Forwards SER of Topical Rept TR-105696, BWR Vessel & Internals Project,Reactor Pressure Vessel & Internals Exams Guidelines (BWRVIP-03), & Suppl by Ltrs & 970312
ML20248L732
Person / Time
Issue date: 06/08/1998
From: Lainas G
NRC (Affiliation Not Assigned)
To: Terry C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML20248L735 List:
References
TAC-M95369, NUDOCS 9806110328
Download: ML20248L732 (6)


Text

f l

Crrl Terry, BWRVIP Chairmrn l

Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093

SUBJECT:

SAFETY EVALUATION OF "BWR VESSEL AND INTERNALS PROJECT, REACTOR PRESSURE VESSEL AND INTERNALS EXAMINATION GUIDELINES (BWRVIP-03)"(TAC NO. M95369)

Dear Mr. Terry,

l The NRC staff has completed its review of the Electric Power Research Institute (EPRI) Report TR-105696, "BWR Vessel and Internals Project, Reactor Pressure Vessel and internals Examinations Guidelines (BWRVIP-03)," dated November 10,1995, as supplemented by letters dated April 16,1996, and March 12,1997. The BWRVIP-03 report was submitted as a means of providing NDE techniques and inspection standards to effectively examine susceptible BWR internal components to ensure their structural integrity.

The NRC staff has reviewed the BWRVIP-03 report and finds, in the enclosed Safety Evaluation (SE), that the guidance of the BWRVIP-03 report is acceptable for ensuring the structural integrity of internal components except for the open items discussed in the attached SE. This j

finding is based on information susmitted both orig:nally and in response to the staff's request for additional information (RAl), dated March 12,1997, that clarified the guidance in BWRVIP-03.

The staff requests that the BWRVIP resolve the items raised in this SE and to inform the staff in writing as to this resolution Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169 if you have any further questions regarding this subject.

Sincerely, i

Gus C. Lainas, Acting Director Division of Engineering Office of Nuclear Reactor Regulation

Enclosure:

As stated l

cc: See next page 3

Distribution:

j' SJCollins/FJMiraglia LCShao/MEMayfield ACRS RPZimmerman TECollins/KAKavanagh Regions TTMartin Central File NRR/EMCB Reading

-0) i GMHolahan/SFNewberry PUBLIC DOCUMENT NAME: G:\\BWRVIP\\BWRVIP03.LTR

  • See previous concurrence INDICATE IN SOX: *C"= COPY W/O ATTACHMENTIENCLOSURE *E"= COPY WIAT* ENCL. "N"=NO COPY OFFICE EMCB:DE E

EMCB:DE E

EMCB:DE E

EMCB:DE E

M j

g \\V y$p NAME MJBanic' CECarpenter' f d)

RAHermann*

KRWichman*

DATE 01/27/98

..o.1

.o1/28/98

=,y o1/29/98

=

OFFICE (A)EMCB:DE E

(A)DD:DE

[jA)D:DE h

NAME EJsullivan*

JRstrosnider Lainas

!o2/M/98 DATE o2/13/98 o2/

/98

/

/98 OFFICIAL RECORD CDPY

-* 3 E hhfV 9 bod 17 OP I

C PDR

4 Crri Tcrry, BWRVIP Chairmin Niagara Mohawk Power Company Post Office Box 63 Lycoming, NY 13093

SUBJECT:

SAFETY EVALUATION OF "BWR VESSEL AND INTERNALS PROJECT, l

REACTOR PRESSURE VESSEL AND INTERNALS EXAMINATION I

GUIDELINES (BWRVIP-03)"(TAC NO. M95369)

Dear Mr. Terry,

The NRC staff has completed its review of the Electric Power Research Institute (EPRI) Report TR-105696, "BWR Vessel and Internals Project, Reactor Pressure Vessel and Intemals Examinations Guidelines (BWRVIP-03)," dated November 10,1995, as supplemented by letters

' dated April 16,1996, and March 12,.1997. The BWRVIP-03 report was submitted as a means of providing NDE techniques and inspection standards to effectively examine susceptible BWR internal components to ensure their structural integrity.

