ML20248F128

From kanterella
Jump to navigation Jump to search
PNO-78-119:on 780605,during Integrated Sfas Test,If Sfas Occurred in Conjunction W/Loss of Offsite Power,Sequencer for DG Would Not Function Properly.Condition Apparently Existed Since Mod Made to Add Memory Interlock on Feb 1977
ML20248F128
Person / Time
Site: Davis Besse 
Issue date: 06/06/1978
From: Klinger G, Nolan F, Sniezek S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-78-119, NUDOCS 9806040113
Download: ML20248F128 (1)


Text

_ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _

h ' V/ Onk f

k)ll}

f l

[

PRELIMINARY NOTIFICATION s.

June 6, 1978 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -- PNO-78-119 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance.

The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff as of this date.

Facility: Toledo Edison Company, Davis-Besse Unit 1 (DN 50-346)

Port Clinton, Ohio

Subject:

DEFEAT OF DIESEL GENERATOR SEQUENCER CIRCUIT The Toledo Edison Company reported that during an integrated Safety Features Actuation System (SFAS) test, it was determined that if.a SFAS occurred in conjunction with loss of offsite power, the sequencer for the diesel generator would not function properly.

The automatic loading of critical equipment onto the bus would be negated.

This condition has apparently existed since a modification was made to add a memory interlock to the SFAS system during February 1977.

W j

Davis-Besse is currently in a refueling outage to remove burnable poison I

(

f assemblies and fuel assembly orifices.

An inspector will be at the site on June 6,1978.

Region III (Chicago) received notification of this event by telephone from the licensee at 4:10 p.m., on June 5,1978.

Region III also received an inquiry on this matter on June 5,1978, from a Toledo, Ohio television station.

Region III will respond to the inquiry, but does not plan a press release at this time.

Contact:

GKlingler, IE x28019 FNolan, IE x28019 JSniezek, IE x28019 Distribution:

Transmitted H St ///kO Chairman Hendrie Commissioner Bradford Commissioner Kennedy S. J. Chilk, SECY C. C. Kammerer, CA Commissioner Gilinsky (For Distribution)

Transmit'ted:

MNBB /l! N P Bldg M.',k 3 E. Vol enau IE j

L. V. Gossick, EDO E.G.Che NRR Region l/,'L7

5. H. Hanauer, ED0 J. J. Fouchard, PA SS Bldg /l,' M (MAIL) 3 N. M. Haller, MPA C. V. Sniith, NMSS T. J. McTiernan, DIA l

R. G. Ryan, OSP R. Minogue, SD l

H. K. Shepar, ELD l

6 P?' "" NARY NOTIFICATION I

9006040113 PDR I&E ppR i

i PNO-78-119 a