Forwards RAI Re Re GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Hrps, for Plant,Units 1 & 2.Response Requested within 30 Days of Receipt of Ltr
ML20248C745
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/29/1998
From: Dromerick A
NRC (Affiliation Not Assigned)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
References
GL-97-04, GL-97-4, TAC-M99971, TAC-M99972, NUDOCS 9806020243
Download: ML20248C745 (5)


Text

Mr. Chrrl:s H. Crus 2 May 29, 1998 c

Vice Pr2sid:nt - Nucirr En:rgy Britimore G:s cnd Electric Comp:ny Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657

SUBJECT:

REQUEST FOR AbblTIONAL INFORMATION CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS.1 AND 2 - GENERIC LETTER 97-04 " ASSURANCE OF SUFFICIENT NBT POSITIVE SUCTION HEAD FOR EMERGENCY CORE COOLING AND CONTAINMENT HEAT REMOVAL PUMPS (TAC NOS. M99971 AND M99972)

Dear Mr. Curse:

The staff issued Generic Letter 97-04, " Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal Pumps" on October 7,1997. The GL requested that licensees provide information necessary to confirm the adequacy of the net positive suction head available for emergency core cooling and containment heat removal pumps. By letter dated January 6,1998, Baltimore Gas and Electric Company submitted its l

90-day response to GL 97-04. The staff has reviewed your response and has determined that additional information is necessary. Please provide the information in the enclosed request within 30 days from the date of this letter. Should you have any questions, please contact me at (301) 415-3473.

" "' Y' Original Signed by:

Alexander W. Dromerick, Senior Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 i

l

Enclosure:

Request for Additional

-(Q

)

Information i

i i

cc w/ encl; See next page DISTRIBUTION:

1 If Docket Fliew J. Kudrick, NRR (tSy' kk h.h PUBLIC K. Kavanagh, NRR 4

J. Zwolinski (A)

R. Caruso S. Bajwa C. Hehl, Region i A. Dromerick OGC DOCUMENT NAME: G:\\CC1-2\\CCM99971.RAI To eoctive a copy of this document. Indicate in the box: "C" = Copy without einclosures "E" = Copy with enclosures "N" = No copy I bCE PM:RDI_-L LA:PDI-In\\1 SRXil:)4RR f

SCSB:NRR,

D:PDl-1 J

DF NAME ADfdmMck Slittle" RCAMso JKudrick}M\\,

SBajwa44'N DATE

}/S9 /98 5/J8 /98 5/29[/98 5/f $ / M 5/ 29 /98

/"

~

0FFICIALRECORDCOPYp 9906020243 980529 t

POR ADOCK 05000317 LF PDR

Mr. Ch:rles H. Cruse May 29, 1998

+

Vice Presid:nt - Nucl cr Enirgy B ltimore G:s cnd ElIctric Comp;ny i

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS.1 AND 2 - GENERIC LETTER 97-04

  • ASSURANCE OF SUFFICIENT NET POSITIVE SUCTION HEAD FOR EMERGENCY CORE COOLING AND CONTAINMENT HEAT REMOVAL PUMPS (TAC NOS. M99971 AND M99972)

Dear Mr. Curse:

The staff issued Generic Letter 97-04, " Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal Pumps" on October 7,1997. The GL requested that licensees provide information necessary to confirm the adequacy of the net positive suction head available for emergency core cooling and containment heat removal pumps. By letter dated January 6,1998, Baltimore Gas and Electric Company submitted its 90-day response to GL 97-04. The staff has reviewed your response and has determined that additionalinformation is necessary. Please provide the information in the enclosed request within 30 days from the date of this letter. Should you have any questions, please contact me at (301) 415-3473.

