ML20248B482

From kanterella
Jump to navigation Jump to search
Describes Plants Modifications,Consistent w/Thermo-Lag Resolution Schedule,Which Would Provide Addl Safety Margin to Support Basis for Requested 1-h Thermo-Lag Fire Barrier Exemption in CB-FA-1
ML20248B482
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/21/1998
From: Langenbach J
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1920-98-20225, NUDOCS 9806010314
Download: ML20248B482 (1)


Text

~ _ _ _.

gi e

9

,{

GPU Nucteor,Inc.

fc;4 q-j.

Route 441 South NUCLEAR

' ll"jR,a.

Tel717-944 7621 May 21~,1998

~ 1920-98-20225

' U.S. Nuclear R@ary Commission -

l' Attention:- Document Control Desk

-Washington, DC 20555 Gentlemen

Subject:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

~

Operatmg License No. DPR-50 Docket No. 50-289 10 CFR 50 Appendix R Exemption Request - Additional Information GPU Nuclear letter to the NRC dated September 8,1997 (6710-97-2373) provided responses to NRC,

request for additional information dated July 30,1997 (6710-97-3347). GPU Nuclear response to NRC Question No. 5 contained in the above referenced letters described the one (1), acetylene gas 1/2 inch diameter welded steel pipe line in fire area CB-FA-L This line is located above the suspended ceiling and the wet pipe sprinkler system in CB-FA-1. The fire risk associated with this line is considered low as described in GPU Nuclear letter dated July 30,1997. However, in outer to further support the pending exemption request for 1-hour Thermo-Lag fire barriers in CB-FA-1, GPU Nuclear proposes to remove this line from above the suspended ceiling in fire area CB-FA-1 and either relocate the line to below the suspended ceiling in CB-FA-1 or eliminate the line from CB-FA-1 and install an l

alternative gas supply at the point of use. Relocation of the line within CB-FA-1 would move the line g

so that it does not present an exposure to the Thermo-Lag barriers above the false ceiling and would place the line under the wet pipe sprinkler system which covers CB-FA-1 below the false ceiling.

Wo Proposed. plant modifications as described aboye _would be completed by December 31, 1999, consistent with the TMI-l Thenno-Lag resolution schedule, to provide the additional safety margin to support the basis for the requested 1-hour Thermo-Lag fire barrier exemption in CB-FA-1.

. lf additional information is required, please contact Mr. David J. Distel, GPU Nuclear Licensing and

. Regulatory Affairs at (973) 316-7955.

Sincerely, 9906010314 990521 b

R q:

~POR ADOCK 0 James W. Langenbach E.

Vice President and Director, TMI a