ML20248B704
| ML20248B704 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 07/27/1989 |
| From: | Cesare J SYSTEM ENERGY RESOURCES, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| AECM-89-2-003, AECM-89-2-3, NUDOCS 8908090310 | |
| Download: ML20248B704 (4) | |
Text
.- _-.. _ _ _ _
Y
.+
y, r ~
EWTEM EMNtiiY RE90tA9CEE.IE l.
JOHNG CLsA!E JR I.
ou,co July 27, 1989 ace ucerurg L
U.S. Nuclear Regulatory Commission Mail Station PI-137 l
Washington, D.C.'
20555 Attention: Document Control Desk Gentlemen:
SUBJECT:
Grand Gulf Nuclear Station-Unit 2 Docket No. 50-417 Construction Permit No. CPPR 119 Transmittal of Environmental Protection Program Report for Six Months Ending June 30, 1989 AECM-89/2-0003 Attached is a report entitled " Summary of Environmental Protection Program Respecting Construction of Grand Gul# Nuclear Station (GGNS) Unit 2 for Six Months Ending June 30, 1989". This report is submitted as required by Staff Exhibit 2-A referenced in Subsection 3.E.1'of Applicant's Construction Permit No. CPPR-119.
Yours Truly, M7.h kcsc&
JGC:beb Attachment cc:
(SeeNextPage) 8908090310 8907py f('
gDR ADOCK 05000417 PNU C@I
' PENV EPP LETTER /890fp3g 6x13070 xxsON fA$$C5m 3G53070 l MD OM 920
- mcru seames conray u__________
o AECM-89/2-0003 Page 2
<c:.Mr. W. T. Cottle (w/a)
Mr. D.'C. Hintz (w/a)
Mr. T. H. C1cninger (w/a)
'Mr. J. M. Levine (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds'(w/a)
Mr. H. L. Thomas.(w/o)
Mr. H. O. Christensen (w/a)
Mr. Steward D. Ebneter (w/o)
Regional Administrator U.S. Nuclear Regulatory Commissicn Region II 101 Marietta St., N.
W., Suite 2900 Atlantt, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 14B20 Washington, D.C.
20555 i
I 1
1 PENV EPP LETTER /890630 - 2 i
l
I'
.)
m Attachment to AECM-89/2-0003
.j J
SUM. MARY OF ENVIRONMENTAL PROTECTION PROGRAM RESPECTING CONSTRUCTION OF GRAND GULF NUCLEAR STATION (GGNS) UNIT 2 l
FOR SIX MONTHS ENDING JUNE 30, 1989 L
' Construction Highlights i
o Unit 2 construction was suspended u. September 1985 with approximately 35%.of fVi construction completed based on the.
(
estimated manhours neeued to comp M e the Unit. Minimal Unit 2 j
- activities were for the purpose of long term equipment and
.2
. structural maintenance.
}
i Vehicular Movemer,t o
No "off limit" violations were observed during the reporting period.
Dust Control o.
No dust control violations were observed during the reporting period.
Smoke Control o
No smoke violations occurred during the reporting period.
Erosion Control l
o Rainfall was recorded on 42 occasions-during the reporting pericd, with an accumulated total of 30.66 inches.
Chemical & Solid Waste Control o
No violations or improprieties of Mississippi waste disposal regulations occurred during the reporting period.
Noise Control o
No excessive noise levels were detected during the reporting period.
Sediment Basins A & B I
o There were no construction-associated problems with Sediment Basins A or B during the reporting period.
1 PENV EPP ATT I/8906 - 1
A
,T h d
~A*.
Attachment to AECM-89/2-0003
- /
f R_eginnal Groundwater Dewatering Wells e
o-The 12 regional groundwater wells were read 13 times during
/
the reporting. period with no problems encountered.
- Vegetation Survey-1 o
No vegetational abnormalities were observed during the reporting period.
Transmission Lines o
Transmission line surveys were ruspended in 1988 based on the stabilization of soil and vegetation : observed along these 1 4es during previous surveys.