Text

..

K 1

l October 31, 1997-

'Ms. Loranns M. May Quality Assurance Manager GNB Technologies Telecom/ Power Control Division 829 Parkview Boulevard Lombard, Illinois 60148-3249

SUBJECT:

POSTPONEMENT OF NRC INSPECTION 99901251/97-01

Dear Ms. May:

As discussed between you and Mr. Joseph Potrosino of my staff during a telephone conversation on October 29, 1997, the NRC staff inspection of the GNB Technologies. Incorporated (GNB) manufacturing facility originally scheduled on November 3 to 7,1997, has been )ostponed.

It is my expectation that we will commence the second )ortinn of tie NRC staf f inspectics at your Fort Smith, Arkansas facility wit 11n the next 120 days.

Thank you for your patience in this matter.

If you have any further questions please contact Mr. Kamalakse Naidu at (301) 415-2980 or Mr. Petrosino at (301) 415-2979.

Sincerely, Original signed by:

Suzanne C. Black Suzanne C. Black, Chief Quality Assurance, Vendor Inspection and Mainteaance Branch Division of Reactor Ccatrols and Human Factors Office of Nuclear Reactor Regulation Docket 999015Rt/97-01 cc:

Mr. Robert W. Bonisolli, Manager Quality Assurance Nuclear Logistics, Incorporated 7451 Airport Freeway

-Fort Worth, Texas 76118 9 9 54 RISTRIBt).UDH:

HQMB R/F Central Files / RIDS IE:091 Docket File 99900732 PUBLIC SNSabc-KRNaidu SDAlexander l Q DOCUMENT NAME:

PETRO \\ CANCEL.GNB To receive a copy of thle doounyont... dicate in the box: 'C' = Copy without enclosures "E' = Copy with enclosures "N* = No copy 0FFICE HQMB:DRClW{ E HQMB:DRCH Mg HQMB:DRCH l AJ l E I

NAME PetrosinC N RAGramm O /,

SCBlack Wh DATE 10/60/97 lo / 36/97-N /50 /97 0FFICIAL RECORD COPY.

pj $-l3 vcabW E, s s _}40M_.

E.I.E.Rl.lllH.

"'f p-(WOOWl)-

$' i a

99901251 PDR

l i

October 31, 1997 Ms. Loranne M. May Quality Assurance Manager GNB Technologies Telecom/ Power Control Division 829 Parkview Boulevard Lombard, Illinois.601aP-3249

$UBJECT:

POSTPONEMENT OF NRC INSPECTION 99901251/97-01

Dear Ms. May:

As discussed between you and Mr. Joseph Petrosino of my staff during a telephone conversation on October 29, 1997, the NRC staff inspection of the GNB Technologies, Incorporated (GNB) manufacturing facility originally scheduled on November 3 to 7,1997, has been

)ostponed, it is my expectation that we will commence the second )ortion of tie NRC staff inspection at your Fort Smith, Arkansas facility wit 11n the next 120 days.

Thank you for your patience in this matter.

If you have any further questions please contact Mr. Kamalakar Naidu at (301) 415-2980 or Mr. Petrosino at (301) 415-2979.

Sincerely, Original signed by:

Suzanne C. Black Suzanne C. Blar.k, Chief Quality Assurance, Vendor Inspection and Maintenance Branch Division of Reactor Controls :,nd Human Factors Office of Nuclear Reactor Regulation Docket 99901521/97-01 cc:

Mr. Robert W. Bonisolli, Manager Quality Assurance Nuclear Logistics, Incorporated 7461 Airport Freeway Fort Worth, Texas 76118 DISTRIBUTION:

HQMB R/F Central Files / RIDS IE:09 Docket File 99900732 PUBLIC SNSaba XRNaidu SDAlexandcr DOCUMENT NAME: Cp PETRO \\ CANCEL.GNB Te,eceive a copy of thie docungit., dicate in the box: *C* = Copy without enclosures *E* = Copy with enclosures *N' = No copy 0FFICE HQHB:DRCl W E HQMB:0RCH_ ff HQMB:DRCH l p)

E l

NAME Petrosin@ M RAGramm M_/p SCBlack 4h DATE 10/dC/97 to / 30'/97 __

/3 /%3 /97 OfflCIAL RECORD COPY eC Y

-,~,

October-31,-1997-Ms. Loranne M..May' Quality Assurance Manager-GN8 Technologies

-Telecom/ Power Coidrol Division 829 Parkview Boulevard Lombard, Illinois 60148-3249

SUBJECT:

POSTPONEMENT OF NRC INSPECTION-99901251/97-01

Dear.Ms._May:

As discussed between you.and Mr. Joseph Petrosino of my staff during a-telephone conversation on October 29,:1997, the NRC staff inspection of the -

GNB Technologies Incorporated (GNB) manufacturing facility originally-scheduled on November 3 to 7,1997, has been )ostponed.-

It is my expectation that we will commence the second portion of tie NRC staff inspection at your

. Fort Smith,-Arkansas facility within-the next 120 days.

Thank you for your patience in this matter._ -If you have-any further questions please contact Mr. Kamalakar Naidu at (301) 415-2980 or Mr. Petrosino at (301) 415-2979.

Sincerely, Original signed by: Suzanne C. Black Suzanne C. Black, Chief Quality Assurance, Vendor Inspection and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Rea:: tor Regulation Docket 99901521/97-01 cc:

Mr. Robert W. Bonisolli, Manager Quality Assurance Nuclear Logistics, Incorporated 7461 Airport Freeway Fort Worth, Texas 76118 DISTRIBUTION:

HQMB R/F-Central Files / RIDS IE:09 Docket File 99900732 PUCLIC-SNSaba-KRNaidu

.SDAlexander DOCUMENT-NAME: MPETRO\\ CANCEL.GNB To receive a copy of this doeuno'ntJndoete in the boa: "C" = copy without enclosuree

  • E' = Copy with enclosures *N* = No copy 0FFICE HQMB:DRCH WC HQMB:DRCH_

Kg HQMB:DRCH l o) l E l

NAME PetrosinC \\1 RAGramm # /4 SCBIack $h DATE 10/,$d/97 to / 36/97

/J /5J /97 l

OFFICIAL RECORD COPY

',ffQ//bh