Ro:On 890902,radiation Monitor Inoperable for Period Exceeding 7 Days.Caused by Installation of Nonfuse Dependent Isolation Devices in Communication Loops of Radiation Data Mgt Sys & Need for Relocation of Monitor Due to New Design
ML20247R572
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/25/1989
From: Feigenbaum T
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NYN-89118, NUDOCS 8910020005
Download: ML20247R572 (2)


Text

_ _ _ _ _ _

i _ gi &

e: . . 96 ,

New. Hampshire -

Yankee t

NYN- 89118 September 25, 1989'

- United States Nuclear Regulatory Comraission Washington, DC 20555 Attention: .' Document Control Desk

.1

References:

Facility Operating License NPF-67. Docket No. 50-443

Subject:

Inoperability of Containment Post LOCA Area Monitor Gentlemen:

Seabrook Station Technical Specification 3.3.3.1, " Radiation Monitoring-for Plant Operations," requires that two channels of the Containment Post LOCA Area Monitor be OPERABLE at all times. Contrary to this requirement, monitor 1-RM-6576B has been inoperable for a period exceeding seven days.

This radiation monitor was deenergized on September 2, 1989, to allow the installation of non-fuse dependent isolation devices in the communication loops of the Radiation Data Management System (RDMS) in accordance with condition 2.C.(3)b of Facility Operating License NPF-67. Additionally, as part of this design change, monitor 1-RM-6576B is being relocated. The plant has remained in MODE 3, Cold Shutdown, for the duration of this equipment outage. The monitor will be returned to service upon completion of this modification.

This report is being submitted pursuant to the requirements of Seabrook Station Technical Specifications 3.3.3.1 ACTION 27; and 6.8.2. If you have any questions regarding this report, please contact Mr. Richard R. Belanger at (603) 474-9521, extension 4048.

Very truly yours, Ted C. Feigenbaum Senior Vice President and Chief Operating Officer 5$$0h PDC jb l

e t New Hampshire Yankee Division of Public Service Company of New Hampshire P.O. Box 300

  • Seabrook, NH 03874
  • Telephone (603) 474-9521

_.~3

' f _ .:t. .

-' y 4

United' States. Nuclear Regulatory Commission September 25,.1989

' Attention: Document Control. Desk Page 2

_l l

ccs, Mr. William T. Russell Regional Administrator

. United' States Nuclear. Regulatory Commission Region I 475 Allendale Road King of Prussia PA 19406 Mr. Victor Nerses, Project Manager Project Directorate I-3 United States Nuclear Regulatory Commission Division of Reactor Projects Washington DC' 20555 "Mr. Antone C. Cerne NRC Senior Resident Inspector P.O. Box 1149 Seabrook, NH 03874 l'

1 I

l \

m_________2____________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ i