Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-IV-97-066, on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed1997-11-17017 November 1997 PNO-IV-97-066:on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed PNO-IV-97-067, on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee1997-11-17017 November 1997 PNO-IV-97-067:on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee PNO-IV-97-061, on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed1997-10-30030 October 1997 PNO-IV-97-061:on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed PNO-IV-97-003, on 970104,shut Down to Mode 3 to Troubleshoot & Repair FW Isolation Valve Hydraulic Actuator Pump Was Greater than 72 Hr.State of Tx Will Be Informed1997-01-0606 January 1997 PNO-IV-97-003:on 970104,shut Down to Mode 3 to Troubleshoot & Repair FW Isolation Valve Hydraulic Actuator Pump Was Greater than 72 Hr.State of Tx Will Be Informed PNO-IV-93-036, on 931120,hot Particle Detected Below Knee of Contract Decontamination Technician.Initial Dose Estimates Using Varskin II Methodology Was Approx 55 Rems to Skin1993-11-22022 November 1993 PNO-IV-93-036:on 931120,hot Particle Detected Below Knee of Contract Decontamination Technician.Initial Dose Estimates Using Varskin II Methodology Was Approx 55 Rems to Skin ML20059D8391993-10-28028 October 1993 PNO-IV-031A:on 931026,plant Underwent Reactor Coolant Spill Inside Containment,Flooding Up to Approx 23 Feet Above Level Reactor Vessel Flange.Licensee Has Formed Task to Determine Root Causes & Recommend Corrective Actions to Mgt PNO-IV-93-031, on 931027,pneumatic Seal Malfunctioned & Approx 16,000 Gallons of Refueling Water Spilled Into Refueling Cavity.Resident Inspectors Dispatched.State of Tx Notified1993-10-27027 October 1993 PNO-IV-93-031:on 931027,pneumatic Seal Malfunctioned & Approx 16,000 Gallons of Refueling Water Spilled Into Refueling Cavity.Resident Inspectors Dispatched.State of Tx Notified PNO-IV-90-027, on 900730,safety Injection Actuation Occurred as Result of Main Steam Line Press Low Safety Injection Actuation Signal.Caused by Rate Compensation Feature of Actuation Circuitry.Situation Being Reviewed by Licensee1990-07-31031 July 1990 PNO-IV-90-027:on 900730,safety Injection Actuation Occurred as Result of Main Steam Line Press Low Safety Injection Actuation Signal.Caused by Rate Compensation Feature of Actuation Circuitry.Situation Being Reviewed by Licensee PNO-IV-90-026A, updates Preliminary Notification Re Inadvertent Safety Injection on 900726.Initiation of All Danger Tag Clearances Suspended Until Licensee Task Team Determines Cause of Event1990-07-27027 July 1990 PNO-IV-90-026A:updates Preliminary Notification Re Inadvertent Safety Injection on 900726.Initiation of All Danger Tag Clearances Suspended Until Licensee Task Team Determines Cause of Event PNO-IV-90-026, on 900726,inadvertent Safety Injection Occurred Due to Main Steam Line Pressure Low Safety Injection Actuation Signal.Unit in Hot Standby & Licensee Restoring from Injection.State of Tx Informed1990-07-26026 July 1990 PNO-IV-90-026:on 900726,inadvertent Safety Injection Occurred Due to Main Steam Line Pressure Low Safety Injection Actuation Signal.Unit in Hot Standby & Licensee Restoring from Injection.State of Tx Informed ML20212A4991990-05-11011 May 1990 PNO-ADSP-90-013:on 900509,reactor Trip on Low SG Level. Initial Reactor Power Was 48%.Transient Was Initiated by Loss of Speed Control on Both Main Feedwater Pumps ML20212A5051990-04-25025 April 1990 PNO-ADSP-90-012:on 900424,TU Electric Synchronized Main Generator to Grid.Licensee Continuing Power Ascension Test Program ML20212A5071990-02-0909 February 1990 PNO-ADSP-90-003:on 900208,NRC Issued low-power License for Operation of Plant,Unit 1 ML20246C8351989-08-22022 August 1989 PNO-ADSP-89-006A:on 890818,util Informed NRC That Potential Tampering W/Spare Auxiliary Feedwater Pump Motor Not Evident.Foreign Matl Reported as Found in Pump Bearing Oil Sump Was Actually in Water Jacket for Pump ML20245G5361989-08-11011 August 1989 PNO-ADSP-89-006:on 890810,resident Inspector Informed of Apparent Tampering W/Spare Auxiliary Feedwater Pump Motor. Nine Inch Piece of Wire & Metal Shavings Discovered in Inboard Pump Bearing Oil Sump ML20245A0851989-06-15015 June 1989 PNO-ADSP-89-005:Investigation of Preoperational Testing Events on 890423-0505 Completed.Events Caused by Valve Misalignment & Inoperability of Borg-Warner Swing Check Valves.Rev of Reassembly Procedures Proposed ML20247F9451989-05-17017 May 1989 PNO-ADSP-89-003:on 890516,high Winds,Rain,Hail & Scattered Tornadoes Experienced in Central & Eastern Texas.Site Personnel Evacuated from Temporary Const Bldgs to Seismic Category 1 Bldgs ML20151J9501988-07-27027 July 1988 PNO-OSP-88-013:on 880827,HVAC Employee Electrocuted When Ductwork Fell,Cutting 120-volt Lighting Cable & Pinning Employee in Cable Tray When Cable Grounded Against