ML20248E583

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Project Managers Handbook. Rev Emphasizes Project Manager as Focal Point for Assigned Unit. Responsibility for Periodic Rev & Publication of Handbook Delegated to Project Managers Handbook Committee
ML20248E583
Person / Time
Issue date: 03/30/1989
From: Varga S
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-72000, NUDOCS 8904120293
Download: ML20248E583 (4)


Text

.

l-s'

/*

UNITED STATES y

p, NUCLEAR REGULATORY COMMISSION i

g ej WASHINGTON, D. C. 20555 k....+/

March 30,1989 MEMORANDUM FOR:

NRR Project Managers

=

FROM:

Steven A. Varga Acting Associate Director for Projects Office of Nuclear Reactor Regulation

)

1

SUBJECT:

DISTRIBUTION OF REVISION 1 0F THE PM HANDBOOK j

(TAC NO. 72000)

We have published Revision 1 of the FM Handbook, which replaces Revision 0 in its entirety. A copy is enclosed for your use.

I g

Revision 1 was written in accordance with the U.S. Government Style Guide, and

[

was edited by Ray Sanders, Technical Editor.

It is a much thinner book than Revision 0 since all outdated appendices have been eliminated.

In place of appendices, licensing assistants and NUDOCS are specifically identified as sources of current sample documents, a

Revision 1 emphasizes the PM as the NRR focal point for the assigned plant, in accordance with management philosophy. The following newly written sections describe either " required" PM actions (documents that prescribe these are cited), or recommend " good" practices currently used by some PMs. These sections should be read by all as a minimum:

1.3, Overview of PM Functions 1.4.3, PRA 2.4.7-2.4.9, Conduct of Meetings 2.4.24 and 3.6.13, Briefings by 01 on Restart and Licensing 3.2.2, Interaction with the Regional Office, PM Inspections 3.3.1.2, PM Reviews / Technical Branch Reviews 3.3.2, Emergency Authorizations 3.4.4, 10 CFR 50.59 Reviews by PMs 3.4.11, Site Visits by PMs 3.4.13 Review of Updated FSAR 3.4.14, Enforcement Conference and Action 3.6.3, Interpretation of Technical Specifications 5.17, Review of Inspections Reports 6.2.1, Document Control 0F0 d

g

Contact:

Peter Tam (2-1307)

I 8904120293 890330 PDR ORG NRRB

The responsibility for periodic revision and publication of the handbook has been delegated to the PM Handbook Consnittee, consisting of T. Colburn, D. Fischer, K. Heitner, J. Norris N d P. Tam (Chairman). The comittee welcomes suggestions for future revisions, preferably in the form of marked-up pages or new writing.

To ensure consideration of your contribution, send a copy to each comittee member.

Steven A.

a' a r

Acting Associate Di tor for Projects Office of Nuclear Reactor Regulation I

cc. T. flurley J. Sniezek J. Partlow S. Varga G. Holahan B. Boger G. Lainas it. Virgilio L. Rubenstein

i 1

  • The responsibility for periodic revision and publication of the handbook has been delegated to the PM Handbook Committee, consisting of T. Colburn, D. Fischer, K. Heitner, J. Norris and P. Tam (Chairman). The committee welcomes suggestions for future revisions, preferably in the form of marked-up pages or ner? writing.

To ensure consideration of your contribution, send a copy to each con:.ittee member.

b signed by Steven A. Varga Acting Associate Director for Projects Office of Nuclear Reactor Regulation DISTRIBUTION PDI-4 Reading SVarga JStolz PTam SNorris T.flurley J. Sniezek J. Partlow S. Varga G. Holahan B. Boger G. Lainas M. Virgilio L. Rubenstein Docket files PDR

[MEM0 TO PROJ MANAGERS]

  • See previous concurrence
  • PM:PDI-@4
  • D:PDI-4 D
  • LA:PDI-4 PTam:bd JStolz

'Va SNorris 03/27/89 03/30/87 03/30/89 3%+ ' 89

i The responsibility for periodic revision and publication of the handbook has been delegated to the PM Handbook Committee, censisting of T. Colburn, D. Fischer, K. Heitner, J. Norris and P. Tam (Chairman). The committee welcomes suggestions for future revisions, preferably in the form of marked-up pages or new writing.

l To ensure consideration of your contribution, send a copy to each committee member.

Steven A. Varga-Acting Ass ciate Director for Projects

,/

DISTRIBUTION PDI-4 Reading SVarga JStolz PTam SNorris

/

[MEM0 TO PROJ MANAGERS]

LA PDI-4 PM:PDI-D:PDI-S (A)ADP SNdf.C PTam:bd

(

GStolz{iih SVa rga 03/R7/89 03/30/8 f 03/9 /89 03/ /89

_