Y' Original Signed by:

Alexander W. Dromerick, Senior Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318

Enclosure:

Request for Additional Information cc w/ encl: See next page DISTRIBUTION:

Docket File J. Kudrick, NRR PUBLIC K. Kavanagh, NRR J. Zwolinski (A)

R. Caruso S. Bajwa C. Hehl, Region i A. Dromerick OGC DOCUMENT NAME: G:\\CC1-2\\CCM99971.RAI To treelve a copy of this document. Indicate in the boa: "C" e Copy without enclosures "E" = Copy with enclosures "N" = No cop'r l

0FFICE PM: PDI_-1, LA:PDI-1pQ SR$:flRR F

SCSB:NRR D:PDI-1

. a 3

NAME-ADfdmirTck Slittle" RCMdso JKudricM\\,

SBajwa/A'N DATE

~5/e /98 5/J8 /98 5/lff/98 5/fG/Ml 5/ 29 /98

/~

0FFICIALRECORDCOPYf

l.

s@ Uh l

p UNITED STATES

\\

g j

NUCLEAR REGULATORY COMMISSION o

WASHINGTON, D.C. 30666 4 001

%,..... p#

May 29, 1998 Mr. Charles H. Cruse Vice President-Nuclear Energy Baltimore Gas and Electric Company i

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway l

Lusby, MD 20657

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS.1 AND 2 - GENERIC LETTER 97-04 " ASSURANCE OF SUFFICIENT NET POSITIVE SUCTION HEAD FOR EMERGENCY CORE COOLING AND CONTAINMENT HEAT REMOVAL PUMPS (TAC NOS. M99971 AND M99972 )

Dear Mr. Cruse:

The staff issued Generic Letter 97-04," Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal Pumps" on October 7,1997. The GL requested that licensees provide information necessary to confirm the adequacy of the net l

positive suction head available for emergency core cooling and containment heat removal l

pumps. By letter dated January 6,1998, Baii;more Gas and Electric Company submitted its 90-day response to GL 97-04. The staff has reviewed your response and has determined that additionalinformation is necessary. Please provide the information in the enclosed request within 30 days from the date of this letter. Should you have any questions, please contact me at (301) 415-3473.

Sincerely, l

Alexander W. Dromerick, Senior Project Manager r

Project Directorate 1-1 Division of Reactor Projects - t/11 Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 l

Enclosure:

Request for Additional information i

cc w/ encl: See next page

Mr. Charies H. Cruse Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant cc:

President Mr. Joseph H. Walter, Chief Engineer Calvert County Board of Public Service Commission of Commissioners Maryland 175 Main Street Engineering Division Prince Frederick, MD 20678 6 St. Paul Centre Baltimore, MD 21202-6806 James P. Bennett, Esquire Counsel Kristen A. Burger, Esquire Baltimore Gas and Electric Company Maryland People's Counsel P.O. Box 1475 6 St. Paul Centre Baltimore, MD 21203 Suite 2102 Baltimore, MD 21202-1631 Jay E. Silberg, Esquire Shaw, Pittman, Potts, and Trowbridge Patricia T. Bimie, Esquire 2300 N Street, NW Co-Director Washington, DC 20037 Maryland Safe Energy Coalition P.O. Box 33111 Mr. Thomas N. Pritchett, Director Baltimore, MD 21218 NRM Calvert Cliffs Nuclear Power Plant Mr. Loren F. Donatell 1650 Calvert Cliffs Parkway NRC Technical Training Center Lusby, MD 20657-4702 5700 Brainerd Road Chattanooga, TN 37411-4017 Resident inspector U.S. Nuclear Regulatory Commission P.O. Box 287 St. Leonard, MD 20685 Mr. Richard I. McLean, Manager Nuclear Programs Power Plant Research Program Maryland Dept. of Natural Resources Tawes State Office Building, B3 l

Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 l

l I

I 1

I l

1 REQUEST FOR ADDITIONAL INFORMATION CALVERT CLIFFS NUCLEAR POWER PLANT. UNIT NOS.1 AND 2 l

QUESTIONS REGARDING GENERIC LETTER 97-04 t

1. What is the maximum sump temperature assumed in the NPSH analyses?
2. In response to question 2, it was stated that new NPSH calculations were in progress and would be complete by March 15,1998. The preliminary results of the new calculation were presented in response to question 2. What were the changes made in the new calculation in i

progress and will the final results be submitted to the staff?

3. In response to question 3, it was stated that 1he calculations of record have been updated to reflect the appropriate plant inputs, operating conditions, and industry operating experience."

f Describe the changes made and why they are conservative.

l 1

I Enclosure

,