a Ne88eI1YE_Sudde81_0E_QEEBeIING_EXEEBIENCE
' DOCKET NO. 50-282
' UNIT PRAIRIE 1 ISLAND.NO.1_
.!J t-DATE-APRIL 5, 1989 1
COMPLETED'BY DALE DUGSTAD TELEPHONE 612-388-1121 dQUI'H1__deBCH_____1282__.
.THE' UNIT WAS BASE LOADED THIS MONTH. ON THE 10TH AN AL OFFSET CALIBRATION WAS COMPLETED AND ON THE 19TH A TURBINE VALVES TEST WAS COMPLETED.
ON.THE 22ND AN NUE.WAS DECLARED DUE TO RWST BORON ANALYSIS OUT OF SPEC.-A PROBLEM'WAS DISCOVERED WITH-THE~ ANALYSIS: TECHNIQUE AND THE CORRECT BORON' CONCENTRATION WAS' VERIFIED. THE NUE WAS TERMINATED AT.
2133; POWER WAS REDUCED TO 97%.
ON THE'27TH WE EXPERENCED A TURBINE CONTROL VALVE SWINGj-IT DID NOT CAUSE ANY. PROBLEMS.
RCS RADI0 CHEMISTRY.HAS INDICATED THE PRESENCE.0F A FAILED FUEL PIN.
'~
ACTIVITY LEVELS ' ARE HIGHER THAN. NORMAL BUT STILL BELOW 1% OF TECH SPEC' LIMITS. WE ARE FOLLOWING ACTIONS OUTLINED IN THE FUEL INTEGRITY PROGRAM.
WE STARTED THE'C00 LING TOWERS THIS'HONTH.
CONTINUOUS ~0PERATING RUN 0F-134 DAYS.'
1l i
1 I
I 1
1
.i
., p R
[W L --
t/t i
D..
p-
. ;,3
' EVE 8eGE_DeILY_UNII_EDWER_LEMEL' l
l =.
DOCKET"NO. 50-282.'
c UNIT. PRAIRIE ISLAND NO.i_
p DATE APRIL 5, 1989 COMPLETED BY. DALE DUGSTAD TELEPHONE 612-388-1121 i
dQNIBi__de8CH_____1282__.
.I DeY eVEBeGE_ DOILY _EQWER_ LEVEL _idWE:NEIl i
528 2
525 3
527 i
4 526 l,
5' 529 6
527 7-527
.8-527-'
9 525 10 525 11 529 12 526 13 526~
14 527 15 529 16 525 17 528 18 526 19 500 20 528 3'
21 530 22 527 23 529 j
24 527 i
25 529 26 526 27 528 28 525 29 524 i
30 518 l
31 518 AVERAGE LOADS ABOVE 503 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER
\\
C
.0EE8eIING_DeIe_BE20RI.
~
' DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.i_.
DATE APRIL 5, 1989 COMPLETED BY DALE DUGSTAD
. TELEPHONE 612-388-ii21' ll
.)
1 QEEBeIING_SIeIUS 1'.
UNIT-NAME:
EB8IBIE_ISLeND_NO._1
- 62. REPORTING PERIOD:__deBCH_____1282___
ll NOTES:
l l
.3.
LICENSED. THERMAL POWER (MWT):
1650 l
l
- 4. NAMEPLATE RATING (GROSS MWE):
593 l
l
- 5. DESIGN ELECTRICAL' RATING (NET MWE).
530 l
I.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS.MWE)- 534 l
l' 7.-MAXIMUM; DEPENDABLE CAPACITY (NETHMWE):
503 1____________________i 8.
IF CHANGES OCCUR-IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE'LAST. REPORT GIVE REASON:
NONE_______________________________-
- 9. POWER-LEVEL TO WHICH RESTRICTED, IF-ANY (NET MWE).
._NQNE______________
- 10. REASONSJFOR RESTRICTIONS,.IF;ANY:__NONE_______________________________
'IHIS_dQNIH XB=IO:DeIE CUbuLeIIME 11.. HOURS IN REPORTING' PERIOD
~744 2160 134040-
'12. NUMBER OF' HOURS ~ REACTOR WAS CRITICAL-744.0:
l2160.0 112538.8.
- 13. REACTOR' RESERVE SHUTDOWN HOURS 0.0
?0. 0 5571.1 "14.. HOURS GENERATOR ON-LINE 744.0 2160.0 111070.6'
-15.' UNIT RESERVE. SHUTDOWN' HOURS 0.0 0.0.
