ML20248K393

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-266/98-07 on 980310-13,16-17,0401-02, 22-24 & 0504-05.No Violations Noted.Insp Reviewed Implementation of Inservice Insp Program for Unit 1 Refueling Outage
ML20248K393
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 06/03/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20248K396 List:
References
50-266-98-07, 50-266-98-7, NUDOCS 9806100101
Download: ML20248K393 (3)


See also: IR 05000266/1998007

Text

e

.

June 3, 1998

Mr. S. A. Patuiski

Site Vice President

Point Beach Nuclear Plant

6610 Nuclear Road

Two Rivers, WI 54241

SUBJECT: NRC INSPECTION REPORT 50-266/98007(DRS)

Dear Mr. Patulski:

On May 5,1998, the NRC completed an inspection of the inservice insp' .c ;n activities and the

part length control rod drive housing modification performed at your Pc a . t: leach Nuclear Plant,

Unit 1. The results of this inspection were discussed on that date with Mr. Cayia and other

members of your staff. The enclosed report presents the results of that inspection.

The purpose of the inspection was to review the implementation of the inservice inspection

Program for the Unit 1 refueling outage. We concluded that implementation of your Inservice

inspection Program met ASME,Section XI requirements.

In addition, this inspection reviewed activities associated with the removal and modification of

the reactor vessel head part length control rod drive housings. Your decision to remove the

part length control rod drive housings that were potentially susceptible to cracking,

demonstrated a conservative safety focus.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have conceming this inspection.

Sincerely

original /s/ J. A. Grobe

John A Grobe, Director

Division of Reactor Safety

Docket No.: 50-206

License No.: DPR-24

Enclosure: Inspection Report 50-266/98007(DRS)

See Attached Distribution

Document Name: G:\DRS\ pol 98007.DRS (SEE PREVIOUS CONCURRENCE)

v. c . .. .,

OFFICE

soc

Rlli

ua m m w c em - .n.*=nu.new. r em . .--,. v wo em

l Riti l Rlli l Rlli mf; _ l

}l

NAME JSchapker:sd & JGavula y- JMcCormickBargert JGrobeW

DATE 06/ /98 06/ /98 06/ /98 06/y94f

OFFICIAL RECORD COPY

9906100101 990603

l PDR ADOCK 05000266

8 POR

l

E__-

-

. _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

.

.

Mr. S. A. Patulski

Site Vice President

Point Beach Nuclear Plant

G610 Nuclear Road

Two Rivers, WI 54241

SUBJECT: NRC INSPECTION REPORT 50-266/96007(DRS)

Dear Mr. Patuiski:

On May 5,1998, the NRC completed an inspection of the inservice inspection activities and the

part length control rod drive housing modification performed at your Point Beach Nuclear Plant,

Unit 1. The results of this inspection were discussed on that date with Mr. Cayia and other

members of your staff. The enclosed report presents the results of that inspection.

The purpose of the inspection was to review the implementation of the Inservice Inspection

Program for the Unit i refueling outage. We concluded that, implementation of your Inservice

Inspection Prog.am met ASME,Section XI requirements.

In addition, this inspection reviewed activities associated with the removal and modification of

the reactor vessel head part length control rod drive housings. Your decision to remove the

part length control rod drive housings that were potentially susceptible to cracking,

demonstrated a conservative safety focus,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Pmetice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely

John A Grobe, Director

Division of Reactor Safety

Docket No.: 50-266

License No.: DPR-24

Enclosure: Inspection Report 50-266/98007(DRS)

See Attached Distribution

Document Name: G:\DRS\ pol 98007.DRS

r.c.~...m o ooc- ,*J.n me.co m .n c.co.. a.a.._,r. w.me.

OFFICE Rill ()4.- Rill J l6 Rlli l/6Rlli M "

l

NAME JSchapker!sd JGavula'I' JMcCormickSarger JGrobeL

DATE 0@o2/98 L l 0&d/98 06/'N98 /7M6) 06/7/98 i

OFFICIAL RECORD COPY

_ _ _ _ - _ _ - -- - _ - _ _ - _ _ _ _ - _ _ . _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - _ - _ _ _ _ _ - .

7

- - - bC.D 6

S. Patuiski 2

cc w/ encl: R. R. Grigg, President and Chief

Operating Officer, WEPCO

M. B. Sellman, Chief Nuclear Officer

M. Reddeman, Plant Manager

J. H. O'Nellt, Jr.

Shaw, Pittman, Potts & Trowbridge

K. Duveneck, Town Chairman

Town of Two Creeks

B. D. Burks, P.E., Director

Bureau of Field Operations

Cheryl L. Parrino, Chairman

Wisconsin Public Service Commission

S. Jenkins, Electric Division

Wisconsin Public Service Commission

State Liaison Officer

Distribution:

CAC (E-Mali)'

Project Mgr., NRR w/ encl

A. Beach w/ encl

J. Caldwell w/ encl

B. Clayton w/enci

SR.I Point Beach w/enci

DRP w/ encl

TSS w/enct ,

DRS w/enct

Rlli PRR w/enct

PUBLIC IE-01 w/enci

Docket File w/enct

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

.

j

000001

,

%-