Requests Addl Info Re Application of Pipe Break Criteria for nonsafety-related/nonseismic Category I mod-energy Piping Outside Containment & Forwards SER of 970811 Response to Unresolved Items & Items from Insp Rept 50-440/97-201
ML20249A181
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/11/1998
From: Pickett D
NRC (Affiliation Not Assigned)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20249A182 List:
References
50-440-97-201, TAC-M98505, NUDOCS 9806160149
Download: ML20249A181 (4)


See also: IR 05000440/1997201

Text

  • June 11, 1998

Mr. Lcw W. Myrrs Distribution: LM rsh 1

Vice President - Nuclear, Perry PUBLIC RWessman 8 g/

i

'

Centerior Service Company PDlll-3 r" EAdensam F

P.O. Box 97, A200 GGrar JStolz

1 Perry, OH 44081 MBranch MZobler, OGC l

l

SUBJECT: REQUEST FOR ADDITIONAL INFORMATION REGARDING APPLICATION OF

PIPE BREAK CRITERIA FOR NONSAFETY-RELATED/NONSEISMIC .

CATEGORY l MODERATE-ENERGY PIPlNG OUTSIDE CONTAINMENT -

PERRY NUCLEAR POWER PLANT, UNIT NO.1 (TAC NO. M98505)

Dear Mr. Myers:

Your letter of August 11,1997 (PY-CEl/NRR-2194L), responded to unresolved items (URI) and I

inspection followup items resulting from NRC Inspection Report No. 50-440/97-201. The staff

has reviewed your response to URI 97-201-10. " Pipe Crack Criteria for Moderate-Energy Piping l

Outside Containment," and has prepared the enclosed sakty assessment. '

in the enclosed safety assessment, we have concluded that Perry's application of moderate- l

energy line break criteria for nonseismic Category I piping systems may not be consistent with

the Perry Safety Evaluation Report (NUREG-0887) nor with Standard Review Plan (SRP) i

Section 3.6.1. In addition to postulating cracks in nonseismic moderate-energy systems in  !

accordance with SRP Section 3.6.2, pipe ruptures (unless the piping is seismically supported)

'

iriitiated by an earthquake must also be postulated and evaluated for the effects of flooding on

safe shutdown equipment in addition to the effects on the ooeration of any seismic Category I

systems to which they are connected to satisfy the requirements of General Design Criterion 2,

" Design Bases for Protection Against Natural Phenomena (GDC 2)."

You are requested to provide information to demonstrate that the plant and Final Safety

Analysis Report are in compliance with the staff's position and GDC 2 as discussed in the

safety assessment. Prior to responding to this letter, please feel free to contact me if you

believe that further discussion with the staff would clarify your response. Please respond or

contact me within the next 30 days at (301) 415-1364.

Sincerely,

Original signed by:

Douglas V. Pickett, Senior Project Manager //

Project Directorate lll-3 /

Division of Reactor Projects Ill/lV

Office of Nuclear Reactor Regulation

/' /

Docket No. 50-440

Enclosure: As stated

cc: See next page

[/3/

DOCUMENT NAME:G:\ PERRY \98505REV.MEB

1 receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = _No copy

_

l OFFICE PFf' Dill-3 l E LA:PDill-3 _l C- (A)PD.PDill-3 l BC:SPLB l BC:EMEB l

NAME D_PickettD Y EBarrihill P (M RBefiamy* LMarah* RWessman*

DATE (% lt/98 ($/ll /98/ 06/ 1 /98 06/ 2 /98 06/ 2 /98

OFFICE OGC A)L O , /

NAM 3 ~71)M4[ ' /)'/f/)

. _

DATE 06//f98 / ' /,/

  • See previous currenf.e OFFICIAL RECORD COPY

-

y

9806160149 980611

PDR ADOCK 05000440

0 PDR

- - - - - _ _ _ - _

_

.

