ML20249A488
| ML20249A488 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/10/1998 |
| From: | Korb H AFFILIATION NOT ASSIGNED |
| To: | Shirley Ann Jackson, The Chairman NRC COMMISSION (OCM) |
| Shared Package | |
| ML20249A486 | List: |
| References | |
| NUDOCS 9806160487 | |
| Download: ML20249A488 (1) | |
Text
s,.
1 From:
'llelmer J. Korb* < helmerkorb@compuserve.com>
8 l
To:
WNDI.WNP9(OPA) l Dzte:
6/10/9812:04pm
- s g
up I\\
Subject:
The Millstone Nuclear Stan-Up JUN 101998 r
er
Dear NRC,
and The Honorable Dr. Shirley Jackson, N Of the This message is regarding the concern we have, citizens, in this Connecticut community, that the Nonheastern Utilities Company is going
\\
to receive the OK to resume stan-up of the Millstone plant in Waterford o
g g
4 The implications of a possible accident, even minor, outweigh the arguments of allowing this company to go on line again. It is obvious that Nonheast Utilities have had numerous violations, those that have been released to the public, which are probably a small fraction of the actual violations committed. Then considering the long arduous process of enforcing these violations over the isat few years, it is not apparent to me that this company will make an effon to continue to be compliant.
Consider the political implications, President Clinton appointing a respected, and honorable woman to the NRC, which allows an accident in the most populated pan of the USA. The USA is the most technologically respected country in the world, and if an accident should occurred, with the obvious record of Millstone, it would be complete disaster in the world view, and forever written in American history of the Clinton administration.
You have a right to demand the best possible operational conditions for a nuclear plant. Political pressure by the Connecticut politicians should not decide cur influence our need for strict compliance by a company with a history of compliance. In :;ummary, shut them down, make them rebuild or sell the plant and buy power from Canada, which we obviously don't need right now aayway. Just look at the Connecticut Yankee Plarit, which is another example by Northeast Utilities of how not to run a plant. Just accept the faa that this company does not represent the interest of the NRC or public, it is over for them.
Sincerely, Heltner Korb 9806160487 980610 PDR ADOCK 05000245 H
_________