ML20249A222

From kanterella
Jump to navigation Jump to search
Mod 15 to Contract NRC-02-95-003
ML20249A222
Person / Time
Issue date: 06/10/1998
From: Fields J, Strike N
NRC OFFICE OF ADMINISTRATION (ADM), SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
To:
References
CON-NRC-02-95-003, CON-NRC-2-95-3 NUDOCS 9806160193
Download: ML20249A222 (3)


Text

e e AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1

l 3

2. AMENDMENT / MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION /PURCnASE REQ. NO. 5. PROJECT NO.

15 NMS 3 RFPA dtd. 5/29/98

'Am 101998

6. ISSUED BY CODE l 7 ADMINISTERED BY CODEI U.S. Nuclear Regulatory Commission (if other than item 6) l Division of Contracts and Property Management Washington, D.C. 20555
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION NO.

Science Applications Intern'tl Corp.

Energy and Environment Group ATTN: Ms. Niza Strike 98. DATED (SEE ITEM 11) 11251 Roger Bacon Drive Reston, Virginia 20190 10A. MODIFICATION OF CONTRACT / ORDER NO.

X NRC-02-95 003 108. DATED (SEE ITEM 13)

CODE I FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS O The above nunbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers O is extended, O is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended y one of the following methods: (a) By completing items e and 15, and returning copies of the amendnent; (b y acknowled ng receipt of this amendment on each copy of the or (c) By separate letter or te egram which i tudes a reference to the solicitation and amenchnent numbers. FAILUR effer submittea$ OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNAT I HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. ,

8 B. THE ABOVE NUMBERED CONTRACT / ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUAM TO AUTHORITY OF:

D. OTHER (Specify type of modification anri authority)

X Bi-lateral h Subsection G.3 " Indirect Cost Rates" of the contract E. IMPORTANT: Contractor O is not, 8 is required to sign this document and return 2 copies to the issuing office. A _,,,

14. DESCRIPTION OF AMENDMENT / MODIFICATION (Organized by UCF section headings, including solicitation / contract subject matter where feasible.) pp4 7 -

Please see the following page.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

l, 15A. NAM ( AND IIILE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

MGA STi2AYJ y pg ggg 7 Rgppygggyp Joyce A. Fields B T 15C. DATE SIGNED 168. U TED STATES A RI 16C. ATE SIGNED h

(Sibnatdre of perc6n authori7ed to sign) s D BY #Nb ~- - '*

(Shnafure of Contracting Officer) h [i NSN75kO-01-152-8070 30-105 STANDARD FORM 30 (REV.10 83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA 9906160193 990610 FAR (48 CFR) 53.243 PDR CONTR NRC-02-95-OO3 PDR-

NRC-02-95-003 Modification No.15 Page 2 of 3 The purpose of this modification is to revised Subsection G.3, Indirect Cost Rates (JAN 1993) of the contract. Accordingly, the following changes are hereby made:

\

1. Subsection G.3, Indirect Cost Rates (JAN 1993), paragraph (a) is revised to add the following provisional billing rites for SAIC Fiscal Years 1998 and 1999:

"Comoanv 1 SAIC Fiscal Year 1998 RATE BASE Material and Subcontract Overhead 1.8% DL COST Labor Overhead 84.4 % DL COST -

Fringe Package 1 38.2 % DL COST Fringe Package 2 35.4 % DL COST General and Administrative 10.3% Total cost Comoany 5 SAIC Fiscal Year 1998 RATE BASE Material and Subcontract Overhead 1.6% DL COST Labor Overhead 64.0 % DL COST Fringe Package 2 35.4 % DL COST General and Administrative 10.5%- Total cost F'

_C.QmpEly_f2 SAIC Fiscal Year 1998 RATE BASE Overhead Pool 39A 4.5% DL COST Fringe Package 2 35.4 % DL COST Fringe Package 5 8.9% DL COST General and Administrative 6.2% Total cost" Comoany 1 SAIC Fiscal Year 1999 RATE BASE Material and Subcontract Overhead 2.0% DL COST l Labor Overhead 84.4 % DL COST l Fringe Package 1 38.2 % DL COST Fringe Package 2 35.4 % DL COST General and Administrative 10.3% Total cost

^

l I

NRC-02-95-003 i Modification No.15 Page 3 of 3 i

Comoany 6 SAIC Fiscal Year 1999 RATE BASE Overhead Pool SA 72.0 % DL COST Overhead Pool 39A 4.5% DL COST Fringe Package 2 35.4 % DL COST Fringe Package 5 8.9% DL COST ,

General and Administrative 6.3% Total cost" ,

The changes to the contract indirect rates as set forth above do not affect the performance of the required work within the established contract cost or funding limitations.

All other terms of the contract remain unchanged.

P:\rnod15.sai ,

-- p'

)

)

i l l L. - _ - - - - - - - -