Tray. Employee Pronounced Dead Upon Arrival ML20234D2301987-09-15015 September 1987 PNO-OSP-87-011:on 870915,severe Thunderstorm W/High Winds Caused Mobile Crane to Overturn Injuring Approx 10 People. Wind Destroyed Front Doors of Operation Administration Bldg & Windows in Five Cars.Accident Area Secured PNO-IV-85-057, on 851108,large Number of Wires in Automatic Turbine Test Control Panel Discovered Cut.Nature of Damage Suggests Act of Vandalism.Investigation Initiated1985-11-0808 November 1985 PNO-IV-85-057:on 851108,large Number of Wires in Automatic Turbine Test Control Panel Discovered Cut.Nature of Damage Suggests Act of Vandalism.Investigation Initiated ML20249A0191978-11-27027 November 1978 PNS-78-057:on 781126,RIV Notified of Explosion in Common Auxiliary Bldg in Brown & Root Qc/Craft Field Office. Explosion Caused by Explosive Device & Destroyed File Cabinent But No Structural Damage to Bldg ML20249A2171978-11-0303 November 1978 PNS-78-053:on 781103 Onsite Operator Received Telephone Call from Unidentified Male Stating Bomb Planted Inside Unit 1 Containment Bldg.Area Evacuated & Search Conducted.No Bomb Found.Police & Local FBI Notified ML20249A5551978-06-23023 June 1978 PNS-78-029:on 780622,licensee Received Bomb Threat in Ltr Sent from Glen Rose,Tx to Project Manager,Indicating That Four Bombs on Plant Site.No Bombs Found ML20151U3841977-02-28028 February 1977 PNO-77-034:on 770225,Texas Utilities Generating Co Informed Region IV Office of Incident Involving Falsification of Concrete Air Entrainment Test Records for Comanche Peak Project by RW Hunt Testing Labs Employee ML20249B5361976-05-18018 May 1976 PNO- 76-090:on 760517,failure of Portable Crane Boom Resulted in Death of Two Construction Employees.Crane Was Being Used for Movement of Personnel Bucket & Became Unbalanced & Failure of Boom Occurred 1997-11-17
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19993011999-07-16016 July 1999 Exam Repts 50-445/99-301 & 50-446/99-301 on 990618-24.Exam Results:Six Applicants for Senior Operator Licenses Passed Exams IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam ML20236G9321998-07-0202 July 1998 Notice of Violation from Insp on 980329-0509.Violation Noted:Four Examples Were Identified,Where Licensee Failed to Meet Requirement for Design of ECCS Switchover from Refueling Water Storage Tank to Containment Recirculation IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217F6051998-04-24024 April 1998 Notice of Violation from Insp on 980215-0328.Violations Noted:Corrective Actions Were Not Sufficient to Identify That Excessive Leakage in ECC Sys Check Valves During Unit 1 Cycle 6 Required Unit 1 Safety Injection Pumps Be Started ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20248L8831998-03-19019 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Licensee Failed to Document Heat Related Degredation of Unit 2,Train B Solid State Safeguards Sequencer IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 07100012/20110221998-01-16016 January 1998 Notice of Violation from Insp on 971012-1122.Violation Noted:Procedure IPO-005B,rev 2,not Appropriate to Circumstances in That Procedure Did Not Require Pressure Be Maintained Below Rc System Pressure & Temp Limits ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20198R6571998-01-16016 January 1998 Notice of Violation from Insp on 970922-25.Violation Noted: on 961029,licensee Made Changes to Emergency Plan,W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) ML20198N2071998-01-14014 January 1998 Notice of Violation from Insp on 970608-0719 & Subsequent Inoffice Reviews Concluded on 971114.Violation Noted: Procedures OPT-102A & 102B Did Not Include Appropriate Quantitative Acceptance Criteria ML20199H0131997-11-21021 November 1997 Notice of Violation from Insp on 970831-1011.Violation Noted:Thermometer IC1473,was Used During Performance of Procedure PPT-SX-7505A on 970807 ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-IV-97-067, on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee1997-11-17017 November 1997 PNO-IV-97-067:on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee PNO-IV-97-066, on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed1997-11-17017 November 1997 PNO-IV-97-066:on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle PNO-IV-97-061, on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed1997-10-30030 October 1997 PNO-IV-97-061:on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20211A0691997-09-19019 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970507,while Performing Procedure OPT-457B,licensed Operator Failed to Close Valve 2-8812A Per Step 8.8 ML20198G1821997-09-12012 September 1997 Notice of Violation from Investigation on 970606.Violation Noted:Mn Shook Submitted Falsified Info to NRC Re Being Denied Access to Nuclear Power Plant as Result of fitness-for-duty Policy 1999-09-14
[Table view] |
Text
..
