ML20248D914

From kanterella
Jump to navigation Jump to search
Forwards NRC Markup of Owners Groups Proposed New STS for Containment Sys Chapters.Review Identified That Extensive Changes from Existing Spec Requirements Proposed & Differences Inconsistent Among Owners Groups.W/O Encl
ML20248D914
Person / Time
Issue date: 09/26/1989
From: Calvo J
Office of Nuclear Reactor Regulation
To: Hall W
NUCLEAR ENERGY INSTITUTE (FORMERLY NUCLEAR MGMT &
References
NUDOCS 8910050007
Download: ML20248D914 (7)


Text

.

j

' _-y p - '.

. (psattog.

+.; r

.,og UNITED STATES ;

g NUCLEAR REGULATORY COMMISSION j

WASHINGTON, D. C. 20555 p'

September 26,19S9 I

I '.,

Mr. Warren J. Hall, Manager-Operations,' Management, and Support Services Division Nuclear. Management and Resources Council 1776 Eye Street,. Suite 300' Washington, D.C.

20006-2496

.Mr. Hall:

1 L

SUBJECT:

STAFF MARKUP OF THE OWNERS GROUPS ' PROPOSED NEW STANDARD TECHNICAL SPECIFICATIONS (OG-STS)

Enclosed are marked up.pages incorporating staff comments on the L

proposed.. Standard Technical Specifications (STS) for the Containment Systems chapters from each of the four Owners Groups.

'Pages.without comments were normally omitted from the enclosure.

While markups of some of the Bases are included for some Owners

' Groups, a comprehensive review of the Bases has not been completed, and any.further comments on the Bases will be forwarded at a later date.- Supplemental specifications submitted by the owners groups will also be marked up and forwarded at a later date.

We incorporated some of the staff comments on the Wordperfect 5.0 versions of.the new STS to improve legibility.

Once technical issues are resolved, editorial revisions will be needed to make fonts, page layouts, and wording consistent with the writer's guide.

-The Containment chapter will also be consistently renumbered to "3.6" at a later date.

Our ' review identified that extensive changes from the existing specifications

. requirements were proposed and that these differences were not consistent among the owners groups' proposed new STS.

In order to accommodate the agreed upon schedule and to achieve.new STS that are acceptable to both industry and the NRC, the staff has taken the lead to produce the enclosed containment System STS for each Owners Group.

We trust that the Owners Groups will act promptly to achieve a

consensus response to the enclosures, and thus reduce the need for our integration in the future.

b giy \\

o NRC PdE CENTER COPY 8910050007 890926 PDR-REVQP ERCNUM C

i L

\\. '

The Owners Groups are requested to coordinate with NUMARC so that we can schedule a meeting to discuss this chapter as soon as i

practicable.

l Sincerely, Jose A.

Calvo, Chief Technical Specifications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation Nuclear Regulatory Commission

Enclosures:

As stated cc: w/ enclosures Ms. J. R. Hinds - Westinghouse Owners Group Mr. R. A.

Bernier - CE Owners Group Mr.

C.

W.

Smyth - Babcock & Wilcox Owners Group Mr. R. R.

Sgarro - BWR Owners Group DISTRIBUTION:

OTSB R/F DOEA R/F CERossi Central Files JACalvo RLEmch DCFischer CHBerlinger CHaughney CEMcCracken OTSB Members PDR (CONT-OG) s set osawA concure-OTS : DOEA:NRR OTSB:DOEA:NRR SPLB: DEST:NRR ESGB: DEST:NRR S

U rgens%i-DCFischert-CEMcCrackenF GBagchit-08/25/89 08/

/89 08/

/89 08/

/89 EMCB: DEST:NRR OTSB:DOEA:N OT A:NRR CYChengk FMRienha JACa

/W 08/

/89 09/J//89 09/. g8 lG 3l ' qN (A '

O 3

L l\\'

t

','C Sept'mber 26, 1989 e

I

(

The Owners Groups are requested to coordinate with NUMARC so that we - can schedule - a. meeting to discuGs. this chapter as soon as i

all the arrangements are completed.

Sincerely,-

ORIGINAL SIGNED BY JOSE A. CALVO Jose A..Calvo, Chief Technical' Specifications Branch Division of Operational Events-Assessment--

Office of Nuclear Reactor Regulation'

' Nuclear Regulatory Commission

Enclosures:

As stated cc: w/ enclosures Ms. J. R. Hinds.- Westinghouse Owners Group Mr.

R..A.

Bernier - Combustion Engineering Owners Group 4 Mr.

C. W. Smyth - Babcock & Wilcox Owners Group Mr. R. R. Sgarro - Boiling Water Reactors Owners Group DISTRIBUTION: W/o enclosures OTSB R/F DOEA s R/F_,, _. _ FJMiraglia CERossi k_ Central 5Fil'e's!

JACalvo RLEmch DCFischer.