. June 11, 1998

, Mr. Lcw W. My;rs Distribution: LMarsh

Vico Pr:sid:nt - Nuclair, Psrry PUBLIC RW5ssman

'

Centerior Service Company PDill-3 r/f EAdensam

P.O. Box 97, A200 GGrant, R3 JStoiz

Perry, OH 44081 MBranch MZobler, OGC

SUBJECT: REQUEST FOR ADDITIONAL INFORMATION REGARDING APPLICATION OF

PIPE BREAK CRITERIA FOR NONSAFETY-RELATED/NONSEISMIC

CATEGORY l MODERATE-ENERGY PIPING OUTSIDE CONTAINMENT -

PERRY NUCLEAR POWER PLANT, UNIT NO.1 (TAC NO. M98505)

Dear Mr. Myers:

Your letter of August 11,1997 (PY-CEl/NRR-2194L), responded to unresolved items (URI) and

inspection followup items resulting from NRC Inspection Report No. 50-440/97-201. The staff

has reviewed your response to URI 97-201-10, " Pipe Crack Criteria for Moderate-Energy Piping

Outside Containment," and has prepared the enclosed safety assessment.

In the enclosed safety assessment, we have concluded that Perry's application of moderate-

energy line break criteria for nonseismic Category I piping systems may not be consistent with

the Perry Safety Evaluation Report (NUREG-0887) nor with Standard Review Plan (SRP)

Section 3.6.1. In addition to postulating cracks in nonseismic moderate-energy systems in

accordance with SRP Section 3.6.2, pipe ruptures (unless the piping is seismically supported)

initiated by an earthquake must also be postulated and evaluated for the effects of flooding on

safe shutdown equipment in addition to the effects on the operation of any seismic Category I

systems to which they are connected to satisfy the requirements of General Design Criterion 2,

" Design Bases for Protection Against Natural Phenomena (GDC 2),"

You are requested to provide information to demonstrate that the plant and Final Safety

Analysis Report are in compliance with the staff's position and GDC 2 as discussed in the

safety assessment. Prior to responding to this letter, please feel free to contact me if you

believe that further discussion with the staff would clarify your response. Please respond or

contact me within the next 30 days at (301) 415-1364.

Sincerely,

Original signed by:

Douglas V. P;ckett, Senior Project Manager

Project Directorate 111-3

Division of Reactor Projects Ill/IV

Office of Nuclear Reactor Regulation

Docket No. 50-440

Enclosure: As stated

ec: See next page

DOCUMENT NAME:G:\ PERRY \98505REV.MEB

Ta receive a copy of this document. Indicate in the box: "C" = Copy without enclosures *E" = Copy with enclosures *N* = No copy

OFFICE PM.PDtil-3 l fi LA:PDill-3 _l E ' (A)PD:PDill-3 l BC:SPLB l BC:EMEB l

NAME DPickett DV \ EBarnhill Flk RBellamy* LMar'sh* RWessman*

DATE (% H/98 06/ 06/ 1 /98 06/ 2 193 06/ 2 /98

.

_ . .

.

.7 m . - , - - _ _ _ - - . _ -_~

_

= .. = m7

! OFFICE OGC MO ,,

NAME '7)RtM

1 - 6V/f f)

j

DATE 06//f98 / ' //

  • Sae previous curren6e OFFICIAL RECORD COPY

l

M

l

Y ofYG W

i

. _ _ - _ >

_

_ _ _ - _ _ _ - _ _ _ _ - _ _ _ _ _ - -

, p44

'

p i UNITED STATES

s* j

2

NUCLEAR REQULATORY COMMISSION

.

WASHINGTON, D.C. 3056H001

          • [ June 11, 1998

Mr. Lew W. Myers

Vice President - Nuclear, Perry

Centerior Service Company

$ P.O. Box 97, A200

Perry, OH 44081

SUBJECT: REQUEST FOR ADDITIONAL INFORMATION REGARDING APPLICATION OF

PIPE BREAK CRITERIA FOR NONSAFETY-RELATED/NONSEISMIC

CATEGORY I MODERATE-ENERGY PIPING OUTSIDE CONTAINMENT-

PERRY NUCLEAR POWER PLANT, UNIT NO.1 (TAC NO. M98505)

Dear Mr. Ulyers:

Your letter of August 11,1997 (PY-CEl/NRR-2194L), responded to unresolved items (URI) and

inspection followup items resulting from NRC Inspection Report No. 50-440/97-201, The staff

has reviewed your response to URI 97-201-10 " Pipe Crack Criteria for Moderate-Energy Piping

Outside Containment," and has prepared the enclosed safety assessment. .

