a Ne88eI1YE_Sudde81_0E_QEEBeIING_EXEEBIENCE

' DOCKET NO. 50-282

' UNIT PRAIRIE 1 ISLAND.NO.1_

.!J t-DATE-APRIL 5, 1989 1

COMPLETED'BY DALE DUGSTAD TELEPHONE 612-388-1121 dQUI'H1__deBCH_____1282__.

.THE' UNIT WAS BASE LOADED THIS MONTH. ON THE 10TH AN AL OFFSET CALIBRATION WAS COMPLETED AND ON THE 19TH A TURBINE VALVES TEST WAS COMPLETED.

ON.THE 22ND AN NUE.WAS DECLARED DUE TO RWST BORON ANALYSIS OUT OF SPEC.-A PROBLEM'WAS DISCOVERED WITH-THE~ ANALYSIS: TECHNIQUE AND THE CORRECT BORON' CONCENTRATION WAS' VERIFIED. THE NUE WAS TERMINATED AT.

2133; POWER WAS REDUCED TO 97%.

ON THE'27TH WE EXPERENCED A TURBINE CONTROL VALVE SWINGj-IT DID NOT CAUSE ANY. PROBLEMS.

RCS RADI0 CHEMISTRY.HAS INDICATED THE PRESENCE.0F A FAILED FUEL PIN.

'~

ACTIVITY LEVELS ' ARE HIGHER THAN. NORMAL BUT STILL BELOW 1% OF TECH SPEC' LIMITS. WE ARE FOLLOWING ACTIONS OUTLINED IN THE FUEL INTEGRITY PROGRAM.

WE STARTED THE'C00 LING TOWERS THIS'HONTH.

CONTINUOUS ~0PERATING RUN 0F-134 DAYS.'

1l i

1 I

I 1

1

.i

., p R

[W L --

t/t i

D..

p-

. ;,3

' EVE 8eGE_DeILY_UNII_EDWER_LEMEL' l

l =.

DOCKET"NO. 50-282.'

c UNIT. PRAIRIE ISLAND NO.i_

p DATE APRIL 5, 1989 COMPLETED BY. DALE DUGSTAD TELEPHONE 612-388-1121 i

dQNIBi__de8CH_____1282__.

.I DeY eVEBeGE_ DOILY _EQWER_ LEVEL _idWE:NEIl i

528 2

525 3

527 i

4 526 l,

5' 529 6

527 7-527

.8-527-'

9 525 10 525 11 529 12 526 13 526~

14 527 15 529 16 525 17 528 18 526 19 500 20 528 3'

21 530 22 527 23 529 j

24 527 i

25 529 26 526 27 528 28 525 29 524 i

30 518 l

31 518 AVERAGE LOADS ABOVE 503 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER

\\

C

.0EE8eIING_DeIe_BE20RI.

~

' DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.i_.

DATE APRIL 5, 1989 COMPLETED BY DALE DUGSTAD

. TELEPHONE 612-388-ii21' ll

.)

1 QEEBeIING_SIeIUS 1'.

UNIT-NAME:

EB8IBIE_ISLeND_NO._1

62. REPORTING PERIOD:__deBCH_____1282___

ll NOTES:

l l

.3.

LICENSED. THERMAL POWER (MWT):

1650 l

l

4. NAMEPLATE RATING (GROSS MWE):

593 l

l

5. DESIGN ELECTRICAL' RATING (NET MWE).

530 l

I.

6. MAXIMUM DEPENDABLE CAPACITY (GROSS.MWE)- 534 l

l' 7.-MAXIMUM; DEPENDABLE CAPACITY (NETHMWE):

503 1____________________i 8.

IF CHANGES OCCUR-IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE'LAST. REPORT GIVE REASON:

NONE_______________________________-

9. POWER-LEVEL TO WHICH RESTRICTED, IF-ANY (NET MWE).

._NQNE______________

10. REASONSJFOR RESTRICTIONS,.IF;ANY:__NONE_______________________________

'IHIS_dQNIH XB=IO:DeIE CUbuLeIIME 11.. HOURS IN REPORTING' PERIOD

~744 2160 134040-

'12. NUMBER OF' HOURS ~ REACTOR WAS CRITICAL-744.0:

l2160.0 112538.8.

13. REACTOR' RESERVE SHUTDOWN HOURS 0.0

?0. 0 5571.1 "14.. HOURS GENERATOR ON-LINE 744.0 2160.0 111070.6'

-15.' UNIT RESERVE. SHUTDOWN' HOURS 0.0 0.0.

