ML20249A181
| ML20249A181 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 06/11/1998 |
| From: | Pickett D NRC (Affiliation Not Assigned) |
| To: | Myers L CENTERIOR ENERGY |
| Shared Package | |
| ML20249A182 | List: |
| References | |
| 50-440-97-201, TAC-M98505, NUDOCS 9806160149 | |
| Download: ML20249A181 (4) | |
See also: IR 05000440/1997201
Text
June 11, 1998
8 g/
Mr. Lcw W. Myrrs
Distribution:
LM rsh
1
Vice President - Nuclear, Perry
PUBLIC
RWessman
i
Centerior Service Company
PDlll-3 r"
EAdensam
F
'
P.O. Box 97, A200
GGrar
JStolz
1
Perry, OH 44081
MBranch
MZobler, OGC
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING APPLICATION OF
PIPE BREAK CRITERIA FOR NONSAFETY-RELATED/NONSEISMIC
CATEGORY l MODERATE-ENERGY PIPlNG OUTSIDE CONTAINMENT -
.
PERRY NUCLEAR POWER PLANT, UNIT NO.1 (TAC NO. M98505)
Dear Mr. Myers:
Your letter of August 11,1997 (PY-CEl/NRR-2194L), responded to unresolved items (URI) and
inspection followup items resulting from NRC Inspection Report No. 50-440/97-201. The staff
has reviewed your response to URI 97-201-10. " Pipe Crack Criteria for Moderate-Energy Piping
Outside Containment," and has prepared the enclosed sakty assessment.
'
in the enclosed safety assessment, we have concluded that Perry's application of moderate-
energy line break criteria for nonseismic Category I piping systems may not be consistent with
the Perry Safety Evaluation Report (NUREG-0887) nor with Standard Review Plan (SRP)
i
Section 3.6.1. In addition to postulating cracks in nonseismic moderate-energy systems in
accordance with SRP Section 3.6.2, pipe ruptures (unless the piping is seismically supported)
'
iriitiated by an earthquake must also be postulated and evaluated for the effects of flooding on
safe shutdown equipment in addition to the effects on the ooeration of any seismic Category I
systems to which they are connected to satisfy the requirements of General Design Criterion 2,
" Design Bases for Protection Against Natural Phenomena (GDC 2)."
You are requested to provide information to demonstrate that the plant and Final Safety
Analysis Report are in compliance with the staff's position and GDC 2 as discussed in the
safety assessment. Prior to responding to this letter, please feel free to contact me if you
believe that further discussion with the staff would clarify your response. Please respond or
contact me within the next 30 days at (301) 415-1364.
Sincerely,
Original signed by:
Douglas V. Pickett, Senior Project Manager
//
Project Directorate lll-3
/
Division of Reactor Projects Ill/lV
/' /
Office of Nuclear Reactor Regulation
Docket No. 50-440
[/3/
Enclosure: As stated
cc: See next page
DOCUMENT NAME:G:\\ PERRY \\98505REV.MEB
1 receive a copy of this document, indicate in the box: "C" = Copy without enclosures
"E" = Copy with enclosures "N" = _No copy
_
l OFFICE
PFf' Dill-3
l E
LA:PDill-3
_l C-
(A)PD.PDill-3
l
BC:SPLB l
BC:EMEB
l
NAME
D_PickettD Y
EBarrihill P (M
RBefiamy*
LMarah*
RWessman*
DATE
(% lt/98
($/ll /98/
06/ 1 /98
06/ 2 /98
06/ 2 /98
OFFICE
A)L O
/
,
NAM 3
~71)M4[ ' /)'/f/)
06/ f98
/
' /,/
DATE
/
. _
- See previous
currenf.e
OFFICIAL RECORD COPY
-
y
9806160149 980611
ADOCK 05000440
0
- - - - - _ _ _ - _
_
June 11, 1998
.
.
