ML20247R542

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to SAR for Coc 9033,incorporating Design Change That Requires That 660 Series Projector Is Placed in Steel Box for Transport
ML20247R542
Person / Time
Site: 07109033
Issue date: 05/21/1998
From: Roughan C
AEA TECHNOLOGY
To: Chappell R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20247R544 List:
References
NUDOCS 9805290171
Download: ML20247R542 (2)


Text

I.

i

.a

+

QSA 40 North Avenue 15urhngton MA 01803 Telephone pHl) 272 2000 Facsimile G81) 273 2216 Mr. Ross Chappell Package Certification Section l

Spent Fue! Project Office l

NMSS U. S. Nuclear Regulatory Commission Washington, DC 20555 Fax:

301-415-8555 21 May 1998 Docket Number 719033

Dear Mr. Chappell:

Enclosed please find six copies of the revised SAR for Certificate of Compliance number 9033. This revision incorporates a design change that requires that the 660 series projector is placed in a steel be,x for transport. As the entire SAR has been updated, I have not included a list of each specific change. In general the section have been modified to describe the addition of the steel box as an integral part of the package and its effect on compliance to 10 CFR Part 71.

A separate letter will be sont outioning our plan to get the required overpacks to the field and any necessary actions the user will have to perform.

In addition to the package change we request a name change on the certificate to reflect the new owners AEA Technology /OSA inc., as indicated in our letter dated 27 Feb 98 (copy enclosed).

We greatly appreciate your assistance with this request. If you retiuire any additional information, please contact us.

)

i Sincerely,

%l Y0 Q

Cathleen Roughan Regulatory Affairs and Safety Manager f.

M' CQivc,M 40 9eoswoi71 90os21

. ooc om,om 8

PM J

QsA a e subuda.n of (stMa?

Af A Techmdogs pk

- _ _ - _ _ _ _ _ = - _ _

.' 9 APPROVALS 4

OPL-660 AND OP-660 SAR (n.,v,ri.n &, rnag a s,i6q r )

PREPARAR/DATE:

/

d' 8IM4f Y OI REGULATORY /DATE:

a de-[

A' M %

6d 2 w'f 8

, ENGINEERING /DATE:

OUALITY ASSURANCE /DATE:

t)

L i