.0.0

-16. GROSS, THERMAL' ENERGY GENERATED (MWH) 1222443 3555723

'i74903937 "i7.LGROSS ELECTRICAL ENERGY GENERATED (MWH) 411480 1197020-57332500

~

~ 18. NET ELECTRICAL' ENERGY. GENERATED (MWH) 390953 1138523 53799577 119. Uh i SERVICE FACTOR' 100.0 100.0 82.9

20. UNIT AVAILABILITY FACTOR 100.0 100.0 82.9.

L21. UNIT CAPACITY FACTOR (USING MDC NET)

-104.5 104.8 79.8

.j

22. UNIT CAPACITY FACTOR (USING DER NET) 99.1 99.5 75.7.
23. UNIT FORCED OUTAGE RATE 0.0 0.0 6.3
24. FORCED OUTAGE HOURS 0.0 0.0 7460.2
25. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE, DATE & DURATION OF EACH).

i f

l

_________________________NONE._________________________________________

26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:______NZe_________________-

)

. l I

i J

_1-_--_----------

.-x--__

V

.s L's ' :.1 UNII_SUUIDOWNS_6BD_20 WEB _BEDUDIION-L DOCKETJNO 50-282 UNIT NAME'EBeIBIEiISLeND_NO._1.

DATE 62BIL_5 _1282_____

COMPLETED.BY' DELE _DUGSIeD TELLEPHONE 612-388-1121' i

l l

dONIU1_deBCH_____1282______

i l

DeIE

-IYEE UQURS BEeSON dEIUDD LEB_NUMBEB SYSIEd C0dEONENI YY/MM/DD-000.0 j

89/03/10 S

0.0 B

5 N/A N/A N/A

~

AXIAL-0FFSET CALIBRATION.

)

89/03/19 S

0.0 D

5 N/A N/A N/A TURBINE VALVES TESTING ( NOW DONE QUARTERLY).

89/03/22 F

0.0 F

5 N/A N/A N/A

.NUE.DUE TO RWST BORON SAMPLE ANALYSIS PROBLEM.

-l f

I f

1 l

1

?

IXEE BEeSON dEIUDD-SXSIEd_00DE i

F-FORCED A-EQUIPMENT FAILURE i-MANUAL DRAFT IEEE STD S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984'(P805-D5) d C-REFUELING 3-AUTO TRIP

'D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING &

5-REDUCED LOAD C0dEONENI_ CODE LICENSE EXAMINATION 9-0THER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATIONAL ERROR H-0THER

I'.

3

.+

)

HeBBeIIVE_SuddeBl_0E_0EE8eIING_EXEEBIENCE DOCKET NO. 50-306 j

UNIT PRAIRIE ISLAND 30.2_

{

DATE APRIL 5, 1989 2

COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-

~ l dQNIU1__deBCH_____1282__.

. i f

THE UNIT'WAS BASE: LOADED THIS MONTH.IN COASTDOWN OPERATION.

HON THE 28TH AT.2044 A LOAD REDUCTION WAS STARTED.TOLBEGIN-THE RE-

. FUELING.0UTAGE. THE GENERATOR WAS TAKEN OFFLINE AT 2215 AND THE REACTOR BREAKERS WERE 0UT AT 2341.-THIS ENDED A RUN OF 137 DAYS.

q A TURBINE OVERSPEED TEST WAS CONDUCTED ON THE RAMP DOWN.

j

'THE-COOLING TOWERS WERE STARTED THIS MONTH.

1 CONTINUOUS OPERATING RUN OF-137 DAYS

)

1 i

c c

J

eNE86GE_DeILY_UNII_EQWE8_LEMEL i

1 DOCKET NO. 50-306-

. UNIT PRAIRIE ISLAND,80.2_

DATE APRIL 5, 1989~

q 4

COMPLETED BY DALE DUGSTAD 1

TELEPHONE 612-388-1121' f

j dQNIBl__de8CH_____1282._

j DeY-eVEEeGE_DeILY_20WER_LEYEL_1bWE=NEN j

i 496 2

.482 3

468 4

468 i

5 465

-j 6

460 R

+

7 454 8-

.446 3

9 440 10:

430 11.