In the enclosed safety assessment, we have concluded that Perry's application of moderate-

energy line break criteria for nonseismic Category i piping systems may not be consistent with

the Perry Safety Evaluation Report (NUREG-OSJ7) nor with Standard Review Plan (SRP)

Section 3.6.1. In addition to postulating cracks in nonseismic moderate-energy systems in

accordance with SRP Section 3.6.2, pipe ruptures (unless the piping is seismically supported)

initiated by an earthquake must also be pr stulated and evaluated for the effects of flooding on

safe shutdown equipment in addition to the effects on the operation of any seismic Category I

systems to which they are connected to satisfy the requirements of General Design Criterion 2,

" Design Bases for Protection Against Natural Phanoinena (GDC 2)."

You are requested to provide information to demonstrate that the plant and Final Safety

Analysis Report are in compliance with the staff's position and GDC 2 as discussed in the

safety assessment. Prior to responding to this letter, please feel free to contact me if you

believe that further discussion with the staff would clarify your response. Please respond or

contact me within the next 30 days at (301) 415-1364.

Sincerely,

T r_u \/ O

Douglas V. Pickett, Senior Project Manager

Project Directorate 111-3

Division of Reactor Projects lil/IV

Office of Nuclear Reactor Regulation

Docket No. 50-440

Enclosure: As stated

cc: See next page

_ l

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ - _ _

.

.

.

, L. Myers Perry Nuclear Power Plant, Units 1 and 2

Centerior Service Company -

cc:

Jay E. Silberg, Esq. James R. Williams

Shaw, Pittman, Potts & Trowbridge Chief of Staff

2300 N Street, NW. Ohio Emergency Management Agency

. Washington, DC 20037 2855 West Dublin Granville Road

Columbus, OH 43235-7150

- Mary E. O'Reilly

Centerior Energy Corporation Mayor, Village of Perry

300 Madison Avenue 4203 Harper Street

Toledo, OH 43652 Perry, OH 44081

Resident inspector's Office Roy P. Lessy, Jr.

U.S. Nuclear Regulatory Commission Akin, Gump, Strauss, Hauer

P.O. Box 331 and Feld, L.L.P.

Perry, OH 44081-0331 1333 New Hampshire Ave., NW.

Suite 400

Regional Administrator, Region 111 Washington, DC 20036

U.S. Nuclear Regulatory Commission

801 Warrenville Road Radiological Health Program

Lisle, IL 60532-4531 Ohio Department of Health

P.O. Box 118

Lake County Prosecutor Columbus, OH 43266-0118

Lake County Administration Bldg.

105 Main Street Ohio Environmental Protection

Painesville, OH 44077 Agency )

DERR-Compliance Unit i

Sue Hiatt ATTN: Mr. Zack A. Clayton

OCRE Interim Representative P.O. Box 1049

8275 Munson Columbus, OH 43266-0149

Mentor, OH 44060

Chairman

Terry J. Lodge, Esq. Perry Township Board of Tiustu 3

S18 N. Michigan Street, Suite 105 3750 Center Road, Box 65

Toledo, OH 43624 Perry, OH 44081

Ashtabula County Prosecutor State of Ohio

25 West Jefferson Street Public Utilities Commission

Jeffe' son, OH 44047 East Broad Street

Columbus, OH 43266-0573

Henry L. Hegrat

Regulatory Affairs Manager William R. Kanda, Jr., Plant Manager

Cleveland Electric illuminating Co. Cleveland Electric illuminating Co. l

Perry Nuclear Power Plant Perry Nuclear Power Plant  ;

P.O. Box 97, A2h P.O. Box 97, SB306 l

l

Perry, OH 44081 Perry, OH 44081 l

I

- -- --

- _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _

,. .

.

. -2-

cc: (continued)

Donna Owens, Director

Ohio Department of Commerce

Division of Industrial Compliance

Bureau of Operations & Maintenance

6606 Tussing Road

P.O. Box 4009

Reynoldsburg, OH 43068-9009

Mayor, Village of North Perry

North Perry Village Hall

- 4778 Lockwood Road

North Perry Village, OH 44081

Attomey General

Department of Attorney General

.30 East Broad Street

Columbus, OH 43216

l

,

,

,