ML20249A399
| ML20249A399 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 06/11/1998 |
| From: | Cruse C BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20249A400 | List: |
| References | |
| NUDOCS 9806160399 | |
| Download: ML20249A399 (1) | |
Text
,
CHARLES II. CRt'hE 13altirnore Gas and Electric Company Vice President Calvert Cliffs Nuclear Power Plant Nuclear Energy 1650 Cahert Cliffs Parkway Lusby. Maryland 20657 410 495-4455 l
June 11,1998 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
\\
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit No.1; Docket No. 50-317 Cycle 14. Core Onerating Limits Renort. Revision 1
&O Pursuant to Calvert Cliffs Nuclear Power Plant Technical Specification 6.6.5, the attached Revision 1 to the Unit 1, Cycle 14, Core Operating Limits Report is provided for your records. Also included for your information is Revision 0 to the Unit 1, Cycle 14, Core Operating Limits Report. This revision was only for Modes 5 and 6.
Please replace the Unit 1 Core Operating Limits Report in its entirety, with the attached Revision 1.
Should you have questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours,
/
/
' $thW
~
ppg y CliC/EMT/bjd
Attachment:
As Stated cc:
R. S. Fleishman, Esquire II. J. Miller, NRC J. E. Silberg, Esquire Resident Inspector, NRC A. W. Dromerick, NRC R.1. McLean, DNR Director, Project Directorate I-1, NRC J.11. Walter, PSC
- ?>
9006160399 900611 PDR ADOCK 05000317 P
-_