ML20248F394

From kanterella
Jump to navigation Jump to search
Mod 5 to Contract NRC-03-96-027
ML20248F394
Person / Time
Issue date: 05/26/1998
From: Bohike W, Pool S
NRC OFFICE OF ADMINISTRATION (ADM), STONE & WEBSTER ENGINEERING CORP.
To:
References
CON-FIN-J-2497, CON-NRC-03-96-027, CON-NRC-3-96-27 NUDOCS 9806040229
Download: ML20248F394 (3)


Text

y D@

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 7'

[3

' ' ' ' " ^ ' " '"

3. AMfMDMENTMOceHCATION NO.
3. EFFECTIVE DATE
4. REOutSIT40NfPURCHAsE REO NO.
s. PROJECT NO (if apphcatne) 5-see block 16C NRR-% 027 u o - m -D.T e..th t,,.n. tem.,

l

..smo.T c,

U.S. Nuclear Regulatory Connission Division of Contracts and Property Mgt.

Attn: T 7 I-2 Washington DC 20555

8. NAME AND ADDMSs oF CONTRACTOR (No, street. county, state and ZIP Cede)

(X)

BA. AMENDMENT OF souCITATION NO.

so. DuitD csEE rTEM tu Stone and Webster Engineering Corp.

Attnt Steven Stann 26 sunner stmt

,,,,og,,c,y,g,,, co,,,,c,,g,gg,,,

Boston MA 02107-2325 Con # WRC-03-96-027 108 DATED 15EE ITEM 13)

X 09-30-1996 lF ACruTv cOoE Coot

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS O The ebo e aumbered oiiciterioa ie emeaded e= eet forth in iiem i A. The hour sad daie specified for receini of offer Ot= e twoed Offers must acknowledge receipt of this amendment prior to the hour and date specsfied in the solicitation or as amended, by one of the following methods:

(d By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment of each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation arrj amendment numbers. FAILURE OF YOUR AC-KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED M RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the operung hour and dati specified.

1MCCOuNTWG AND APPROPNATION DATA pt teound) 31X0200 82015112028 J2497 252A $13,208

13. THIS ITEM APPLIES OP!LY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

4X)

A. THis CHANGE ORDER is ISSUED NRSUANT TO.

(Specsty authenty) THE CHANGES stT FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO IN ITEM 10A.

B THE ABOVE NUMBERED CONTRACTIORDER is MODIFIED TO REFLECT THE ADMWISTRAffVE CHANGES tauch as changes en p6ymg offsca, approptsapon date. etc.)

SET FORTH IN ITIM 14. PURSUANT TO THE AUTHOmTY OF FAR a3103(bt C, THis SUPPLEMENTAL AGREEMENT is ENTERED 0NTO PURSUANT TO AUTHORITY OF:

FAR 52.249-6 Termination Cost Reinibursement X

o. OTHER tspecety type of modification and authonty' i

E. IMPORTANT: Contractor is not, x is required to sign this document and return tNo copies to the issuing office.

14 C2sClWPTION OF AMENOMENTMODIFICA TlON IOrganued by UCF secuon headings. sncludeng solicitetsonicontract subpect metter where feasible.1 See attached continuation sheet.

O e

i 9806040229 980526 PDR CONTR

(

\\'

NRC-03-96-027 PDR x

ided herem, all terme and condetoons of the document reteeenced m item DA or 10A. et hometofore changed. remams unchanged and m tult force end ettect.

iacept es 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type et pemu 1sA.

ANDTITLE OF stGNER (Type et pnnt)

Stephen Soo WY W WW khk [ b id TATrSOf.

168 ERICA 16C DATE IGNED d

FE ROR lsC. DAlt slGW_D ths.

I NJ f '. t s'uk

, et 4i%,_e.t c..t.. ctg,

o nr 7g :

l

~.1m.

-.~

t.

n,mA _,86-a.,

j v

Mod # 5 Con # NRC-03-96-027 CONTINUATION PAGE The purpose of this modification is to (1) adjust the estimated cost and fixed fee of.the contract as a result of a settlement reached pursuant the termination notice issued to the contractor on April 9, 1998 and (2) to allot $13,200 in funding to cover the cost of the termination settlement.

1.

The estimated cost and fixed fee of the contract is hereby decreased as chown below:

From:

By:

To:

Estimated Cost:

$2,067,949

$598,083

$1,469,866 FCCM

$ 29,392 5,736 23,656 Fixed Fee

$192,320

$45,334

$146,986 CPFF

$2,289,661

$649,153

$1,640,508 2.

$13,208 is hereby alloted to this contract.

As a result of this obligation and item #1 above, Section B.3 entitled " Consideration and Obligation - Cost Plus Fixed Fee (JUN 1988) Alternate I (JUN 1991)" is hareby replaced by the following Section B.3:

B.3 CONSIDERATION AND OBLIGATION--COST PLUS FIXED FEE (iRRJ 1988)

(a) The total estimated cost to the Government for full performance of this centract is $1,640,508 of which the sum of $1,469,866 represents the estimated reimbursable costs, $23,656 represents facilities capital cost of money, and of which $146,986 represents the fixed fee.

(b) There shall be no adjustment in the amount of the contractor's fixed fce by reason of differences between any estimate of cost for performance of the work under this contract and the actual cost for performance of that work.

(c) The amount obligated by the Government with respect to this contract is $1,640,508.

(End of Clause) 3.

As a result of the termination notice issued November 7, 1997 pursuant to FAR 52.249-6 entitled " Termination - Cost Reimbursement," Section F.6 entitled " Duration of Contract Alternate 4" is hereby replaced with the following Section F.6:

F.6 DURATION OF CONTRACT The period for this contract shall commence on September 30,1996 and will expire on June 8, 1998 (END-OF-CLAUSE) 4.

A summary of funds allotted to this contract from date of award to-date is as follows:

FY 1996 obligations f 25,000.00 FY 1997 obligations

$ 1,302,300.00 FY 1998 obligations 213,208.00 I

Total obligations

$ 1,640,508.00 Page 2 of 3

I l'

Mod # 5 Con # NRC-03-96-027 5.

All other terms and conditions remain the unchanged.

1 1

N N.

Page 3 of 3