p y Q pg Qykffp o
4 'y, .
l ,
i PRELIMINARY NOTIFICATION
)
November 27, 1978
,-3 PRELIMINARY NOTIFICATION OF SAFEGUARDS EVENT-- PNS-73-57 7 .
This preliminary notification constitutes EARLY notice of events of POSSIBLE '
national security or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff as of this date.
FACILITY: Comanche Peak Steam Electric Station, Units 1 & 2 Texas Utilities Generating Company (DNs 50-445 and 50-446)
Somerville, Texas
SUBJECT:
Explosion at Reactor Construction Site At 7:30 p.m. on November 26, 1978, the TUGC0 Plant Superintendent, Operations, notified RIV (Arlington) of an explosion in the Common Auxiliary Building in a Brown and Root QC/ Craft field office. He stated that the explosion, caused by an explosive device', occurred at approximately 4:30 p.m. on November 26, 1978. He further stated that the explosion destroyed a file cabinet but there had been no structural damage to the building, no fire and no one had been injured.
9 'The licensee notified the local sheriff's cffice and a bomb squad from Waco, Texas was alerted.
The Resident Inspector called the RIV office at 7:45 a.m. on November 27, ,
/
1978, to report later findings. He reported, that according to the l
B&R Project Manager and the TUGC0 Resident Manager, the explosion had been caused by a leaking butane bottle. The leaking bottle and several other bottles were stored in Room #168 of the Common Auxiliary Building on the Unit No. 2 side. An explosive concentration resulted from the d(7 leakage and was apparently ignited by temporarily rigged quartz halide lights.. :
The Dallas office of the FBI was notified on November 26, 1978, and the local Bureau of Alcohol, Tobacco and Firearms was notified on November 27, 1978, by the RIV staff. Both were apprised of the later findings on November 27, 1978.
No press release was made or is planned by the licensee or the NRC.
The site construction progress is currently reported as 60 percent completed. There is no SNM on site.
I The IAT was notified.
~
(Continued)
J 9806150323 781127 PDR l I&E l PNS-78-37 PDR M n w y.,. , - py ,,,
, ,y,,, 7
,.m.mg.,,r m y c vv4 ..~
,ni=y
1%
i*
l Prelimnary Notification i PN5-78-57 l k November 27, 1978 l Continued -
Contact:
NErvin, IE x28080, DChapell, IE x 28080 EMHoward IE x 27650 l
Distribution: Transmitted H St /.'.l f Chairman Hendrie Cormiissioner Bradford S. J. Chilk, SECY Commissioner Kennedy Commissioner Ahearne C. C. Kammerer, CA Commissioner Gilinsky (ForDistribution)
Transmitted: MNBB /,'26 P Bldg /.'27 IE L. V. Gossick, EDO H. R. Denton, NRR J. G. Davis Region g , //J,2.
S. H. Hanauer, ED0 R. C. DeYoung, NRR J. J. Fouchard, PA R. J. Mattson, NRR N. M. Haller, MPA V. Stello, NRR (MAIL)
R. G. Ryan, OSP R. S. Boyd, NRR J. J. Cummings, 0IA H. K. Shapar, ELD R. Minogue, SD C. V. Smith, NMSS w ,
l
- l. -
L _
1 PRELIMINARY NOTIFICATION
[
p - - --
U________________________
~m. , . . . . ,,.,-, m _._ - - . --~_.m.--..- -" ~ "~'m3 b