Mr. Lcw W. My;rs
Distribution:
LMarsh
,
Vico Pr:sid:nt - Nuclair, Psrry
PUBLIC
RW5ssman
Centerior Service Company
PDill-3 r/f
EAdensam
'
P.O. Box 97, A200
GGrant, R3
JStoiz
Perry, OH 44081
MBranch
MZobler, OGC
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING APPLICATION OF
PIPE BREAK CRITERIA FOR NONSAFETY-RELATED/NONSEISMIC
CATEGORY l MODERATE-ENERGY PIPING OUTSIDE CONTAINMENT -
PERRY NUCLEAR POWER PLANT, UNIT NO.1 (TAC NO. M98505)
Dear Mr. Myers:
Your letter of August 11,1997 (PY-CEl/NRR-2194L), responded to unresolved items (URI) and
inspection followup items resulting from NRC Inspection Report No. 50-440/97-201. The staff
has reviewed your response to URI 97-201-10, " Pipe Crack Criteria for Moderate-Energy Piping
Outside Containment," and has prepared the enclosed safety assessment.
In the enclosed safety assessment, we have concluded that Perry's application of moderate-
energy line break criteria for nonseismic Category I piping systems may not be consistent with
the Perry Safety Evaluation Report (NUREG-0887) nor with Standard Review Plan (SRP)
Section 3.6.1. In addition to postulating cracks in nonseismic moderate-energy systems in
accordance with SRP Section 3.6.2, pipe ruptures (unless the piping is seismically supported)
initiated by an earthquake must also be postulated and evaluated for the effects of flooding on
safe shutdown equipment in addition to the effects on the operation of any seismic Category I
systems to which they are connected to satisfy the requirements of General Design Criterion 2,
" Design Bases for Protection Against Natural Phenomena (GDC 2),"
You are requested to provide information to demonstrate that the plant and Final Safety
Analysis Report are in compliance with the staff's position and GDC 2 as discussed in the
safety assessment. Prior to responding to this letter, please feel free to contact me if you
believe that further discussion with the staff would clarify your response. Please respond or
contact me within the next 30 days at (301) 415-1364.
Sincerely,
Original signed by:
Douglas V. P;ckett, Senior Project Manager
Project Directorate 111-3
Division of Reactor Projects Ill/IV
Office of Nuclear Reactor Regulation
Docket No. 50-440
Enclosure: As stated
ec: See next page
DOCUMENT NAME:G:\\ PERRY \\98505REV.MEB
Ta receive a copy of this document. Indicate in the box:
"C" = Copy without enclosures *E" = Copy with enclosures *N* = No copy
OFFICE
PM.PDtil-3
l fi
LA:PDill-3
_l E ' (A)PD:PDill-3
l
BC:SPLB l
BC:EMEB
l
NAME
DPickett DV \\
EBarnhill Flk
RBellamy*
LMar'sh*
RWessman*
DATE
(% H/98
06/
06/ 1 /98
06/ 2 193
06/ 2 /98
.
_ . .
.7
m
. - , - -
_ _ _ - - . _ -_~
= ..
=
m7
.
_
!
OFFICE
MO
,,
'7)RtM - 6V/f f)
NAME
1
06/ f98
/
' //
DATE
/
j
- Sae previous
curren6e
OFFICIAL RECORD COPY
M
l
l
Y ofYG W
i
. _ _ -
_
>
_
_ _ _ - _ _ _ - _ _ _ _ - _ _ _ _ _ - -
p44
,
'
p
i
UNITED STATES
s
j
NUCLEAR REQULATORY COMMISSION
2
WASHINGTON, D.C. 3056H001
.
- [
June 11, 1998
Mr. Lew W. Myers
Vice President - Nuclear, Perry
Centerior Service Company
$
P.O. Box 97, A200
Perry, OH 44081
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING APPLICATION OF
PIPE BREAK CRITERIA FOR NONSAFETY-RELATED/NONSEISMIC
CATEGORY I MODERATE-ENERGY PIPING OUTSIDE CONTAINMENT-
PERRY NUCLEAR POWER PLANT, UNIT NO.1 (TAC NO. M98505)
Dear Mr. Ulyers:
Your letter of August 11,1997 (PY-CEl/NRR-2194L), responded to unresolved items (URI) and
inspection followup items resulting from NRC Inspection Report No. 50-440/97-201, The staff
has reviewed your response to URI 97-201-10 " Pipe Crack Criteria for Moderate-Energy Piping
Outside Containment," and has prepared the enclosed safety assessment.
.
