ML20248B704

From kanterella
Jump to navigation Jump to search
Forwards Summary of Environ Protection Program Re Const of Facility for 6 Months Ending 890630,per NRC Exhibit 2-A Requirement as Ref in CP CPPR-119,Subsection 3.E.1
ML20248B704
Person / Time
Site: Grand Gulf 
Issue date: 07/27/1989
From: Cesare J
SYSTEM ENERGY RESOURCES, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AECM-89-2-003, AECM-89-2-3, NUDOCS 8908090310
Download: ML20248B704 (4)


Text

.- _-.. _ _ _ _

Y

.+

y, r ~

EWTEM EMNtiiY RE90tA9CEE.IE l.

JOHNG CLsA!E JR I.

ou,co July 27, 1989 ace ucerurg L

U.S. Nuclear Regulatory Commission Mail Station PI-137 l

Washington, D.C.'

20555 Attention: Document Control Desk Gentlemen:

SUBJECT:

Grand Gulf Nuclear Station-Unit 2 Docket No. 50-417 Construction Permit No. CPPR 119 Transmittal of Environmental Protection Program Report for Six Months Ending June 30, 1989 AECM-89/2-0003 Attached is a report entitled " Summary of Environmental Protection Program Respecting Construction of Grand Gul# Nuclear Station (GGNS) Unit 2 for Six Months Ending June 30, 1989". This report is submitted as required by Staff Exhibit 2-A referenced in Subsection 3.E.1'of Applicant's Construction Permit No. CPPR-119.

Yours Truly, M7.h kcsc&

JGC:beb Attachment cc:

(SeeNextPage) 8908090310 8907py f('

gDR ADOCK 05000417 PNU C@I

' PENV EPP LETTER /890fp3g 6x13070 xxsON fA$$C5m 3G53070 l MD OM 920

- mcru seames conray u__________

o AECM-89/2-0003 Page 2

<c:.Mr. W. T. Cottle (w/a)

Mr. D.'C. Hintz (w/a)

Mr. T. H. C1cninger (w/a)

'Mr. J. M. Levine (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds'(w/a)

Mr. H. L. Thomas.(w/o)

Mr. H. O. Christensen (w/a)

Mr. Steward D. Ebneter (w/o)

Regional Administrator U.S. Nuclear Regulatory Commissicn Region II 101 Marietta St., N.

W., Suite 2900 Atlantt, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 14B20 Washington, D.C.

20555 i

I 1

1 PENV EPP LETTER /890630 - 2 i

l

I'

.)

m Attachment to AECM-89/2-0003

.j J

SUM. MARY OF ENVIRONMENTAL PROTECTION PROGRAM RESPECTING CONSTRUCTION OF GRAND GULF NUCLEAR STATION (GGNS) UNIT 2 l

FOR SIX MONTHS ENDING JUNE 30, 1989 L

' Construction Highlights i

o Unit 2 construction was suspended u. September 1985 with approximately 35%.of fVi construction completed based on the.

(

estimated manhours neeued to comp M e the Unit. Minimal Unit 2 j

- activities were for the purpose of long term equipment and

.2

. structural maintenance.

}

i Vehicular Movemer,t o

No "off limit" violations were observed during the reporting period.

Dust Control o.

No dust control violations were observed during the reporting period.

Smoke Control o

No smoke violations occurred during the reporting period.

Erosion Control l

o Rainfall was recorded on 42 occasions-during the reporting pericd, with an accumulated total of 30.66 inches.

Chemical & Solid Waste Control o

No violations or improprieties of Mississippi waste disposal regulations occurred during the reporting period.

Noise Control o

No excessive noise levels were detected during the reporting period.

Sediment Basins A & B I

o There were no construction-associated problems with Sediment Basins A or B during the reporting period.

1 PENV EPP ATT I/8906 - 1

A

,T h d

~A*.

Attachment to AECM-89/2-0003

  • /

f R_eginnal Groundwater Dewatering Wells e

o-The 12 regional groundwater wells were read 13 times during

/

the reporting. period with no problems encountered.

- Vegetation Survey-1 o

No vegetational abnormalities were observed during the reporting period.

Transmission Lines o

Transmission line surveys were ruspended in 1988 based on the stabilization of soil and vegetation : observed along these 1 4es during previous surveys.