CHBerlinger CHaughney CEMcCracken OTSB Members PDR (CONT-OG)-

  • (see previous concurrences)
  • OTSB:DOEA:NRR
  • 0TSB:DOEA:NRR *SPLB: DEST:NRR
  • ESGB: DEST:NRR SRJuergens DCFischer CEMcCracken GBagchi 08/ 28/89 08/28/89 09xas/ 19/89 08/ 29/89
  • EMCB: DEST:NRR
  • 0TSB:DOEA:NRR OTSB:DOEA:NRR CYCheng FMRienhart JACalvo /1/c 08/ 30/89 09/21/89 09/26/89 1

p l.

l 1

we ' can schedule a' meeting to discuss this chapter.as soon as practicable.

Sincerely,.

Jose A.'Calvo, Chief Technical Specifications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation Nuclear Regulatory Commission

Enclosures:

As stated' cc: w/ enclosures Ms. J. R. Hinds - Westinghouse Owners Group Mr. R. A. Bernier - CE Owners Group

.Mr.

C.-W. Smyth - Babcock & Wilcox Owners Group Mr. R. R. Sgarro - BWR Owners Group DISTRIBUTION:

OTSB R/F DOEA R/F CERossi Central Files JACalvo RLEmch DCFischer.

.CHBerlinger CHaughney CEMcCracken

.OTSB Members PDR (CONT-OG) betabhth corottertr i

OTSB N A:NRR OTSB:DOEA:NRR SPLB: DEST:NRR ESGB: DEST:NRR SRJ12drif4ns -

DCFischer CEMcCrackent GBagchiY 08/98/89 08/gg/89 08/

/89 08/

/89 EMCB: DEST:NRR OTSB:DOEA:NRR CYChengt JACalvo 08/

/89 0%/

/89

L.

}

^g..

[

l l

.we ' can schedule a meeting to - discuss this chapter as soon as-practicable.

Sincerely, Jose.A. Calvo, Chief Technical Specifications l Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation Nuclear Regulatory Commission

Enclosures:

As-stated cc: w/ enclosures Ms. J. R. Hinds - Westinghouse' Owners Group Mr. R. A.

Bernier - CE Owners Group Mr. C. W.

Smyth - Babcock & Wilcox Owners Group Mr. R. R. Sgarro - BWR Owners Group DISTRIBUTION:

OTSB R/F DOEA R/F CERossi Central Files JACalvo RLEmch DCFischer CHBerlinger CHaughney CEMcCracken OTSB Members PDR (CONT-OG)

SP_ JMfA OTSK A:NRR OTSB:DOEA:NRR LB: DEST:NRR ESGB: DEST:NRR l

SRJud ens DCFischer CEMcCracken GBagchi 08/95/89 08/gg /89 087 /89 08/

/89 EMCB: DEST:NRR OTSB:DOEA:NRR CYCheng JACalvo 08/

/89 08/

/89

W y

L

- we.can schedule a meeting to discuss this chapter as soon as practicable.

Sincerely, Jose A. Calvo, Chief Technical Specifications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation' Nuclear Regulatory Commission

Enclosures:

As stated cc: w/ enclosures Ms. J. R. Hinds - Westinghouse Owners Group Mr. R. A. Bernier - CE Owners Group Mr. C. W. Smyth - Babcock & Wilcox Owners Group Mr.

R.'R.

Sgarro - BWR Owners Group DISTRIBUTION:

OTSB R/F DOEA R/F CERossi Central Files JACalvo RLEnch DCFischer CHBerlinger CHaughney CEMcCracken OTSB Members PDR.

(CONT-OG)

)h OTK @e A:NRR OTSB:DOEA:NRR SPLB: DEST:NRR SGB. DEST:NRR SRJudrg)ns

.DCFischer CEMcCracken GBagchi 08/95/89 08/gg /89 08/

/89 086j)/89 EMCB: DEST:NRR OTSB:DOEA:NRR CYCheng JACalvo 08/

/89 08/

/89

.~'

~

r we ' can schedule a meeting to discuss this chapter as soon as practicable.

Sincerely, Jose A. Calvo, Chief Technical Specifications Branch Division of Operational Events Assessment Office of Nuclear-Reactor Regulation Nuclear Regulatory Commission

Enclosures:

As stated

.cc: w/ enclosures Ms. J. R. Hinds - Westinghouse Owners Group Mr. R. A. Bernier - CE Owners Group Mr.

C. W. Smyth - Babcock & Wilcox Owners Group Mr.

R.-R.

Sgarro - BWR Owners Group DISTRIBUTION:

OTSB R/F DOEA R/F CERossi Central Files JACalvo RLEmch DCFischer CHBerlinger CHaughney CEMcCracken OTSB Members PDR (CONT-OG)

OTSKhA:NRR OTSB:DOEA:NRR SPLB: DEST:NRR ESGB: DEST:NRR SRJudrcfens DCFischer CEMcCracken GBagchi 08/95/89 08/gg/89 08/

/89 08/

/89 r EMC ST:NRR OTSB:DOEA:NRR p YCheng JAcalvo h

08/Jb/89 08/

/89 1

L i

_