the requirements of 10 CFR Part 50, Appendix B, Criterion 1,
" Organization," and applicable SRP acceptance criteria, and is therefore, acceptable. The staff's Safety Evaluation is enclosed.
Sincerely, ORIGINAL SIGNED BY:
J. Hannon for David L. Wigginton, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects ill/IV Office of Nuclear Reactor Regu!ation Docket No. 50-458
Enclosure:
Safety Evaluation cc w/ encl: See next page
{
DISTRIBUTION.
Docket File PUBLIC PD4-1 r/f J.Hannon C.Hawes D. Wigginton T. Gwynn, RIV S. Black
(
E. Adensam (EGA1)
Document Name: RBA1748.LTR d
OFC PM/PO41/
LA/PD4-1 BC/HQMB PD/hV-1 t
DWigNon/vw SBlack k JHannon NAME CHa s
DATE
(/ D /98
/, / /l /98 (p/ IV/98
[p /N/98 h NO COPY V5SrNO YES/NO YES/NO OFFICIAL RECOR'D CDPY
. 9 Y"1 ?:" ppgg pg,,
9806100033 990612 DR ADOCK 0500 4 8
em4 g
9 g
1 UNITED STATES 4
y g
j NUCLEAR REGULATORY COMMISSION e
WASHINGTON, D.C. 20006 @ 01 e% *****/
June 12, 1998 1
Mr. John R. McGaha, Jr.
Vice President - Operations Entergy Operations, Inc.
River Bond Station P. O. Box 220 St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION, UNIT 1 - CHANGES TO THE QUALITY ASSURANCE PROGRAM (TAC NO. MA1748)
Dear Mr. McGaha:
By letter dated April 27,1998, Entergy Operations, Inc. requested a change to the River Bend Station Quality Assurance (QA) Manual program description pursuant to 10 CFR 50.54(a)(3).
The proposed change deletes the position of Director-Quality Programs. Job functions for this position, as previously described in the Operations QA Manual are assigned to the Quality Assurance Manager (Manager - QA) upon implementation.
The organizational change was evaluated with respect to Standard Review Plan (SRP) Section 17.2, " Quality Assurance During the Operational Phase" and referenced review criterion in SRP 17.1, We have concluded that 1) all existing quality assurance authority and duties are retained and delineated in writing, 2) the Manager - QA has no other duties or responsibilities unrelated to QA that would prevent full attention to QA matters, 3) sufficient organizational freedom and independence from cost and schedule are maintained, and 4) qualification requirements for the Manager - QA are maintained by the continuing commitment to ANSI /ANS-3.1-1978.
The change will continue to meet the requirements of 10 CFR Part 50, Appendix B, Criterion 1,
" Organization," and applicable SRP acceptance criteria, and is therefore, acceptable. The staffs l
Safety Evaluation is enclosed.
Sincerel l
If avid L. Wigginton, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects lil/lV office of Nuclear Reactor Regulation Docket No. 50-458
Enclosure:
Safety Evaluation cc w/ encl: See next page l
l
D Mr. John R. McGaha Entergy Operations, Inc.
River Bend Station ec:
Winston & Strawn Executive Vice President and 1400 L Street, N.W.
Chief Operating Officer Washington, DC 20005-3502 Entergy Operations, Inc.
P. O. Box 31995 Manager-Licensing Jackson, MS 39286 Entergy Operations, Inc.
River Bend Station General Manager-Plant Operations P. O. Box 220 Entergy Operations, Inc.
St. Francisville, LA 70775 River Bend Station P. O. Box 220 Senior Resident inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Director-Nuclear Safety Entergy Operations, Inc.
President of West Feliciana River Bend Station Police Jury P. O. Box 220
. P. O. Box 1921 St. Francisville, LA 70775 St. Francisville, LA 70775 Vice President-Operations Support Regional Administrator, Region IV Entergy Operations, Inc.
U.S. Nuclear Regulatory Commission P. O. Box 31995 611 Ryan Plaza Drive, Suite 1000 Jackson, MS 39286-1995 Arlington,TX 76011 Attomey General Ms. H. Anne Plettinger State of Louisiana l
.3456 Villa Rose Drive P. O. Box 94095 Baton Rouge, LA 70806 Baton Rouge, LA 70804-9095 Administrator Wise, Carier, Child & Caraway Louisiana Radiation Protection Division P. O. Box 651 P. O. Box 82135 Jackson, MS 39205 Baton Rouge, LA 70884-2135
]
l l
i 1