The NRC staff has reviewed the BWRVIP-03 report and finds, in the enclosed Safety Evaluation Report (SER), that the guidance of the BWRVIP-03 report is acceptable for ensuring the structural integrity of internal components except for the open items discussed in the attached SER. This finding is based on information submitted both originally and in response to the staff's request for additional information (RAl), dated March 12,1997, that clarified the guidance in BWRVIP-03. The staff recommends that the BWRVIP resolve the items raised in this SE.

Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169 if you have any further questions regarding this subject.

Sincerely, Gus C Lainas, Acting Director Division of Engineering Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page Distribution:

' SJCollins/FJMiraglia LCShao/MEMayfield ACRS

- RPZimmerman TECollins/KAKavanagh Regions TTMartin Central File NRR/EMCB Reading GMHolahan/SFNewberry PUBLIC DOCUMENT NAME: G:\\BWRVIP\\BWRVIPO3.LTR WOICATE W SOX:"C"= COPY Ws0 ATTACHRIENT/ ENCLOSURE,"E"= COPY WlATTfENCL,"N"=NO COPY OFFICE '

EMCB:DE E

EMCB:DE -

E EMCB:DE /1 E

EMI E

NAME MJBaniC ' /N CECarpenter /) fe RAHerma KR man DATE -

/ /)[/98 l/yff98

/ /h

/ /h8 OFFICE (A)EMCB:DE E

(A)DD:DE (A)D:DE NAAAE EJSulHvan.

JRStrosnider GClainas DATE 1./h/98

/

/98

/ /98

/ /98 OFFICIAL REC D COPY 4$

C. Terry Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169 if you have any further questions regarding this subject.

Sincerely,-

Gus t.,. Lainas, Acting Director Division of Engineering Office of Nuclear Reactor Regulation

Enclosure:

As stated i

cc: See next page

' Distribution:

SJCollins/FJMiraglia LCShao/MEMayfield ACRS RPZimmerman.

TECollins/KAKavanagh Regions TTMartin

= Central File NRR/EMCB Reading GMHolahan/SFNewberry PUBLIC DOCUMENT NAME: G:\\BWRVIP\\BWRVIPC3.LTR

  • See previous concurrence INDICATE IN aOX: "C"= COPY W70 ATTACHMENTENCLOsURE, *E"= COPY W/ATT/ ENCL, "N"=NO COPY EMCB:ME E

EMCB: LPM E

EMCB:SLS E

EMCB:SC E

MJBaniC*

CECarpenter*

RAHermann*

RKWiChman*

01/27/98 01/28/98 01/28/98 01/29/98 EMCB:(A)BC E-DE:(A)DD E

D

)D E

EJSullivan*

JRStrosni inas b / /98

!$ /k/98 N

02/13/98

\\

OFFICIAL RECORD COPY

^>\\ '

l

.i 1

____________1________

MU%

g p

4 UNITED STATES g

,j NUCLEAR REGULATORY COMMISSION p

WASHINGTON, D.C. 20666-0001 49.....,o June 8,1998 CarlTerry, BWRVIP Chairman Niagara Mohawk Power Company Post Office Box 63 J

Lycoming, NY 13093

SUBJECT:

SAFETY EVALUATION OF "BWR VESSEL AND INTERNALS PROJECT, REACTOR PRESSURE VESSEL AND INTERNALS EXAMINATION GUIDELINES (BWRVIP-03)" (TAC NO. M95369)

)

Dear Mr. Terry,

The NRC staff has completed its review of the Electric Power Research Institute (EPRI) Report TR-105696, "BWR Vessel and Internals Project, Reactor Pressure Vessel (RPV) and Intemals Examinations Guidelines (BWRVIP-03)," dated November 10,1995, as supplemented by letters dated April 16,1996, and Maech 12,1997. The BWRVIP-03 report proposed guidelines for NDE techniques and inspection standards intended for voluntary implementation by BWR licensees in order to effectively examine and ensure the integrity of safety-related RPV intemal components.

