Notifies NRC That Licensee Completed Actions Required in CAL for C-400 Cylinder Wash Operation & Target Date for Restarting Cylinder Wash Operation on or After 980316
ML20248L379
Person / Time
Site: Paducah Gaseous Diffusion Plant
Issue date: 03/13/1998
From: Polston S
UNITED STATES ENRICHMENT CORP. (USEC)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CAL-RIII-97-03, CAL-RIII-97-3, GDP-98-019, GDP-98-19, NUDOCS 9803200070
Download: ML20248L379 (2)


Text

_

N,.^

\\

USEC A GW Energy Company March 13,1998 GDP 98-019 i

U.S. Nuclear Regulatory Commission Attention: Regional Administrator - Region III 801 Warrenville Road Lisle, Illinois 60532 4351 -

l Paducah Gaseous Diffusion Plant (PGDP),

Docket No. 70-7001 Restart of C-400 Cylinder Wash Facility Pursuant to the Nuclear Regulatory Commission (NRC) Confirmatory Action Letter (CAL) No. RIII-97-003, dated February 28,1997, the purpose of this letter is to notify NRC that: 1) USEC has completed the actions required in the CAL for C-400 Cylinder Wash Operation; and'2) the target date for restartin6 the cylinder wash operation is on er after March 16,1998. The enclosure to this submittal summarizes the CAL-required actions completed for the Cylinder Wash Operation. Those CAL-required actions which were generic to the Nuclear Criticality Safety program (i.e., CAL actions 1,2, and 4) were completed as described in USEC letter dated August 19,1997, regarding the restart of C-400 Spray Booth Operation (see USEC letter GDP 97-1026).

If you have any questions regarding this submittal, please contact Larry Jackson at (502) 441-6796.

There are no new regulatory commitments in this submittal.

Sincerely, b

Steve Polston General Manager l

Paducah Gaseous Diffusion Plant Enclosure

/[ f [p cc:

(U.S. NRC Document Control Desk <

)

NRC Nesident InspeitoriPGDP" NRC Special Projects Branch

~

9803200070 980313 PDR ADOCK 07007001 C

PDR aVV 3

s-P.O. Box 1410, Paducah, KY 42001 Telephone' 502 4415803 Fax 502-4415801 http://www.usec.com l

Offices in Livermore, CA Paduci:h, KY Portsmouth, OH Washington, DC I

l ii,.

e V..

L Enclosure L

. GDP 98-019.

Page1of1--

' CONFIRMATORY ACTION LETTER REQUIREMENTS AND RESPONSES L

Tliis enclosure summarizes the results of the completed Confumatory Action Letter (CAL) requirements as they apply to C-400 Cylinder Wash Operation.

CAL Required Action 3 Revise procedures and conduct training necessary to implement the new nuclear criticality safety (NCS) controlsprior to reinitiating cylinder washing or spray booth operation.

Response

The C-400 cylinder wash and hydrostatic testing operations have been evaluated in detail by Nuclear Criticality Safety Evaluation NCSE.006.00, Rev. O, and Nuclear Criticality Safety Approvals.

NCSA.400.002.00 and NCSA.400.003.00. The procedure for the cylinder wash facility (i.e., CP4-CU-CH2110) has been revised to implement the NCSE/A requirements. An evaluation of the revised procedure was performed by conducting field walkdowns of the operation Operations personnel are being trained on the revised procedures. This training will be completed prior to restart of cylinder wash operations.

CAL Required Action -

l

.l Prior to the restart ofthe cylinder wash andspray booth operationsyou will notify the PGDP Senior

. Residentinspector.

Re'sponse l

The NRC Senior Resident Inspector has been notified of USEC's plans to resume cylinder wash operations.