ML20248E748

From kanterella
Jump to navigation Jump to search
Mod 2,obligating Funds Against Designated Guaranteed Min,To Technical Assistance to Support Licensing Activities
ML20248E748
Person / Time
Issue date: 09/25/1989
From: Stephen Bell
NRC OFFICE OF ADMINISTRATION (ADM), SONALYSTS, INC.
To:
Shared Package
ML20248E741 List:
References
CON-FIN-L-1289-9, CON-NRC-03-89-031, CON-NRC-3-89-31 NUDOCS 8910050404
Download: ML20248E748 (2)


Text

' H QAMENDMENT OF SOLICITATION / MODIFICATION C F CONTRACT l1

] -W.

m

  • ' ' 2. AMENOMENT/eaOOtFsCAT 40N NO.
3. LFFECTIVE DATE

. REQUIS4 TION /PU,.0 4ASE REQ. NO.

5. MtOJECT NO. (f( appidcoNe)

.G; 9/25/89 1RR-89-031 dtd 9/22/89

.Two (2)--

A

7. ADMantsTcnEO av (st e ther mn scene s) 'COOG

, o. essuc0 *Y l

t ' U.S. Nuclear Regulatory Commission.

Division of Contracts & Property Management Washington, D.C. :20555 b

(/)

9A. AMCNOMCNT OF SOL 4CaTATION NO.

16. roAMC AND AbonCSS OF CONT RACiOR (No. airect. county,Sista and Z11' Code /

Sonalysts,'Inc.=

su.DAico<sEstrzS,,,,

'215. Parkway. North P.O.' Box 280-aca. MOOm.CAuON OF CONT a^CTeOnOCa Waterford, CT 06385 NO.

X NRC-03-89-031 I

nou. DATED (SEE ITEnt 238

- 7/10/89 CODE l FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS is extended.

is riot ex-The above numbered solicitation is amentjed as set orth in item 14. Tlie hour and date specified for recipt of Offers f

' tended.

g i i ded, by'one of the following snethods:

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solic ta submitted; or (cl By separate letter or tetogram which includes a reference to the solicitation and amendment numb Iz) Or completing Items 8 and 15. and returning.

T MENT TO DE RECElvEO AT THE PLACE DESIGNATED FOR THE RECEIPTOF f

letter, provided each telegram or letter makes reference to the solicitation and this amendment. and is received prior APPN No.: 31X0200.209 B&R No.: 920-19-03-02-0 FIN No.: L-1289-9 Obligate: $35,650.00 la ACCOUN TJNC AND API'HOPRI ATION DAT A (If,roui,ed)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

(Specify authorityJ THE CHANGES SCT FOHTH 4N ITEM 14 ARC MAOC(N THE CON.

g A. THIS CHANGC OnOCR 85155UCD PURSUANT TO; Tn ACT ORDCrt NO IN ITCM 10A.

i ffice.

D. THE A00VC NUMOCRCO CONTR ACT/OROCR IS MOOf ff EO TO RCFLCCT THE ADMINISTR ATIVE CHANGCS (such

- appropriation date. e tc.) SCT FORTH IN 8TCM 14. PURSUANT TO THC AUTHORITY OF FAR 43.lo3(b).

C, T HIS SUPPLCMCN T AL AG t4 CCMCN T is CN TCnCO sNI O PUR5U ANT TO AUTHO RIT Y OFT O. OT HCR 4.Sncsfy Is pe of, nods /statson and curlsorsty)

X FAR.16.504 - Indefinite-Quantity Contract Copics tc the issubg of fiCe.

Contractor b is not, is required to sign this document and return E. IMPORT ANT:

u. Oe5CRse r,0N Or AueNOueN riMOD,r, CAT,0N coce.nizad sy ucr. <<.an ha.denza. enciud.nz aoucia.c.onicanrr.ce <,r ices m.as h<<< t<=.isic.>

'This modification is issued to revise the contract in order to irclude obligation of funding against the. designated minimum guaranteed to the contractor in Clause I.7, Minimum and

'Maximua Amounts. Accordingly, the contract is hereby revised as follows:

Section B, Supplies or Services and Prices / Costs, Subsection B.2, Consideration and 1.

Obligation--Task Orders, is revised to read as follows:

8910050404 890925 PDR CONTR NRC-03-89-031 PNU

. C.g.g o.owo oe. ~..u u,,m... c onomo, oi...or u

.n m e...nc.a in..,, A o, i o A....mio o,,

...,.. u,.. unc

.n,,, ;n<, s'n. o....

v n, A. Nw c AND u r LC Or CONI n AC s.No O, r.C Cn <Tw o<,+ A. u e.,c AN u.., u o, 3.uN e n,T,,,, o,,,n,, r, Sharon Bell gTcy,S,Q ~+ii t M5 CON t aOJtTiriisfrNi~gl ?pi, ~ ^

' y 3c pn g ( $ g,qn g g,,7 g,g, y y., y n j,,,, y n,3 g a g,9 4 t%gno tu.o ol cun t.ar t.e; of f,a.s p...

hc Y ^l

.sv t **

.m

<*,r.>

u *,,,, d s,, s, n p S T ArJOhltO f 0HM 33 gaat y ; ts -

yjjos

%fd ik4) 04 3 S? c o?.s r%ey osc o so, G i>*s e n o m c e u, +,. %i 4*sa C y ste)", $. Ue t en s*e v,.y, un a

p j.

A T}

3 b;

NRC-03-89-031' Modification No. 2 Page 2 of 2 B.' 2 CONSIDERATION AND OBLIGATION--TASK ORDERS (MAR 1989) a.

The total estimated amount of this contract (ceiling) for the products / services ordered,_ delivered, and accepted under this contract is'$4,014,549.00. The Contracting Officer may:

unilaterally increase this amount as necessary for completion of orders places with the contractor during the contract period provided such orders are within any maximum ordering limitation prescribed under this contract.

L

.b,

' The amount presently obligated with respect to this contract is 4

$35,650.00..This amount represents a portion of funds obligated against the designated minimum amount of the contract (see Clause i

I.5, Minimum and Maximum Amount). Additional funds obligated against'.this guaranteed minimum are obligated under individual task orders issued prior to Modification 1.

The Contracting Officer shall-issue orders for work up to the minimum amount stated.

Individual task orders shall state whether funds for that effort are being obligated on the task order or have been previously. obligated on the contract.

c.

A total-estimated cost and fee, if any, will be negotiated for L

each task order and will be incorporated as a ceiling in the resultant task order.

The Contractor shall comply with the provisions of 52.232-20--Limitation of Cost for fully funded task orders and 52.232-22--Limitation of Funds for incrementally funded task orders, issued hereunder.

(End of Clause)

/

2.

Clause I.5, Minimum and Maximum Amount, is revised to read as follows:

-1.5 Minimum and Maximum Amount During the life of this contract, the Government shall place orders totaling a minimum of one (1) staff year of effort. Total orders placed during the life of the contract shall not exceed fifty-five (55) staff years of effort.

For the purposes of this contract, a staff year is defined as 2,080 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> per year of both professional and non professional labor at a total estimated cost of $72,992.00."

All other terms and conditions of this contract, including the ceiling amount of $4,014,549.00, remain unchanged.

__-_--___-_-______-__a