k l
l l
PARSONS-i Parsons Power Group inc. 2G75 Morgantown Road Reading, Pennsylvania 19607 -(610) 855 2000 Fac (610) 855-2001 i
June 30,1997 l
Docket No. 50-336
'i Parsons NUM2-PPNR-0263-L j
l
- U.S. Nuclear Regulatory Commission I
Attention: Document Control Desk Washington, D.C. 20555 r
l l
i Millstone Nuclear Power Station Unit No. 2 Independent Corrective Action Verification Program OCAVP)
Gentlemen:
I Attached please find new revisions to the Parsons Power Group Inc. ICAVP SVSR
-Implementation Checklists and Workbook (PI-01) that incorporate those items discussed during our recent conversations with the NRC ICAVP Staff. Note that Attachment 1 provides the l
instructions to incorporate the new revisions into the previously transmitted revision of PI-01.
Also included is the procedures index which has been revised to reflect recent procedure changes.
Please call me at (610) 855-2366 if you have any questions.
Sincerely, i.
- 09 Daniel L. Curry l-p, J g q e,
Parsons ICAVP Project Director 6
u-J DLC:djv Attachment I
~
l cc: ' E. Imbro (2) - USNRC Document Control Desk - USNRC f
i H. Eichenholz - USNRC -
/
R. Laudenat - NNECo i
i J. Fougere - NNECo Rep. Terry Concannon - NEAC i
lllE EgiglR,RilR 9707')70014 970630 PDR ADOCK 05000336 P
v i
MHJRTONE UNIT 2 ICAVP i
t PROJECT PROCEDURES INDEX l
l l
PROJECT PROCEDURE TITLE REVISION PP-01 System Vertical Slice Review 2
PP-02 Accident Mitigation System Review 2
PP-03 Process Review, CMP Horizontal Slice 2
PP44 Regulatory Review Procedure 1
l PP-05 Differing Professional Opin'.on 1
PP-06 Substitution or Addition of Personnel 1
PP-07 Discrepancy Reports 2
PROJECT PROCEDURE TITLE REVISION i
PI-01 SVSR Implementation Checklists and Workbook I
i l
0 Procedures Index Rev. 2 June 30,1997
i l
l l
Anehment 1 lO l
INSTRUCTION SHEET l
Project Instruction - PI-01 Attachment A - Source Book of Additional Questions Kemove 1n3g11 Remove Insert Cover, Rev. O Cover, Rev. I SB-47, Rev. O SB-47, Rev. I iii, Rev. O iii, Rev. I SB-48, Rev. O SB-48, Rev.1 iv, Rev. I v,Rev.1 PI-01, Rev. O PI-01, Rev. I PI-32, Rev. O PI-32, Rev. I t
PI-34, Rev. O PI-34, Rev.1 PI-37, Rev. O PI-37, Rev.1 PI-72, Rev. O PI-72, Rev.1 I-03-1, Rev. O I-03-1, Rev.1 l
thru thru I-03-45, Rev. O I-03-45, Rev. I PI-75, Rev. O PI-75, Rev.1 I-04-1, Rev. O I-04-1, Rev.1 s
thru thru I
I-04-3, Rev. O I-04-3, Rev.1 PI-79, Rev. O PI-79, Rev. I I-05-1, Rev. O I-05-1, Rev. I 1
1-05-2, Rev. O I-05-2, Rev. I PI-84, Rev. O PI-84, Rev.1 I-07-1, Rev. O I-07-1, Rev.1 thru thru l
I-07-7, Rev. O I-07-7, Rev.1 PI-95, Rev. O PI-95, Rev.1 I-08-1, Rev. O I-08-1, Rev. I thru thru I-08-7, Rev. O I-08-7, Rev.1
. PI-100, Rev. O PI-100, Rev. I 1-09-1, Rev. O I-09-1, Rev. I thru thru j
I-09-6, Rev. O I-09-6, Rev. I i
PI-106, Rev. O PI-106, Rev.1 PI-107, Rev. O PI-107, Rev.1 PI-107a, Rev. I I-10-1, Rev. O I-10-1, Rev.1 I
thru thru I-10-3, Rev. O I-10-3, Rev.1 l
0
.