Informs That Level 1 Setpoints,Which Support Improved Tech Specs (Its),Will Be Completed by ITS Implementation in July 1998 W/Remainder of Project to Be Completed by 981231. Revised Commitments Made by Util,Encl
ML20248M236
Person / Time
Site: Cooper 
Issue date: 06/11/1998
From: Swailes J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS980092, NUDOCS 9806150178
Download: ML20248M236 (3)


Text

._

o' h

Nebraska Public Power District kf

~

NLS980092 June 11,1998 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

Subject:

Change of Commitment Cooper Nuclear Station, NRC Docket 50-298, DPR-46

Reference:

1. Letter NLS980069 to Document Control Desk (USNRC) from J. H. Swailes I

(NPPD) dated April 16,1998, " Follow-up to Interim Report Pursuant to 10 CFR 21.21(a)(2), Cooper Nuclear Station, NRC Docket 50-298, DPR-46"

2. Letter NLS970124 to Document Control Desk (USNRC) from P. D. Graham (NPPD) dated September 29,1997, " Interim Report Pursuant to 10 CFR 21.21(a)(2), Cooper Nuclear Station, NRC Docket 50-298, DPR-46" I
3. Letter NLS970055 to Document Control Desk (USNRC) from P. D. Graham

)

(NPPD) dated March 27,1997, " Reply to a Notice of Violation, NRC Inspection Report No. 50-298/96-24, Cooper Nuclear Station, NRC Docket l

50-298, DPR-46"

4. Letter NLS970227 to Document Control Desk (USNRC) from P. D. Graham /

(NPPD) dated December 26,1997, " Change of Commitment, Cooper Nuclear Station, NRC Docket 50-298, DPR-46" f

In Reference 1, the Nebraska Public Power District (District) provided closure to the interim 10 h/

CFR Part 21 submitted to the Commission on September 29,1997 (Reference 2), and established new dates for the completion of the Level 1 and 2 setpoint project committed to in Reference 3.

In addition to the Level 1 setpoint calculations being done in support ofImproved Technical Specifications (ITS), the District committed by letter dated March 27,1997 (Reference 3), to review and update all Level 2 setpoints, and their associated calculations, by December 31,1997.

However, this project could not be completed until the potential 10 CFR Part 21 issue as described in references 1 and 2 was resolved. The District informed the Commission of this commitment change in Reference 4 and committed to providing a new completion date for the Level 1 and 2 setpoint project as part of the closure to the potential 10 CFR Pan 21 issue.

9806150178 980611 PDR ADOCK 05000298 i

P PDR PowerfulM de in Nebraska J J I'

,= ==== w== ;==

= = =, = = = = = = = = = = = = = = = = = - --

t.'

NLS980092 Page 2 of 2 Accordingly, the Level 1 setpoints, which are those supporting ITS, will be completed for ITS implementation in July 1998, with the remainder of the project to be completed (i.e., the Level 2 setpoints) by December 31,1998. Since this project is, in effect, a validation and reconstitution of 1

the design basis supporting previously reviewed and approved setpoints, this delay in the project completion has no safety significance.

Should you have any questions concerning this matter, please contact me.

I Sincerely, O

a J.

. Sw ' d

- Vi e Presi t

uclear En

/nr cc: Regional Administrator USNRC - Region IV Senior Project Manager USNRC - NRR Project Directorate IV-1 Senior Resident Inspector USNRC NPG Distribution

l ATTACHMENT 3 LIST OF NRC COMMITMENTS l

Correspondence No: NLS980092 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by.the District. They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the NLS Manager at Cooper Nuclear Station of'any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE' Complete the Level 1 setpoints supporting ITS.

July 1998 5mplete.thereviewandupdatingoftheLevel2 December 31, 1998 setpoints.

i l

l PROCEDURE NUMBER 0.42 l

REVISION NUMBER 6 l

PAGE 9 OF 13 l