The NRC staff has reviewed the BWRVIP-03 report and finds, in the enclosed Safety Evaluation (SE), that the guidance of the BWRVIP-03 report is acceptable for inspection of the subject safety-related RPV internal components except where the staff's conclusions differ from the proposed guidance, as discussed in the enclosed SE. This finding is based on information submitted both originally and in response to the staff's request for additional information (RAl),

dated March 12,1997, that clarified the guidance in BWRVIP-03. The staff has concluded that licensee implementation of the guidelines in BWRVIP-03, with modifications to address the staff's conclusions in the attached SE, will provide an acceptable level of quality for examination of the safety-related components addressed in the BWRVIP 03 document. I would like to call your attention to Section 3.4 of the attached evaluation. The BWRVIP is encouraged to expedite completion of the qualification of the inspection methods for core shroud support welds so this j

issue can be resolved as part of our review of BWRVIP-38.

l The staff requests that the BWRVIP review and resolve the issues raised in the enclosed SE, j

and incorporate the staff's conclusions into a revised BWRVIP-03 report. Please inform the staff 3

within 90 days of the date of this letter as to your proposed actions and schedule for such a j

revision. Further, the staff requests that a plant-specific commitment be made by each BWR l

licensee to implement the revised BWRVIP-03 report.

The staff also understands that the BWRVIP is presently developing a strategy for plant-specific

]

l Implementation of the approved, revised BWRVIP reports. Please inform the staff within 90 days of the date of this letter as to how BWR licensees will implement, within the existing regulatory framework, the revised BWRVIP reports such that there will be an acceptable level of l

quality for examination of the safety-related components addressed in the BWRVIP-03 report.

l I

1 l

E.

C. Terry Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169 if you have any further questions regarding this subject.

Sincerely, i

/20swb41 a

Gus C. Lainas, Acting Director

-v Division of Engineering Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page 1

t

cc:

George Jones, Executive Chairman Dana Covill, Technical Chairman BWRVIP Assessment Task BWRVIP Assessment Task Pennsylvania Power & Light GPU Nuclear l

A6-1 1 Upper Pond Road Two North Ninth Street Parsippany, NJ 07054 Allentown, PA 18101 Joe Hagan, Executive Chairman Carl Larsen, Technical Chairman BWRVIP inspection Task BWRVIP inspection Task Entergy Yankee Atomic P. O. Box 756 580 Main Street Waterloo Road Bolton, MA 01740 Port Gibson, MS 39150 Paul Bemis, Executive Chairman Vaughn Wagoner, Technical Chairman BWRVIP Integration Task BWRVIP Integration Task j

Washington Public Power Supply System Carolina Power & Light Company P. O. Box 968 One Hannover Square 9C1 North Power Plant Loop P.O. Box 1551 Richland, WA 99352-0968 Raleigh, NC 27612 Lewis Sumner, Executive Chairman John Wilson, Technical Chairman BWRVIP Mitigation Task BWRVIP Mitigation Task Southem Nuclear Operating Co.

Publi. Service Electric & Gas Co.

40 invemess Center Parkway N51 Birmingham, AL 35201 Post Office Box 236 Hancocks Bridge, NJ 08038 John Blomgren, Executive Chairman Bruce McLeod, Technical Chairman BWRVIP Repair Task BWRVIP Repair Task Commonwealth Edison Co.

Southem Nuclear Operating Co.

1400 Opus Place, Suite 600 Post Office Box 1295 Downers Grove, IL 60515-5701 40 invemess Center Parkway Birmingham, AL 35201 1

Bill Campbell, BWRVIP Vice Chairman Warren Bilanin, EPRI BWRVIP Carolina Power & Light Integration Manager P. O. Box 1551 Joe Gilman, EPRI BWRVIP Raleigh, NC 27612 Mitigation Manager Ken Wolfe, EPRI BWRVIP Robert Carter, EPRI BWRVIP Repair Manager Assessment Manager Electric Power Research Institute Greg Selby, EPRI BWRVIP P. O. Box 10412 Inspection Manager 3412 Hillview Ave.

EPRI NDE Center Palo Alto, CA 94303 P. O. Box 217097 1300 W. T. Harris Blvd.

Charlotte, NC 28221