Informs of on-site Insp for Period of 980701-0814 Using NRC Insp Procedures IP37001,IP40500 & IP93809.To Effectively Prepare for Insp,Nrc Requests That Licensee Provide Documents Listed in Attachment by 980715 to Region I
ML20248G632
Person / Time
Site: FitzPatrick 
Issue date: 06/01/1998
From: Gray E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Zaremba A
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
NUDOCS 9806050281
Download: ML20248G632 (4)


Text

-

June 1, 1998 l

Mr. Arthur H. Zaremba Licensing Manager New York Power Authority James A. FitzPatrick Power Plant l

Post Office Box 41 Lycoming, NY 13093

Dear Mr. Zaremba:

SUBJECT:

NRC TEAM INSPECTION of ENGINEERING at the FITZPATRICK Plant I

An on-site team inspection, using NRC Inspection Procedures IP37001,IP40500 and IP93809,is planned for the FitzPatrick Plant during the period of July 27 to August 14,1998. The team effort will be in the area of 10CFR 50.59 evaluations, the identification and resolution of problems, a vertical slice inspection on the engineering

- inputs that support performance of two systems, and engineering involvement with operations and maintenance. The overall objective of the inspection is to determine whether the engineering functions are providing for safe and proper conduct of plant l

- operation. The team will include five inspectors, and a team leader.

To effectively prepare for the inspection, we request that you provide the documents listed in the attachment to the Region 1 office by July 15,1998. Should any of the requested documents not be readily available, we will consider alternative documents. The scope of requested documents was reviewed with Mr. Dave Wallace previously to provide additional lead time before the start of the inspection.

' Should you or your staff have questions about the inspection, please contact me at (610) 337-5325 or the Glenn Meyer at (610) 337-5211.

\\

' \\

\\

-O E. Harold Gray, Sr. Reactor Engineer jQ Components Branch Division of Reactor Safety Docket Nos. 50-333 9906050281 990601 PDR ADOCK 05000333 G

PDR t-------------______-_________--

b Mr. Arthur H. Zaremba 2

cc w/ encl:

C. D. Rappleyea, Chairman and Chief Executive Officer E. Zeltmann, President and Chief Operating Officer R. Hiney, Executive Vice President for Project Operations.

M. Colomb, Site Executive Officer J. Knubel, Chief Nuclear Officer and Senior Vice President H. P. Salmon, Jr., Vice President of Engineering W. Josiger, Vice President - Engineering and Project Management J. Kelly, Director.- Regulatory Affairs and Special Projects T. Dougherty, Vice President - Nuclear Engineering R. Deasy, Vice President - Appraisal cnd Compliance Services R. Patch, Director - Quality Assurance G. C. Goldstein, Assistant General Counsel C. D. Faison, Director, Nuclear Licensing, NYPA T. Morra, Executive Chair, Four County Nuclear Safety Committee Supervisor, Town of Scribe C. Donaldson, Esquire, Assistaat Attorney General, New York Department of Law P. Eddy, Electric Division, Department of Public Service, State of New York G. T. Goering, Consultant, New York Power Authority J. E. Gagliardo, Consultant, New York Power Authority E. S. Beckjord, Consultant, New York Power Authority

- F. William Valentino, President, New York State Energy Research and Development Authclity J. Speth, Prograiii Director, New York State Energy Research and Development Authority -

1 I

r I

t Mr. Michael J. Colomb 3

Distribution w/ encl:

D. Screnci, PAO (2)

Nuclear Safety Information Center (NSIC)

PUBLIC NRC Resident inspector Region I Docket Room (with concurrences)

D. Lew, DRP P. Kaufman, DRP R.Junod,DRP 1

B. McCabe, RI EDO Coordinator S. Bajwa, NRR i

J. Williams, NRR f

G. Meyer, DRS H. Gray, DRS M. Campion, RI Inspection Program Branch, NRR (IPAS)

]

R. Correia, NRR F. Talbot, NRR DOCDESK DRS File I

I DOCUMENT NAME: G:\\CMMEB\\ GRAY \\FTPENGLT.EHG i

T3,eceive e copy of this document. Indcate in the boa: "C" = Copy without ettschment/ enclosure

'E" = Copy with ettaetment/ enclosure

'N' = No copy OFFICE RI:DRS

[5 Rl:DRS l

l NAME EH Gray p//h G Meyer,,,, /

DATE

  1. 1B98 b/l /98 jf) F" OFFICIAL RECORD COPY l

l L-

ATTACHMENT 1 MATERIALS REQUESTED FROM THE FITZPATRICK PLANT - ENGINEERING INSPECTIOff 1.

Station Organization Charts for Engineering, Operations and Maintenance.

2.

List of principle contacts for team counterparts (ENG, OPS, and MNT) 3.

Tech Spec, administrative procedures and charters for the Plant Operational Review Committee, Safety Review Committee (SRC) and Quality Verification Organization 4.

Administrative Procedures for the Deviation Event Report Process, Status Control Process, Work Authorization Process, and Operating Experience Feedback.

5.

Engineering Quality Review Team and Self Assessment report summaries.

6.

Deviation Event Report index (Available summary of adverse conditions) of category A and B items for last 2 years and category C and D items for the past 2 months.

7.

Deviation Event Report Backlog Listing f

8.

List of Work Authorizations for Safety-Related Equipment for last year l

9.

Engineering and Maintenance Backlog Listings l

l 10.

List of QA/QC, SRC audit reports for last 1 year i

f 11.

Index/ Tracking list of QA findings (audit & surveillance) for last year 12.

Summary of how the plant performed in the past 2 years including any chronic plant issues 13.

Self-Assessment Reports Index for last 2 years 14.

Performance Indicators 15.

List of LERs for the past year 16.

Current Operator Worka.ounds i

17.

Listing of significant Engineering tasks of past 2 years I

18.

10 CFR 50.59 Safety Evaluation Process and Operability Determination Procedures

~21.

Summary of the IPE/PRA report for the plant, i

1