430

'i 2' 412 13 41i 14 4i6 i5' 420 16 413 17 409 18 406 19 399 20 394 21 392 22 381 23 374 l

24 370 25 365 26 327

.27 323

'l 28 279 29

-11 30

-3 o

31

-2

-l 1

' AVERAGE LOADS ABOVE 500 MWE-NET ARE DUE

.i TO COOLER CONDENSER CIRCULATING WATER l

f l

C I

.l

+

p j

o f

4 DEEBoIING_DeIe_8EE0BI i

i DOCKET NO. 50-306 J

UNIT PRAIRIE ISLAND NO.2_

DATE APRIL'5, 1989-COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 QEE8eIING_SIeIUS 1

1. UNIT'NAME:

EBeISIE_ISLeND_ND._2

'2.

REPORTING PERIOD:__de8CH_____1282___

l NOTES:

1

3. LICENSED THERMAL POWER (MWT)-

1650 l

I;

, 4. NAMEPLATE RATING (GROSS MWE):

593 l

l

5. DESIGN' ELECTRICAL DATING (NET MWE):

530 l-I l

6. MAXIMUM DEPENDABLE CAPACITY-(GROSS.MWE): 531 l

l

7. MAXIMUM DEPENDABLE' CAPACITY (NET MWE):

500 1____________________i-8.-IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3~THROUGH 7)

SINCE LAST REPORT-GIVE REASON:__NONE______________________________

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):__NONE______________-
10. REASONS FOR RESTRICTIONS, IF ANY:__NONE______

IBIS _dQNIH 18:IO:DeIE CUduLeIIVE i

11.oHOURS-~IN REPORTING PERIOD 744 2160

-125158

'12.' NUMBER OF HOURS REACTOR WAS CRITICAL.

671.7 2087.7 110137.0

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1
14. HOURS GENERATOR ON-LINE 470.2 2086.2 109054.6

~15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 16.-GROSS THERMAL ENERGY GENERATED (MWH) 890163 3215937 171966391 l

17.-GROST ELECTRICAL ENERGY GENERATED (MWH) 293720

-1066820 55690950

18. NET ELECTRICAL ENERGY GENERATED (MWH) 276309 1012578
52683179-
19. UNIT SERVICE FACTOR 90.1 96.6 87.1 1
20. UNIT AVAILABILITY FACTOR 90.1 96.6 87.1
21. UNIT CAPACITY FACTOR (USING.MDC NET) 74.3 93.8 84.2 i

22.JUNIT CAPACITY FACTOR (USING DER NET) 70.1 88.5 79.4-

.1

23. UNIT FORCED OUTAGE RATE 0.0 0.0 3.0-l 0.0 0.0 3346.8 l

24.: FORCED OUTAGE HOURS

25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH)

__________8EEUELING_QUIeGE_IQ_SIeBI_0N_deBCb_22__1282__________________

j E6. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE1__eERIL_27,_1282.________

)

s

_i.___.__._______=__.

)

e~

y UNII_SHUIDOWHS_eND_20 WEB _BEDUCIION l

.a DOCKET NO 50-306_

~ UNIT NAME EBeIBIE_ISLeND_NO._2 DATE~GEBIL_5 _1282_____

COMPLETED BY DELE _DUGSIeD TELLEPHONE 612-388-1121:

1

.dONIU1_de8CH_____1282______

l DeIE.

IYEE HOUBS 8EeSON dEIBOD LEB_NudBE8 5%SIEd C0dEONENIL YY/MM/DD 000.0 89/03/28 5

73.8 C

i N/A N/A.

N/A-REFUELING AND MAINTENANCE OUTAGE..

89/03/28 S

0.0 B

5 N/A N/A N/A-TURBINE OVERSPEED TEST.

q l.

-IXEE BEeSON dEIBOD-SYSIEd_ CODE F-FORCED A-EQUIPMENT FAILURE i-MANUAL DRAFT IEEE STD-S-SCHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984(P805-D5)

C-REFUELING 3-AUTO' TRIP i

D-REGULATORY RESTRICTION 4-CJNTINUED E

E-OPERATOR TRAINING &

5-REDUCED LOAD C0dEONENI_ CODE L

LICENSE EXAMINATION 9-0THER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATIONAL ERROR H-0THER

+.

Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 Telephone (612) 330 5500 April 7, 1989 Frairio Island Technical Specification Section 6.7.A.3 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLMIT Docket No. 50-282 License No. DPR-42 50-306 DPR-60 Monthly Operating Report March, 1989 Attached is the Monthly Operating Report for March,1989 for the Prairie Island Nuclear Generating Plant.

Y David Musolf Manager of Nuclear Support Services DMM/jlk c:

Director Office cf Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment i