.p, c.
J y
,e<
=,'
kl},-f_f' ?lg e~
n
' ~' Alabirna Power Company -
W 40 invernias C ntrr Parkway.
L:
,e
' Post Office Box 1295 k
' Birminghami Alabama 35201
_ Telephone 205 868-5581 j
. W. G, Hairston, til Senior Vice President E Nuclear Operations.
Alabama Power-the southem electnc s 10CFR50.55a(g)ystem October 5. 1989 Docket No. 50-364 U.-S.'. Nuclear Regulatory Commission Attention: Document Control Desk Vashington, D. C.
20555 Gentlemens' Joseph M. Farley Nuclear Plant _ Unit 2 Interval 1/ Period 3/ Outage'l Inservice ~ Inspection Report Submitted August 9, 1989 Pursuant to the requirements of.10CFR50.55a(g) Alabama Power Company submitted the referenced report on August 9, 1989. Tab J ci this report included ninety-two (92) HIS-2 Owners Reports For Repairs or Replacements.-
However, thirteen (13) reports representing-the work completed for ten (10)
' design changes were inadvertently omitted.
Copies of these reports are enclosed and should be included in Tab J of the referenced report.
If there are any questions, please advise.
Respectfully submitted,
&,b. $ h *-
-V. G. Hairston, III VGH/DEM/ CDP:cht-8.5 Enclosure