Text
_ _ _ - _ - _ _ - _ _ - _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ - _ - _ _ _ - - _ - - - - - - _
- pE 8'st
UNITED STATES
e
NUCLEAR REGULATORY COMMISSION
o,,
[
REGION til
o
y
j
801 WARRENVILLE ROAD
e
LISLE. ILLINOIS 60532-4351
.\\
/
June 11, 1998
Mr. John K. Wood
Vice President - Nuclear
Davis-Besse Nuclear Power Station
Centerior Service Company
5501 North State Route 2
Oak Harbor, OH 43449
SUBJECT:
DAVIS-BESSE INSPECTION REPORT 50-346/98005(DRP) AND
Dear Mr. Wood:
On May 12, i998, the NRC completed an inspection at your Davis-Besse site. The enclosed
report presents the results of that inspection.
The inspection mainly reviewed activities conducted during the eleventh refueling outage.
Generally, these activities were well planned and executed, and shutdown risk controls for
evolutions were effective. During the reactor shutdown for the outage, the operators effectively
responded to an unexpected failure of a purification demineralized. Engineering, maintenance,
and health physics support was also effective during the outage.
However, during the outage several events involving crane and rigging opervions inside
containment occurred that jeopardized equipment and personnel safety. We understand that
station personnel are assessing the collective significance of the events.
In addition, one violation of NRC requirements was identified during the inspection. The violation
pertains to inadequate procedures for the control of temporary manifold isolation valves. This
violation is of concem because adequate instructions were not provided to ensure all valves
l
were properly manipulated on a temporary manifold.
[
l
/
The violation is cited in the enclosed Notice of Violation, and the circumstances surrounding the
I
'
violation are described in detail in the enclosed report. Please note that you are required to
respond to this letter and should follow the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to determine whether further
enforcement action is necessary to ensure compliance with regulatory requirements.
l
!
l
!
I
9906170132 980611
ADOCK 05000346
i
G
j
l
!
---__ _ - _ _ - _ - _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ ____ _____- _ __ _ ___- - ____ _ _- ____ _ _ _ __ -_-_ _ ____
.
J. Wood
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No.: 50-346
License No.: NPF-3
Enclosures:
1.
2.
Inspection Report
50-346/98005(DRP)
cc w/encls:
J. Stetz, Senior Vice
President - Nuclear
J. Lash, Plant Manager
J. Freels, Manager
Regulatory Affairs
M. O'Reilly, First Energy
State Liaison Officer, State
of Ohio
R. Owen, Ohio Department
of Health
)
'
C. Glazer, State of Ohio
Public Utilities Commission
\\
l
1
l
l
i
!
l
l
.
~.-
___m_
_ ._.-_._ _ _ _ - _
I
I
I
i
.
J
l
J. Wood
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
/s/ Marc L. Dapas for
1
Geoffrey E. Grant, Director
'
Division of Reactor Projects
j
L
Docket No.: 50-346
License No.: NPF-3
Enclosures:
1.
2.
Inspection Report
50-346/98005(DRP)
cc w/encis:
J. Stetz, Senior Vice
- President - Nuclear -
J. Lash, Plant Manager
J. Freels, Manager
Regulatory Affairs
M. O'Reilly, First Energy
State Liaison Officer, State
of Ohio
R. Owen, Ohio Department
of Health
C. Glazer, State of Ohio
Public Utilities Commission
I
i
l
r
to recewe a copy of this document indicate 6n the bou *C" * Copy without attachfencl"k" * Copy with enachfenct "N" * No copp
b
Rlli
OFFICE -
Rill
NAME
'Kozak/co i[
Grant MM
/'
DATE
06/g.l /98
06////98
OFFICIAL RECORD COPY
Ie_--_-------
_ _ . _ _ -
- _ _ - _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ .
_ _ _
..
,
J. Wood
-3-
Distribution:
'
Project Mgr., NRR w/encls
C. Paperiello, Rlll w/encls
J. Caldwell, Rill w/encls
B. Clayton, Rlli w/encls