ML20248M283
| ML20248M283 | |
| Person / Time | |
|---|---|
| Site: | 05000139 |
| Issue date: | 06/11/1998 |
| From: | Weiss S NRC (Affiliation Not Assigned) |
| To: | Denton D WASHINGTON, UNIV. OF, SEATTLE, WA |
| Shared Package | |
| ML20248M284 | List: |
| References | |
| 50-139-98-201, NUDOCS 9806150250 | |
| Download: ML20248M283 (4) | |
See also: IR 05000139/1998201
Text
Dr. D:nisa Drnton, Dsan,
June'11, 1998
k
Collign cf Enginstring
Univ rsity of Washington
371 Loaw Hall MSFH 10
Seattle, WA 98195
SUBJECT:
NRC INSPECTION REPORT NO. 50-139/98-201
Dear Dr. Denton:
On May 14,1998, the NRC conducted an inspection of the University of Washington
Nuclear Reactor Facility. The enclosed report presents the results of that inspection.
Various aspects of your safety program were inspected including selective examinations of
procedures and representative records, interviews with personnel, and observation of the
facility. No major problems were noted during the inspection.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, please contact us.
Sincerely,
ORIGINAL SIGNED BY:
Seymour H. Weiss, Director
Non-Power Reactor and Decommissioning
l
Project Directorate
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Docket No.: 50-139
,
License No.: R-73
.
Enclosure:
NRC Inspection Report No. 50-139/98-201
cc w/ enclosure: See next page
<
DISTRIBUTION:
HARD COPY
E-MAIL COPY
'
Docket File 50-139
AAdams
- PUBLIC
TBurdick
PDND r/f
PDoyle
- SWeiss :
TDragoun
/
EHylton
WEresian
l
BJones
SHolmes
JRoe-
.
Pisaac
j
TMichaels
wcU27
MMendonca
h I[)/
-- CBassett
F }
DScrenci, Public Affairs Officer (2)
Dean, OEDO
Nuclear Safety informatiors enter
DISP /PMIB (Cover letter & Open items forms)
- PDND:R
PDND:PMh P
.A
PDND:D
CBasset
TMichaels -
-'
ton
SWeiss
--~~"
(p [I[ /98
6ht/98 .
6/ /f/98
//t /98
@% We
OFFICIAL RECORD COPY
DOCUMENT NAMF G\\SFCY\\RARRETT\\UW98201. CHB
9906150250 980611
ADOCK 05000139
e
.;m
Dr. Denise Denton, Dean,
June 11, 1998
College of Engineering
University of Washington
371 Loew Hall MSFH-10
-
'
Seattle, WA 98195
SUBJECT:
NRC INSPECTION REPORT NO. 50-139/98-201
!
Dear Dr. Denton:
On May 14,1998, the NRC onducted an inspection of the University of Washington
Nuclear Reactor Facility. Tt* enclosed report presents the results of that inspection.
Various aspects of your safety program were inspected including selective examinations of
procedures and representative records, interviews with personnel, and observation of the
facility. No major problems were noted during the inspection.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, please contact us.
Sincerely,
ORIGINAL SIGNED BY:
Seymour H. Weiss, Director
Non-Power Reactor and Decommissioning
Project Directorate
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Docket No.: 50-139
License No.: R-73
Enclosure:
NRC Inspection Report No. 50-139/98-201
cc w/ enclosure: See next page
DMIRIBUTION:
HARD COPY
E-Mall COPY
Docket File 50-139
AAdams
PUBLIC
TBurdick
PDND r/f
PDoyle
SWeiss
TDragoun
EHylton
WEresian
BJones
SHolmes
JRoe
Plsaac
TMichaels
MMendonca
CBassett
DScrenci, Public Affairs Officer (2)
Dean, OEDO
Nuclear Safety information Center
DISP /PMIB (Cover letter & Open items forms)
PDND:RI
PDND:PMh P
.A
PDND:D
CBasset
TMichaels
ton
SWeiss
6/sj/98
6/ /(/98
// /98
(p ([ /98
OFFICIAL RECORD COPY
I
DOCUMENT NAME: G\\SECY\\BASSETT\\UW98201. CHB
- _______
____ __ - - __ - _ _ - - - - ---
-
__
.
p nua g
,
p'-
t
UNITED STATES
i
g
,j
NUCLEAR REGULATORY COMMISSION
o
t
WASHINGTON. D.C. 2055M001
%, ...../
June 11, 1998
Dr. Denise Denton, Dean,
College of Engineering
University of Washington
371 Loew Hall MSFH-10
Seattle, WA 98195
SUBJECT:
NRC INSPECTION REPORT NO. 50-139/98-201
Dear Dr. Denton:
On May 14,1998, the NRC conducted an inspection of the University of Washington
Nuclear Reactor Facility. The enclosed report presents the results of that inspection.
Various aspects of your safety program were inspected including selective examinations of
procedures and representative records, interviews with personnel, and observation of the
facility. No major problems were noted during the inspection.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerningthis inspection, please contact us.
Sincerely,
.
Y
.
Seym ur H. Weiss, Director
Non-Power Reactor and Decommissioning
Project Directorate
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Docket No.: 50-139
License No.: R-73
Enclosure:
NRC Inspection Report No. 50-139/98-201
cc w/ enclosure: See next page
- - _ - _ _ . _ _
_ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - -
".
.
cc:
Dr. M. Carette, Assistant to the Dean
College of Engineering
University of Washington
374 Loew
Box 352180
Seattle, WA 98195-2180
Stanley Addison, Radiation Safety Officer
Environmental Health and Safety
University of Washington
Hall Health Cenu,r
Box 354400
Seattle, WA 98105-4400
Thomas DeSantis, Project Manager
Capital Projects Office
University of Washington
University Facilities Building
Box 352205
Seattle, WA 98195-2205
Test, Research, and Training
Reactor Newsletter
University of Florida
202 Nuclear Sciences Center
Gainesville, FL 32611
Mayor of City of Seattle
Seattle, WA 98104
- . _ _ -