Forwards Insp Rept 50-271/98-04 on 980315-0502 & Notice of Violation Re Vital Area Access Control Problem Identified by NRC Inspectors During Tour of Facility
ML20249A114
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/04/1998
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Maret G
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20249A115 List:
References
50-271-98-04, 50-271-98-4, NUDOCS 9806160073
Download: ML20249A114 (3)


See also: IR 05000271/1998004

Text

. . _

-

-

-

q

h

r

,

t-y

I

I

l

H

i

l

June 4,1998

-

o

Mr. Gregory A. Maret

Director of Operations

l

Vermont Yankee Nuclear Power Corporation

l

RD 5, Box 169

'

Ferry Road

Brattleboro, Vermont .05301'

i

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-271/98-04 AND NOTICE OF

l

VIOLATION

Dear Mr. Maret:

,

' On May 2,1998, the NRC completed an inspection at your Vermont Yankee reactor

facility. The enclosed report presents the results of that inspection.

.

During the majority of the seven week period covered by this inspection period, you have

been conducting a refueling outage. Overall plant activities were conducted safely,

including the transition from power operations through establishing the shutdown

conditions required to support the outage. During this period two violations of NRC

requirements that were identified. The first violation involved a short circuit of one of the

main station batteries during a test evolution that was, in part, a result of inadequate

oversight of that activity by station personnel. In addition, we noted that you experienced

problems with control of contractors during the torus project during the outage. The

second violation involved a vital area access control problem identified by the NRC

inspectors during a tour of the facility. Each of these problems was either self-revealing or

identified by NRC inspectors during tours of your station. Although you took aggressive

corrective action for each of these events, we are concerned about the oversight of station

'

activities by Vermont Yankee personnel during the outage. Your continued management

attention is warranted.

The violations are cited in the enclosed Nctice of Violation, and the circumstances

' surrounding the violations are described ir. detail in the enclosed report. Please note that

you'are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

1

to determine whether further enforcement action is necessary to ensure compliance with

- regulatory requirements.

-i

(

The response directed by this letter and the enclosed Notice are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511. In accordance with 10 CFR 2.790

of the NRC's " Rules of Practices," a copy of this letter and its enclosures will be placed in

the NRC Public Document Room.

,

L

,so6160073 9eo604

4;d

PDR

ADOCK o50o0271

lV

e

PDR

.

- - - _ _ - _ - _ - _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ __

__.

.

.

Mr. Gregory A. Maret

2

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter

and the enclosed Notice will be placed in the NRC Public Document Room.

Sincerely,

Original Signed By:

Curtis J. Cowgill, Chief

Reactor Projects Branch 5

Division of Reactor Projects

Docket No. 50-271

. Enclosure:

1.

Notice of Violation

2.

NRC Inspection Report 50-271/98-04

cc w/ encl:

R. McCullough, Operating Experience Coordinator - Vermont Yankee

G. Sen, Licensing Manager, Vermont Yankee Nuclear Power Corporation

D. Rapaport, Director, Vermont Public Interest Research Group, Inc.

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts

D. Lewis, Esquire

G. Bisbee, Esquire

J. Block, Esquire

T. Rapone, Massachusetts Executive Office of Public Safety

,

D. Katz, Citizens Awareness Network (CAN)

'

M. Daley, New England Coalition on Nuclear Pollution, Inc. (NECNP)

, State of New Hampshire, SLO Designee

State of Vermont, SLO Designee

i

Commonwealth of Massachusetts, SLO Designee

)

..

,

I

i

_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ . . _ _ _

_

_

.j

_ _ _ _ _ _ __ _ __ - _

_ - _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _

_

_ _ _ _

___

.

Mr. Gregory A. Maret

3

Distribution w/ encl:

Region 1 Docket Room (with concurrences)

,

l

PUBLIC

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

H. Miller, RA/W. Axelson, DRA

D. Screnci, PAO

!

l

G. Morris, DRS

C. Cowgill, DRP

I

R. Summers, DRP

l

C. O'Daniell, DRP

l

R. Nimitz, DRS

j

Distribution w/enci (VIA E-MAIL):

B. McCabe, OEDO

C. Thomas, NRR (COT)

!

R. Croteau, NRR

R. Correia, NRR

l

F. Talbot, NRR

inspection Program Branch, NRR (IPAS)

DOCDESK

l

I

i

,

!

!

DOCUMENT NAME:

Ta receive a copy of this document, indcate in the box: 'C' = Copy without attachment / enclosure

'E" = Copy with attachment / enclosure

'N'=

l

No copy

)

OFFICE

Rl/DRP[]()

l,

/

l

/

l

l

I

NAME-

CCowgillV 4, ii m/

DATE

06/04/98 1I 'l5

06/ /98

06/ /98

06/ /98

06/ /98

OFFICIAL RECORD COPY

-

l

- - - _ _ _ _ - . _ _ _ _ _ _ _ _ - -

)