Informs of Change of Commitment Re Installation of Essential Power to Z Sump Pumps,Per Licensee 971231 & s. Power Cables & Conduit Will Not Be Fully Qualified to Meet Applicable Qualification Until 1998 Refueling Outage
ML20248L241
Person / Time
Site: Cooper 
Issue date: 03/09/1998
From: Swailes J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-298-97-07, 50-298-97-12, 50-298-97-7, NLS980049, NUDOCS 9803190199
Download: ML20248L241 (3)


Text

1 y

t

' '\\

P.O. BOX B ILL NEB SKA 68321

  • 'gNebraska Public Power District Tel=""

NLS980049 i

March 9,1998 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

Subject:

Change of Commitment Cooper Nuclear Station, NRC Docket 50-298, DPR-46

Reference:

1. Letter NLS970215 to Director, Office of Enforcement (USNRC) from G. R.

Horn (NPPD) dated December 31,1997, " Reply to a Notice of Violation, NRC Inspection Report Nos. 50-298/97-07 and 97-12, Cooper Nuclear Station, NRC Docket 50-298, DPR-46"

2. Letter NLS980007 to Document Control Desk (USNRC) from P. D. Graham (NPPD) dated January 9,1998, " Response to Request for Confirmation of Commitment, Cooper Nuclear Station, NRC Docket 50-298, DPR-46" By letters dated December 31,1997, and January 9,1998 (References 1 and 2, respectively), the Nebraska Public Power District (District) committed to installing essential power to the Z sump pumps no later than March 31,1998. While modifications will be completed by March 31,1998, to provide essential power, the power cables and conduit will not be fully qualified to meet all applicable seismic requirements until prior to startup from the 1998 refueling outage. Engineering calculations, however, show the installation will remain functional following an Operating Basis Earthquake (OBE). In addition:

Interim corrective measures, as discussed in Reference 1, to eliminate the potential for water accumulation in the ofTgas system 48 inch hold up line will remain in place until the installation is fully qualified.

Contingency measures currently in place to restore power to the sump pumps using temporary cables will remain in effect until the installation is fully qualified.

J@(

E ll 1911 111lulilllilimill 9003190199 900309 Ill* * * *-

PDR ADOCK 05000298 P

PDR 4

l g h.'; y

=m w=z:

22=

wwmn== mm=zrzzwmmsmuassaswww====

==2=-

=:=r==-

m

kh'

-i NLS980049 Ma'rch 9,1998 Page 2 of 2 Should you have any questions concerning this matter, please contact me.

Sincerely, Jo

/

k V 'e re t of Nuclear Energy

/crm cc: Regional Administrator USNRC - Region IV Senior Project Manager USNRC - NRR Project Directorate IV-1 Senior Resident Inspector USNRC NPG Distribution

..k l

ATTAC}IMENT 3 LIST OF NRC COMMITMENTS l

/

Correspondence No: NLS980049 The following table identifies those actions committed to by the District in this document.

Any other actions discussed in the submittal represent intended or l

planned actions by the District. They are described to the NRC for the NPC's information and are not regulatory commitments.

Please notify the Licensing Manager i

at Cooper Nuclear Station of any questions regarding this document or any associated reg.'atory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE The power cables and conduit will be fully qualified to Prior to restart from meet all applicable seismic requirements prior to startup the 1998 refueling from the 1998 refueling outage, outage.

Interim corrective measures, as discussed in NLS970215, Commitment will be tc eliminate the potential for water accumulation in the maintained until offgas system 48 inch hold up line will remain in place installation is fully until the installation is fully qualified.

qualified.

Contigency measures currently in place to restore power Committaent will be to the sump pumps using temporary cables will remain in maintained until effect until the installation is fully qualified.

installation is fully qualified.

l PROCEDURE NUMBER 0.42 l

REVISION NUMBER 5 l

PAGE 9 OF 13 l

l L______________._________________