.0.0
-16. GROSS, THERMAL' ENERGY GENERATED (MWH) 1222443 3555723
'i74903937 "i7.LGROSS ELECTRICAL ENERGY GENERATED (MWH) 411480 1197020-57332500
~
~ 18. NET ELECTRICAL' ENERGY. GENERATED (MWH) 390953 1138523 53799577 119. Uh i SERVICE FACTOR' 100.0 100.0 82.9
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 82.9.
L21. UNIT CAPACITY FACTOR (USING MDC NET)
-104.5 104.8 79.8
.j
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.1 99.5 75.7.
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 6.3
- 24. FORCED OUTAGE HOURS 0.0 0.0 7460.2
- 25. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE, DATE & DURATION OF EACH).
i f
l
_________________________NONE._________________________________________
- 26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:______NZe_________________-
)
. l I
i J
_1-_--_----------
.-x--__
V
.s L's ' :.1 UNII_SUUIDOWNS_6BD_20 WEB _BEDUDIION-L DOCKETJNO 50-282 UNIT NAME'EBeIBIEiISLeND_NO._1.
DATE 62BIL_5 _1282_____
COMPLETED.BY' DELE _DUGSIeD TELLEPHONE 612-388-1121' i
l l
dONIU1_deBCH_____1282______
i l
DeIE
-IYEE UQURS BEeSON dEIUDD LEB_NUMBEB SYSIEd C0dEONENI YY/MM/DD-000.0 j
89/03/10 S
0.0 B
5 N/A N/A N/A
~
AXIAL-0FFSET CALIBRATION.
)
89/03/19 S
0.0 D
5 N/A N/A N/A TURBINE VALVES TESTING ( NOW DONE QUARTERLY).
89/03/22 F
0.0 F
5 N/A N/A N/A
.NUE.DUE TO RWST BORON SAMPLE ANALYSIS PROBLEM.
-l f
I f
1 l
1
?
IXEE BEeSON dEIUDD-SXSIEd_00DE i
F-FORCED A-EQUIPMENT FAILURE i-MANUAL DRAFT IEEE STD S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984'(P805-D5) d C-REFUELING 3-AUTO TRIP
'D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING &
5-REDUCED LOAD C0dEONENI_ CODE LICENSE EXAMINATION 9-0THER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATIONAL ERROR H-0THER
I'.
3
.+
- )
HeBBeIIVE_SuddeBl_0E_0EE8eIING_EXEEBIENCE DOCKET NO. 50-306 j
UNIT PRAIRIE ISLAND 30.2_
{
DATE APRIL 5, 1989 2
COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-
~ l dQNIU1__deBCH_____1282__.
. i f
THE UNIT'WAS BASE: LOADED THIS MONTH.IN COASTDOWN OPERATION.
HON THE 28TH AT.2044 A LOAD REDUCTION WAS STARTED.TOLBEGIN-THE RE-
. FUELING.0UTAGE. THE GENERATOR WAS TAKEN OFFLINE AT 2215 AND THE REACTOR BREAKERS WERE 0UT AT 2341.-THIS ENDED A RUN OF 137 DAYS.
q A TURBINE OVERSPEED TEST WAS CONDUCTED ON THE RAMP DOWN.
j
'THE-COOLING TOWERS WERE STARTED THIS MONTH.
1 CONTINUOUS OPERATING RUN OF-137 DAYS
)
1 i
c c
J
eNE86GE_DeILY_UNII_EQWE8_LEMEL i
1 DOCKET NO. 50-306-
. UNIT PRAIRIE ISLAND,80.2_
DATE APRIL 5, 1989~
q 4
COMPLETED BY DALE DUGSTAD 1
TELEPHONE 612-388-1121' f
j dQNIBl__de8CH_____1282._
j DeY-eVEEeGE_DeILY_20WER_LEYEL_1bWE=NEN j
i 496 2
.482 3
468 4
468 i
5 465
-j 6
460 R
+
7 454 8-
.446 3
9 440 10:
430 11.
