ML20248K308

From kanterella
Jump to navigation Jump to search
Forwards Biweekly Listing of Generic Communications Being Considered or Under Development by NRC
ML20248K308
Person / Time
Issue date: 04/04/1989
From: Berlinger C
Office of Nuclear Reactor Regulation
To: Green W
INSTITUTE OF NUCLEAR POWER OPERATIONS
References
NUDOCS 8904170289
Download: ML20248K308 (5)


Text

.

App _gggg Mr. Wade Green-Institute of Nuclear Power Operations 1

Suite 1500, 1100 Circle 75 Parkway Atlanta, Georgia 30339-3064

Dear Mr. Green:

Enclosed for your information is our biweekly listing of generic communi-cations being considered or under development by the.NRC staff. These include i

Bulletins (type coded BL on the list), Information Notices (IN) and Generic Letters (GL). Temporary Instructions, that cover the special NRC inspection effort resulting from certain generic communications, are listed with the type code TI.

This listing includes all proposed generic communications that had been reported to us by March 31, 1989.

Sincerely, Carl H. Berlinger, Chief Generic Communications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation

Enclosure:

As stated DISTRIBUTION w/ enclosure:

JLieberman, OE All NRC Division Directors All NRC Branch Chiefs CERossi, NRR s

CHBerlinger, NRR i

J0Thoma, NRR 0GCB members PDR._ - n,%

{j[CentreEfiles: '

DCS DOEA R/F OGCB R/F 003 DKirkpatrick R/F I i SRichardson, DOE i

RBarber, DOE j?{

[

OGCB:D0EA:NRR C/0GCB:D0EA:NRR A

s D irkpatrick-ABerlinger

/ ls

/

7 /89 Or-,('

Oy3/89 f)[

8904170209 390404 EPSIg PDR ORG

t

APR n 41999 9-Pa?ge'No; 1

,a

', _ 03/31/89 j

PROPOSED GENERIC COMMUNICATIONS'

(

IN PREPARATION WITHIN THE NRC

~

TP ORIGIN.

SUBJECT CONTACT PHONE

. ISSUE OFFICE DATE-4 IN NRR/DRIS ENVIRONMENTAL QUALIFICATION Steve (301) 05/18/89' RVIB OF LIMITOROUE MOV ACTUATOR Alexander 492-0995 TERMINAL BLOCKS & MARATHON 1600 TERMINAL BLKS

(

l

. IN NRR/ DEST ERRORS IN CALIBRATION OF Joe Joyce (301) 04/28/89:

SICB LEAD / LAG AND RATE CIRCUITS IN 492-3265 REACTOR PROTECTION SYSTEMS.

GL NRR/DLPD SAFETY PARAMETER DISPLAY

. Dick (301) 03/31/89 SYSTEM - ACCEPTABLE METHODS Eckenrode 492-1105

.0F IMPLEMENTING REQUIREMENTS GL'RES/DE SAFETY RELATED MOTOR OPERATED Owen (301) 04/04/89 EIB VALVE. TESTING AND INSPECTION Rothberg 492-3924 IN RES/EME LIMITOROUE SMA SPRING Jerry (301) 04/14/89 DEFORMATION-Weidenhamer 492-3839 GL NRR/DOEA CHANGE-IN FORMAT FOR NRC Vern Hodge (301) 05/01/89 OGCB GENERIC COMMUNICATIONS 492-1169 GL NRR/ DEST SUPPLEMENT TO GENERIC LETTER Shou-Nien (301) 0"'01/89 EMEB 87-11 DEALING WITH ARBITRARY Hou 492-0904 INTERMEDIATE. PIPE RUPTURE REQUIREMENTS GL NRR/ DEST INSERVICE INSPECTION OF Robert (301) 04/04/89 EMTB PRESSURE RETAINING WELDS IN Hermann 492-0911 THE REACTOR VESSEL GL AEOD LICENSEE COMMITMENTS FOR John (301) 04/21/89 EMERGENCY RESPONSE DATA Uolicoeur 492-4155 SYSTEM (ERDS) IMPLEMENTATION GL NRR/ DEST NRR RECOMMENDATION ON ISI OF Chen P.

Tan (301) 05/01/89 ESGB MARK I & II STEEL 492-0829 CONTAINMENTS, REFUELING CAVITIES & ASSOC DRAINAGE SYS GL NRR/ DEST RESOLUTION OF GENERIC ISSUE Om P.

(301).

07/31/89 SELB B-56, DIESEL RELIABILITY Chopra 492-0835 l=

GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 06/01/89 OTSB SPECIFICATION IMPROVEMENT -

492-1189 REMOVAL OF COMPONENT LISTS IN NRR/DRIS INADEQUATE FIRE DAMPER Joe (301) 03/17/89 VIB OPERABILITY TESTS UNDER AIR Petrosino 492-0979 FLOW CONDITIONS f'

Pdge No.

2 03/31/89 3'

PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.

SUBJECT CONTACT PHONE ISSUE OFFICE DATE IN NRR/DRIS POTENTIAL MANUFACTURER Joe (301) 05/31/89 VIB DEFECTS IN CUTLER HAMMER E-30 Petrosino 492-0979 SWITCHES MANUFACTURED PRIOR TO A CERTAIN DATE GL NRR/ DEST MINIMUM EDGE DISTANCE FOR John Ma (301) 05/19/89 ESGB INSTALLATION OF ANCHORS IN 492-1376 CONCRETE IN AEOD THE REPORTING OF SAFETY VALVE Mary S.

