Forwards Insp Rept 50-346/98-05 on 980401-0512 & NOV Re Inadequate Procedures for Control of Temporary Manifold Isolation Valves
ML20249A603
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/11/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
EMV1CENT
Shared Package
ML20249A604 List:
References
50-346-98-05, 50-346-98-5, NUDOCS 9806170132
Download: ML20249A603 (4)


See also: IR 05000346/1998005

Text

_ _ _ - _ - _ _ - _ _ - _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ - _ - _ _ _ - - _ - - - - - - _

e

  1. pE 8'st UNITED STATES
  1. o,, NUCLEAR REGULATORY COMMISSION

[ o REGION til

y j 801 WARRENVILLE ROAD

e LISLE. ILLINOIS 60532-4351

.\ ***** / June 11, 1998

Mr. John K. Wood

Vice President - Nuclear

Davis-Besse Nuclear Power Station

Centerior Service Company

5501 North State Route 2

Oak Harbor, OH 43449

SUBJECT: DAVIS-BESSE INSPECTION REPORT 50-346/98005(DRP) AND

NOTICE OF VIOLATION

Dear Mr. Wood:

On May 12, i998, the NRC completed an inspection at your Davis-Besse site. The enclosed

report presents the results of that inspection.

The inspection mainly reviewed activities conducted during the eleventh refueling outage.

Generally, these activities were well planned and executed, and shutdown risk controls for

evolutions were effective. During the reactor shutdown for the outage, the operators effectively

responded to an unexpected failure of a purification demineralized. Engineering, maintenance,

and health physics support was also effective during the outage.

However, during the outage several events involving crane and rigging opervions inside

containment occurred that jeopardized equipment and personnel safety. We understand that

station personnel are assessing the collective significance of the events.

In addition, one violation of NRC requirements was identified during the inspection. The violation

pertains to inadequate procedures for the control of temporary manifold isolation valves. This

violation is of concem because adequate instructions were not provided to ensure all valves l

were properly manipulated on a temporary manifold. [ l

/

The violation is cited in the enclosed Notice of Violation, and the circumstances surrounding the '

violation are described in detail in the enclosed report. Please note that you are required to I

respond to this letter and should follow the instructions specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to determine whether further

enforcement action is necessary to ensure compliance with regulatory requirements.

l

!

l

!

I

9906170132 980611

PDR ADOCK 05000346 i

G PDR j

l  !

---__ _ - _ _ - _ - _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ ____ _____- _ __ _ ___- - ____ _ _- ____ _ _ _ __ -_-_ _ ____

.

J. Wood -2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.: 50-346

License No.: NPF-3

Enclosures: 1. Notice of Violation

2. Inspection Report

50-346/98005(DRP)

cc w/encls: J. Stetz, Senior Vice

President - Nuclear

J. Lash, Plant Manager

J. Freels, Manager

Regulatory Affairs

M. O'Reilly, First Energy

State Liaison Officer, State

of Ohio

R. Owen, Ohio Department

of Health )

'

C. Glazer, State of Ohio

Public Utilities Commission

\

l

1

l

l

i

!

l

l

.

~.- ___m_ _ ._.-_._ _ _ _ - _

I I

I

i .

I

J

l

J. Wood -2-  !

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

/s/ Marc L. Dapas for

1

Geoffrey E. Grant, Director '

Division of Reactor Projects j

L  !

Docket No.: 50-346

License No.: NPF-3

Enclosures: 1. Notice of Violation

2. Inspection Report

50-346/98005(DRP)

cc w/encis: J. Stetz, Senior Vice

- President - Nuclear -

J. Lash, Plant Manager

J. Freels, Manager

Regulatory Affairs

M. O'Reilly, First Energy

State Liaison Officer, State

of Ohio

R. Owen, Ohio Department

of Health I

C. Glazer, State of Ohio l

Public Utilities Commission

I

i

l

r

to recewe a copy of this document indicate 6n the bou *C" * Copy without attachfencl"k" * Copy with enachfenct "N" * No copp

OFFICE - Rill b Rlli

NAME 'Kozak/co i[ Grant MM /'

DATE 06/g.l /98 06////98

OFFICIAL RECORD COPY

I

e_--_-------

_ _ . _ _ - _ _ _

- _ _ - _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ .

,

..

J. Wood -3-

'

Distribution:

Project Mgr., NRR w/encls

C. Paperiello, Rlll w/encls

J. Caldwell, Rill w/encls

B. Clayton, Rlli w/encls

SRI Davis-Besse w/encis

DRP w/encls

TSS w/encls

DRS (2) w/encls

Rill PRR w/encls

PUBLIC IE-01 w/encls

Docket File w/encls

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)