In the enclosed safety assessment, we have concluded that Perry's application of moderate-
energy line break criteria for nonseismic Category i piping systems may not be consistent with
the Perry Safety Evaluation Report (NUREG-OSJ7) nor with Standard Review Plan (SRP)
Section 3.6.1. In addition to postulating cracks in nonseismic moderate-energy systems in
accordance with SRP Section 3.6.2, pipe ruptures (unless the piping is seismically supported)
initiated by an earthquake must also be pr stulated and evaluated for the effects of flooding on
safe shutdown equipment in addition to the effects on the operation of any seismic Category I
systems to which they are connected to satisfy the requirements of General Design Criterion 2,
" Design Bases for Protection Against Natural Phanoinena (GDC 2)."
You are requested to provide information to demonstrate that the plant and Final Safety
Analysis Report are in compliance with the staff's position and GDC 2 as discussed in the
safety assessment. Prior to responding to this letter, please feel free to contact me if you
believe that further discussion with the staff would clarify your response. Please respond or
contact me within the next 30 days at (301) 415-1364.
Sincerely,
T r_u
\\/
O
Douglas V. Pickett, Senior Project Manager
Project Directorate 111-3
Division of Reactor Projects lil/IV
Office of Nuclear Reactor Regulation
Docket No. 50-440
Enclosure: As stated
cc: See next page
_
l
- _ _ _ _ _ _ _ _ _ _ _
_ _ _ . - _ - _ _
.
.
.
L. Myers
Perry Nuclear Power Plant, Units 1 and 2
,
Centerior Service Company -
cc:
Jay E. Silberg, Esq.
James R. Williams
Shaw, Pittman, Potts & Trowbridge
Chief of Staff
2300 N Street, NW.
Ohio Emergency Management Agency
. Washington, DC 20037
2855 West Dublin Granville Road
Columbus, OH 43235-7150
- Mary E. O'Reilly
Centerior Energy Corporation
Mayor, Village of Perry
300 Madison Avenue
4203 Harper Street
Toledo, OH 43652
Perry, OH 44081
Resident inspector's Office
Roy P. Lessy, Jr.
U.S. Nuclear Regulatory Commission
Akin, Gump, Strauss, Hauer
P.O. Box 331
and Feld, L.L.P.
Perry, OH 44081-0331
1333 New Hampshire Ave., NW.
Suite 400
Regional Administrator, Region 111
Washington, DC 20036
U.S. Nuclear Regulatory Commission
801 Warrenville Road
Radiological Health Program
Lisle, IL 60532-4531
Ohio Department of Health
P.O. Box 118
Lake County Prosecutor
Columbus, OH 43266-0118
Lake County Administration Bldg.
105 Main Street
Ohio Environmental Protection
Painesville, OH 44077
Agency
)
DERR-Compliance Unit
i
Sue Hiatt
ATTN: Mr. Zack A. Clayton
OCRE Interim Representative
P.O. Box 1049
8275 Munson
Columbus, OH 43266-0149
Mentor, OH 44060
Chairman
Terry J. Lodge, Esq.
Perry Township Board of Tiustu 3
S18 N. Michigan Street, Suite 105
3750 Center Road, Box 65
Toledo, OH 43624
Perry, OH 44081
Ashtabula County Prosecutor
State of Ohio
25 West Jefferson Street
Public Utilities Commission
Jeffe' son, OH 44047
East Broad Street
Columbus, OH 43266-0573
Henry L. Hegrat
Regulatory Affairs Manager
William R. Kanda, Jr., Plant Manager
Cleveland Electric illuminating Co.
Cleveland Electric illuminating Co.
l
Perry Nuclear Power Plant
Perry Nuclear Power Plant
P.O. Box 97, A2h
P.O. Box 97, SB306
l
l
Perry, OH 44081
Perry, OH 44081
l
I
- -- --
- _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ - _ _ _
_ _ - _
.
,.
.
-2-
.
cc: (continued)
Donna Owens, Director
Ohio Department of Commerce
Division of Industrial Compliance
Bureau of Operations & Maintenance
6606 Tussing Road
P.O. Box 4009
Reynoldsburg, OH 43068-9009
Mayor, Village of North Perry
North Perry Village Hall
- 4778 Lockwood Road
North Perry Village, OH 44081
Attomey General
Department of Attorney General
.30 East Broad Street
Columbus, OH 43216
l
,
,
,