(301) 05/18/89 AND SAFETY-RELIEF VALVE Wegner 492-7818 EVENTS PURSUANT TO 10 CFR 50.73 GL NRR/DREP CHANGE IN THE REGULATORY John (301) 04/.17/89 PRPB LIMIT FOR OCCUPATIONAL Buchanan 492-1097 EXPOSURE OF THE SKIN TO BETA RADIATION FROM HOT PARTICLES GL NRR/DOEA VOLUNTARY ENTRY INTO R.

J.

(301) 05/15/89 OTSB TECHNICAL SPECIFICATION 3.0.3 Giardina 492-1188 GL RES/DSIR ASME SECTION 3 REPLACEMENT Robert (301) 04/10/89 EIB Kirkwood 492-3928 GL RES/IEB RESOLUTION OF: GI/70, PORV-R Kirkwood 492-3928 06/01/89 t< RPSIB AND BLOCK VALVE RELIABILITY, E Throm

-3911 AND GI/94, ADDITIONAL LOW TEMP OVERPRESS PROTECTION FCR LWRS TI NRR/ DEST INSPECTION OF IMPLEMENTATION Ted (301) 04/07/89 EMEB OF BULLETIN TO EXTEND IEB Sullivan 492-0901 85-03 "MOV COMMON MODE FAILURES DURING PLANT TRANSIENTS TI NRR/ DEST INSPECTION OF COMPLIANCE WITH Mike McCoy (301) 08/01/89 SRXB BULLETIN 88-04:

492-0880

" SAFETY-RELATED PUMP LOSS" TI NRR/DRIS INSPECTION OF IMPLEMENTATION Ed Baker (301) 05/31/89 RVIB OF BULLETIN 87-02: FASTENER 492-0959 TESTING TO DETERMINE CONFORMANCE WITH MATERIAL SPECS TI NRR/DRIS FOLLOW-UP OF RESPONSES TO Ed Baker (301) 09/30/89 RVIB BULLETIN 88-05: NONCONFORMING 492-0959 MATERIALS PROVIDED BY PSI /WJM

c.

Pabe No.

3 03/31/89 i

IN PREPARATION WITHIN THE NRC PROPOSED GENERIC COMMUNICATIONS TP ORIGIN.

SUBJECT CONTACT PHONE ISSUE OFFICE DATE BL NRR/ DEST INTERGRANULAR STRESS CORR Dave (301) 05/01/09 EMTB CRACKING OF HIGH-HARDNESS Sellers 492-0930 STUDS IN ANCHOR DARLING S350W SWING CHECK VALVES OR SIMILAR VLVS GL NRR/DOEA REMOVAL OF 3.25 LIMITATION OF Tom Dunning (301) 06/01/89 OSTB SPEC 4.0.2 FOR REFUELING 492-1189 i

SURVEILLANCE IN REGION EXTERNALLY INDUCED CHLORIDE J.

F.

(312) 04/30/89 III STRESS CORROSION CRACKING OF Schapker 790-5562 STAINLESS STEEL PIPE GL NRR/DOEA SERVICE WATER SYSTEM PROBLEMS Vernon (301) 05/01/89 OGCB AFFECTING SAFETY-RELATED Hodge 492-1169 EQUIPMENT IN REGION I POTENTIAL FAILURE CONDITION Roy Mathew (215) 04/30/89 OF GE 4.16KV MAGNE-BLAST TYPE 337-5194 BREAKERS IN NRR/DOEA PROBLEMS WITH CIRCUIT BREAKER Rick (301) 04/07/89 OEAB ANTI-PUMP CIRCUITRY Kendall 492-3140 i

PREVENTING AUTO INITIATION OF SAFETY FUNCTIONS IN REGION FAILURE OF LIMITORQUE VALVE John (312) 06/01/89 III OPERATOR HOUSINGS Harrison 790-5635 IN NRR/DOEA OPERATING EXPERIENCE FEEDBACK Vernon (301) 05/01/89 OGCB Hodge 492-1169 IN NRR/ DEST INOPERABILITY OF TURBINE J.

Wermiel (301) 04/15/89 SPLB DRIVEN AUXILIARY FEEDWATER 492-0870 PUMP WHEN ONE OF TWO PARALLEL STEAM SUPPLY VALVES IS CLOSE IN NRR/DOEA ADEDUATE TESTING OF STEAM Angie (301) 04/14/89 OEAB GENERATOR TUBE PLUGGING Gilbert 492-1171 IN NRR/DREP ENEWJ EXERCISE OBJECTIVES AND Lawrence (301) 04/15/89 PEPB SCENARIOS FOR POWER REACTORS Cohen 492-3184 IN NRR/DRIS [NEWJ EVALUATION OF S.

V.

(301) 04/30/89 SIB INSTRUMENT SET POINTS DURING Athavale 492-0974 MODIFICATIONS IN NRR/DOEA ENEWJ SERVICE WATER VALVE Jerry (301) 04/13/89 i

OEAB CLOSING LOGIC Carter 492-1194

ji Ps.ge No.

4 i

03/31/89' PROPOSED. GENERIC COMMUNICATIONS y

IN PREPARATION WITHIN THE NRC TP ORIGIN.

SUBJECT CONTACT PHONE ISSUE OFFICE-DATE L

IN REG I

[NEWJ USE OF SIMULATED Rick (301) 05/15/89 SIGNALS IN PLANT PROTECTIVE Kendall 492-3140 CIRCUITS TO PREVENT AN AUTOMATIC ACTUATION l

l

- _ _ _ _ _ = _ _ _