430
'i 2' 412 13 41i 14 4i6 i5' 420 16 413 17 409 18 406 19 399 20 394 21 392 22 381 23 374 l
24 370 25 365 26 327
.27 323
'l 28 279 29
-11 30
-3 o
31
-2
-l 1
' AVERAGE LOADS ABOVE 500 MWE-NET ARE DUE
.i TO COOLER CONDENSER CIRCULATING WATER l
f l
C I
.l
+
p j
o f
4 DEEBoIING_DeIe_8EE0BI i
i DOCKET NO. 50-306 J
UNIT PRAIRIE ISLAND NO.2_
DATE APRIL'5, 1989-COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 QEE8eIING_SIeIUS 1
- 1. UNIT'NAME:
EBeISIE_ISLeND_ND._2
'2.
REPORTING PERIOD:__de8CH_____1282___
l NOTES:
1
- 3. LICENSED THERMAL POWER (MWT)-
1650 l
I;
, 4. NAMEPLATE RATING (GROSS MWE):
593 l
l
- 5. DESIGN' ELECTRICAL DATING (NET MWE):
530 l-I l
- 6. MAXIMUM DEPENDABLE CAPACITY-(GROSS.MWE): 531 l
l
- 7. MAXIMUM DEPENDABLE' CAPACITY (NET MWE):
500 1____________________i-8.-IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3~THROUGH 7)
SINCE LAST REPORT-GIVE REASON:__NONE______________________________
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):__NONE______________-
- 10. REASONS FOR RESTRICTIONS, IF ANY:__NONE______
IBIS _dQNIH 18:IO:DeIE CUduLeIIVE i
11.oHOURS-~IN REPORTING PERIOD 744 2160
-125158
'12.' NUMBER OF HOURS REACTOR WAS CRITICAL.
671.7 2087.7 110137.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1
- 14. HOURS GENERATOR ON-LINE 470.2 2086.2 109054.6
~15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 16.-GROSS THERMAL ENERGY GENERATED (MWH) 890163 3215937 171966391 l
17.-GROST ELECTRICAL ENERGY GENERATED (MWH) 293720
-1066820 55690950
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 276309 1012578
- 52683179-
- 19. UNIT SERVICE FACTOR 90.1 96.6 87.1 1
- 20. UNIT AVAILABILITY FACTOR 90.1 96.6 87.1
- 21. UNIT CAPACITY FACTOR (USING.MDC NET) 74.3 93.8 84.2 i
22.JUNIT CAPACITY FACTOR (USING DER NET) 70.1 88.5 79.4-
.1
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 3.0-l 0.0 0.0 3346.8 l
24.: FORCED OUTAGE HOURS
- 25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH)
__________8EEUELING_QUIeGE_IQ_SIeBI_0N_deBCb_22__1282__________________
j E6. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE1__eERIL_27,_1282.________
)
s
_i.___.__._______=__.
)
e~
y UNII_SHUIDOWHS_eND_20 WEB _BEDUCIION l
.a DOCKET NO 50-306_
~ UNIT NAME EBeIBIE_ISLeND_NO._2 DATE~GEBIL_5 _1282_____
COMPLETED BY DELE _DUGSIeD TELLEPHONE 612-388-1121:
1
.dONIU1_de8CH_____1282______
l DeIE.
IYEE HOUBS 8EeSON dEIBOD LEB_NudBE8 5%SIEd C0dEONENIL YY/MM/DD 000.0 89/03/28 5
73.8 C
i N/A N/A.
N/A-REFUELING AND MAINTENANCE OUTAGE..
89/03/28 S
0.0 B
5 N/A N/A N/A-TURBINE OVERSPEED TEST.
q l.
-IXEE BEeSON dEIBOD-SYSIEd_ CODE F-FORCED A-EQUIPMENT FAILURE i-MANUAL DRAFT IEEE STD-S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984(P805-D5)
C-REFUELING 3-AUTO' TRIP i
D-REGULATORY RESTRICTION 4-CJNTINUED E
E-OPERATOR TRAINING &
5-REDUCED LOAD C0dEONENI_ CODE L
LICENSE EXAMINATION 9-0THER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATIONAL ERROR H-0THER
+.
Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 Telephone (612) 330 5500 April 7, 1989 Frairio Island Technical Specification Section 6.7.A.3 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLMIT Docket No. 50-282 License No. DPR-42 50-306 DPR-60 Monthly Operating Report March, 1989 Attached is the Monthly Operating Report for March,1989 for the Prairie Island Nuclear Generating Plant.
Y David Musolf Manager of Nuclear Support Services DMM/jlk c:
Director Office cf Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment i